R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.

Slides:



Advertisements
Similar presentations
The MATURA System, an overview. Matura Slide series The Matura System, an overview.
Advertisements

Pt5 - RadWG meeting Presenting a concept Prepared by M Gastal & S Maridor
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Installing Cable Floor Heating Systems This presentation will give you a practical idea of how to install a floor heating system.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
ELENA Installation follow-up 21/05/2015 Worksite follow-up.
Computer & Telecom Rooms. 2 Business or building protection ? BUSINESS PROTECTION  Smoke is the problem  Small and Medium Size (
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
P5: UJ56 Relocation Study Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Barriere O, Le Roux P
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
PSB Beam Dump Cooling Constraints Glen Mason EN-CV 30 August 2012.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
CENF secondary beam study group 1 st meeting - 7 th May 2013 M. Calviani (EN/STI)
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Update on the Laser Beam Line
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
ICL 26/05/2010 Relocation of electronics at Pt5 Summary of week 22 + roadmap Contributions from GS-SEM, EN-MEF, EN-EL, EN-CV, BE-ASR, TE-MPE, PH-CMX, TE-EPC.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
The surface area of a cylinder is the entire area of the outside of the object. To calculate surface area, find the area the curved surface and the two.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
SIZE - Top SERVER ROOM Designed by – openbox |
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Integration of CLIC TBM in CLEX Electronics allocation and cables tracing Wilfrid Farabolini (CEA/IRFU) 16 October 2013.
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
R2E Report – P5 Safe-Room Update 20 th LSC Meeting, September 13 th 2013 CERN Radiation 2 Electronics (R2E) Project 20 th LSC Meeting September 13 th 2013.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Workshop on Cracking and Durability of Reinforced Concrete
VENTILATION OF AD TARGET Kick off meeting
UNIT IV AUXILIARY SYSTEM
Tunnel Cross Section Studies
Former Design Draft Angle Flat sides Rounded Corners
GCSE Construction & The Built Environment
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Radiation-safe area for electronics, or laser or
Section 1.0 — Fundamentals and General
Review of UJ56 relocation options
C.M. Scullion Associates Ltd
Detector hall in mountain regions
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013

Option 1: cooling ensured via apertures of 120 mm or 100 mm located at the bottom of the equipment the level of the metallic structure of the safe room) along the whole safe room (18m); air pulsed from UTAs (?) located in UL557. Option 2: cooling = air pulsed below in the metallic structure from UTAs located in UL557; 2 additional ducts to be drilled in the wall between UL557/UL558 and UL557/CMs to ensure air arrival from UTAs; cables would arrive from top in between equipment in safe room to liberate as much as possible space below the equipment in the metallic structure. Actions:- EN/MEF: show the corresponding models; - CE: check the feasibility, number of ducts and distance in between; - R2E: discuss the integration feasibility with GS/ASE-DI/ODH team; - CV: calculate the efficiency of such a cooling (UTAs located in UL557- machine side) OPTIONS proposed on Friday 26 th April (brainstorming EN/EL, EN/CV, GS/SE, MEF-INT, R2E team) Actions:- EN/MEF: show the corresponding models; - CV: calculate the efficiency of such a cooling (UTAs located in UL557- machine side)

Option 3: Safe room moved as close as possible to its initial location (when position of the ducts was decided). Cooling ensured via primary solution proposed by CV. Actions:- MEF-INT: show the corresponding models; - CV: calculate the efficiency of such a cooling ; Option 4: Cooling ensured via lateral air pulsed from UL557 via a new duct to be drilled close to the safe room; need to relocate a vertical cable tray; UTAs located in UL557. Actions:- MEF-INT: show the models; - CV: calculate the efficiency of such a cooling ; OPTIONS proposed on Friday 26 th April (brainstorming EN/EL, EN/CV, GS/SE, MEF-INT, R2E team)

USC55- level 0 – CMS side