SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.

Slides:



Advertisements
Similar presentations
SCU Development at LBNL Soren Prestemon Lawrence Berkeley National Laboratory Superconducting Undulator R&D Review Jan. 31, 2014.
Advertisements

Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Superconducting Undulator R&D Proposal for LCLS-II Paul Emma (SLAC) Superconducting Undulator R&D Review Jan. 31, 2014 please MUTE your microphones or.
LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015.
DELTA Project Overview Heinz-Dieter Nuhn – LCLS Undulator Group Leader Presented at LCLS-II Physics Meeting Tuesday, October 11, 2011.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Status of the UK Superconducting Undulator Studies Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
1 Enhancements to the Linac Coherent Light Source.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Superconducting Undulator (SCU) Development at ANL Efim Gluskin on behalf of the APS/ANL team Superconducting Undulator R&D Review Jan. 31, 2014.
Superconducting Undulator R&D Review SLAC, LBNL, ANL Jan. 31, :00 AM (PST) Kings River Room (B ), SLAC or “Go-To-Meeting” teleconference.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Undulator Working Group Summary Heinz-Dieter Nuhn – Alexander Temnykh Presented at Friday, March 9, 2012.
MCTF Michael Lamm MUTAC 5-Year Plan Review 22 August Magnet R&D for Muon Accelerator R&D Program Goals Proposed Studies Preliminary Effort and Cost.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
P. Emma, …for the SCU R&D collaboration: ANL, LBNL, SLAC August 28, 2014 P. Emma, N. Holtkamp, H.-D. Nuhn, SLAC C. Doose, J. Fuerst, Q. Hasse, Y. Ivanyushenkov,
SuperConducting Undulator (SCU) R&D Motivation and Status P. Emma For the SCU R&D collaboration: ANL, LBNL, SLAC June 27, 2014.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cost Estimate Marion White (Argonne) SCU 3-Lab Review Meeting December 16, 2014.
Linac Coherent Light Source Coherent Synchrotron Radiation Workshop
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
Magnetic Design S. Prestemon, D. Arbelaez, S. Myers, R. Oort, M. Morsch, E. Rochepault, H. Pan, T. Ki, R. Schlueter (LBNL) Superconducting Undulator Integrated.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Insertion Devices: Wigglers and Undulators Session 6 Insertion Devices Group 11/1/12.
LCLS-II Capabilities & Overview LCLS-II Science Opportunities Workshop Tor Raubenheimer February 10 th, 2015.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
External Seeding Approaches: S2E studies for LCLS-II Gregg Penn, LBNL CBP Erik Hemsing, SLAC August 7, 2014.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Preliminary Tracking Results through LCLS-II P. Emma et al., Oct. 23, 2013 Thanks to Mark Woodley and Yuri Nosochkov for MAD design work Use Christos Papadopoulos.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
G. Penn SLAC 25 September 2013 Comments on LCLS-IISC Design.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
1 0.1-nm Hard X-ray XFEL  Project Period: 2011 ~ 2015  Total Budget: 400 M$  10-GeV Electron Linac (Normal Conducting S-band, 60 Hz)  Total Length:
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
FEL SCU development at APS/ANL
Summary of Session: Magnets and undulators for light sources 2
WP5 Elliptical cavities
ILC - Upgrades Nick Walker – 100th meeting
SCU R&D Motivation P. Emma …for the SCU R&D collaboration: ANL, LBNL, SLAC Close-Out Review Mar. 3, 2016.
Undulator Tolerances for LCLS-II using SCUs
SCUs for the LCLS-II HXR FEL P. Emma July 8, 2014
LCLS-II-HE FEL Facility Overview
SCU Next Phase Meeting July 8, 2014.
Introduction to Jefferson Lab
Technical Summary - ANL
LCLS-II-HE FEL Facility Overview
A Cold SCU Phase-Shifter
Beam-Based Alignment Results
Tapering optimizations for TW level superconducting undulators:
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
Electron Beam Systems ETC and Methodology
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
SNS-PPU upgrades the existing accelerator structure
JLEIC Magnet R&D Tim Michalski NP Community Panel Review of the EIC
Presentation transcript:

SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A (J. Fuerst, ANL, 15+5) Conceptual Cryostat Design: Option-B (M. Leitner, LBNL, 15+5) SCU Development Schedule (S. Prestemon, LBNL, 15+5) Cost Estimate (M. White, ANL, 15+5)

Introduction and Performance Motivations for Superconducting Undulators in LCLS-II Paul Emma (SLAC) SCU 3-Lab Review Meeting Dec. 16, 2014

SCU 3-Lab Review Meeting, Dec. 16, 2014 LCLS-II Layout switch keV 3-15 GeV 120 Hz keV keV 4 GeV, 1 MHz HXUHXU SXUSXU SC-LinacSC-Linac Cu-LinacCu-Linac Two independent linacs and two FELs (HXU & SXU) HXU benefits from a Superconducting Undulator (SCU) SXU change not proposed here, but would benefit from much less radiation sensitivity SCU?

SCU 3-Lab Review Meeting, Dec. 16, 2014 Introduction The LCLS-II HXU (with PMU) does not perform well at 5 keV photon energy (a BESAC requirement) An SCU allows ~7 keV, or ½-length undulator at 5 keV SCUs have much less radiation sensitivity (1 MHz beam!) R&D is underway (ANL & LBNL) to build, measure, and correct 2 prototype, 1.5-m-long SCU magnets (July 2015) For an LCLS-II baseline change, we also need to consider: Conceptual design of a ~100-m SCU system (“CDR” available) LCLS-II schedule impact Latest date to decide Cost estimate to develop, build, test, and install SCUs

SCU 3-Lab Review Meeting, Dec. 16, 2014 Comments Today we present concepts, not engineering solutions Cost and schedule estimates are not fully mature (contributors also have day jobs) Many technical issues remain – risk registry is started We don’t have all the answers yet – serious effort is needed, with construction of a full cryostat prototype A well thought-out R&D effort will deliver this technology to future FELs, and possibly LCLS-II SCUs are the way forward, but need real development (time, cost, and risk mitigation)

SCU 3-Lab Review Meeting, Dec. 16, 2014 Design Options NbTi Nb 3 Sn Two different conductor technologies are being developed at present (NbTi at ANL and Nb 3 Sn at LBNL) In addition, two different cryostat designs are being explored (segmented at LBNL and non-segmented at ANL) – see coming talks Non-segmented cryostat (less cost, less accessible) Segmented cryostat (higher cost, more accessible) Separate designs are evolving now, but we will need to choose after the July-2015 R&D is complete

SCU 3-Lab Review Meeting, Dec. 16, 2014 Nb 3 Sn PMU NbTiNbTi In-Vac. PMU LCLS-II PMU: u = 26 mm B pk = 1.0 T g m = 7.3 mm LCLS-II SCU SCUs Provide Much Higher Fields than PMUs 5-mm vac. gap for all (7.3-mm mag. gap) 5-mm vac. gap for all (7.3-mm mag. gap) In-Vac  same vac. gap (5.3-mm mag. gap) In-Vac  same vac. gap (5.3-mm mag. gap) More efficient FEL

SCU 3-Lab Review Meeting, Dec. 16, 2014 Und. Length vs Upper-Limit Photon Energy (LCLS-II)In-Vac-5 In-Vac-5 NbTi-5 In-Vac-5NbTi-5 Nb 3 Sn-5 Limit 145 m PMU-5SelfSeeded u  26 mm, 23 mm, 20,mm, 18 mm 7.2 keV   4.8 keV Lower-limit photon energy = 1.5 keV (at 4 GeV) in all cases 2.1 T B max < 2.1 T 5-mm vac. gap for all (7.3-mm mag. gap) 5-mm vac. gap for all (7.3-mm mag. gap) In-Vac  same vac. gap (5.3-mm mag. gap) In-Vac  same vac. gap (5.3-mm mag. gap) 5 keV 

SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU vs PMU FEL Performance (LCLS-II HXU) PMU NbTi Nb 3 Sn 140-m undulators 4 GeV e-beam 7.2-mm mag. gaps LCLS-II parameters  Log Scale 77-m undulator

SCU 3-Lab Review Meeting, Dec. 16, Terawatt FEL Peak Power with Taper (4 keV) 8 keV 4 keV 1.5 m choose segment length ~1.5 m FEL Peak Power (TW) Und. Magnet Segment Length (m) NbTi Nb 3 Sn FEL Peak Power (TW) Self-seeding monochromator Start of undulator Claudio Emma, Claudio Pellegrini, UCLA HXU driven by copper linac

SCU 3-Lab Review Meeting, Dec. 16, 2014 “SCU1” at APS – Not starting from scratch precision winding cross-section measured phase error is 4 deg rms 1.1-m magnet “SCU1” in APS SCU facility B = 0.97 T (450 A) u = 18 mm, g m = 9.5 mm

SCU 3-Lab Review Meeting, Dec. 16, 2014 Cryostat Layout Essentials 70 cm 15 cm 1.5 m phase shifters (3) BPM focusingquad alignmentquadundulator segments (3) x & y position control control 5.5 m beamdirection Three 1.5-m long undulator segments in one 5.5-m cryostat Each independently powered to allow TW-taper Short segments easier to measure and tune (same as R&D) Beam-based alignment as final correction using movers (as LCLS)

SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A (J. Fuerst, ANL, 15+5) Conceptual Cryostat Design: Option-B (M. Leitner, LBNL, 15+5) SCU Development Schedule (S. Prestemon, LBNL, 15+5) Cost Estimate (M. White, ANL, 15+5) Executive Session (30 min)

SCU 3-Lab Review Meeting, Dec. 16, 2014 END

SCU 3-Lab Review Meeting, Dec. 16, 2014 Final Summary SCU pushes performance and is a good fit for LCLS-II. SCU cost and construction time are not so dissimilar to conventional undulators. Challenges can be met with well-planned, funded R&D. Present state of technical readiness: Demonstrated operation of NbTi-SCU in a storage ring (ANL); Experience building Nb 3 Sn magnets (LBNL); Experience building and operating long cryomodules, large cryoplants, and long undulators. It’s time to make this game-changing technology available A highly capable, multi-lab collaboration is assembled and ready to launch…

SCU 3-Lab Review Meeting, Dec. 16, 2014 Next SCU Steps? 1. Confirm support from all 3 laboratories (ANL, LBNL, SLAC). 2. Set a date to visit DoE (Jan. or Feb.?) and make our case to pursue at least this first stage (2017 Critical Decision). 3. Request funding of 4.8M$/yr over 2.5 yrs (12M$), starting in FY15, to build and test a full 5.5-m-long cryostat system and take us to the 2017 Critical Decision point.  14 Upgrade to 5 GeV with 140-m PMU allows 6.8 keV… but same upgrade with SCU provides ~10 keV

SCU 3-Lab Review Meeting, Dec. 16, 2014 END

SCU 3-Lab Review Meeting, Dec. 16, 2014 Can we get SCU performance using Electron Energy? very expensive and self-seeding range not as broad 4 GeV PMU 4 GeV NbTi 4 GeV Nb 3 Sn 6.0 GeV PMU 5.3 GeV PMU 4.0 GeV  35 CM’s 5.3 GeV  47 CM’s, 12  5M$ = 60M$ (& add new Cryo Plant) 6.0 GeV  52 CM’s, 17  5M$ = 85M$ (& add new Cryo Plant) Assumes energy is set before undulator period selected (1.5 keV lower limit) Nb 3 Sn and 5 GeV provide > 10 keV !