L1Calo L1 Coordination Meeting March 24th, 2015 Rainer Stamen.

Slides:



Advertisements
Similar presentations
Project Management. Main Phases of Project Development.
Advertisements

Conducting meetings. Why have meetings Clear and clarify confusion Deliver new information – policy issues / plans Discuss complaints from staff Interaction.
JFEX Uli Schäfer 1 Uli Intro / overview / issues Draft, will change !!!! Some questions flagged.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Gu & Maher University of Sydney, October 2004 DECO2005 Monitoring Team Process.
Jet algorithm/FPGA and tests by Attila Hidvégi. Content Status of the jet algorithm Status of the jet-FPGA Different kind of tests FIO-scanning Summary.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Fundamentals of Information Systems, Second Edition
Update and Version Management1 Klaus Bothe 3rd Workshop Software Engineering Education and Reverse Engineering, Ohrid, Macedonia, 2003 Institute of Informatics,
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
Management Committee Summary Effort at CERN Operational Tasks Cost Sharing and New Expenses ZDC Collaboration Management roles Papers, Conferences and.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Evaluating and Purchasing Electronic Resources- The University of Pittsburgh Experience Sarah Aerni Special Projects Librarian University of Pittsburgh.
FEX Uli Schäfer, Mainz 1 L1Calo For more eFEX details see indico.cern.ch/getFile.py/access?contribId=73&sessionId=51&resId=0&materialId=slides&confId=
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
User Group Priorities for Development. Assumptions ER system still remains in place –Capture individual user input –Repository of good ideas that will.
Uli Intro / overview / issues
Web Demo More Money. Less Hassle. Copyright FishermensNetwork.com 2 Contents & Overview  More Money. Less Hassle. See how easy and quick it is.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Continuous Improvement Story Cover Page The cover page is the title page Rapid Process Improvement Story Template O Graphics are optional This CI Story.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
L1Topo-phase0 Uli Schäfer 1. Topo GOLD successfully used to explore technologies and initially verify 6.4Gb/s link integrity over moderate length electrical.
242/102/49 0/51/59 181/172/166 Primary colors 248/152/29 PMS 172 PMS 137 PMS 546 PMS /206/ /227/ /129/123 Secondary colors 114/181/204.
JFEX baseline Uli Schäfer 1 Uli. Intro: L1Calo Phase-1 System / Jets Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
S. Rave, U. Schäfer For L1Calo Mainz
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
Maine Department of Education Informational Letters on Learning Results Implementation Issues May 12, 2004.
Managing programs that promote personal effectiveness.
L1Calo Status Report 15 October 2015Ian Brawn, on behalf of L1Calo1.
G063 – Prototyping. Learning Objective: At the end of this topic you should be able to: describe prototyping as a software development methodology.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
1 Circuitscape Capstone Presentation Team Circuitscape Katie Rankin Mike Schulte Carl Reniker Sean Collins.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Alessandra CiocioCSAC meeting - January 11, MRC Report Status Schedule.
Latency / Tilecal o/e converters VME extender Uli Schäfer 1.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
L1 Technical Proposal: Phase 2 ● Slow progress on writing TP phase 2 – Distractions with beam and calibration – Also some things are still unclear ● Hence.
Plans for the next DAQ release
L1Calo Requirements on the DPS
Weiming Qian On behalf of the ATLAS Collaboration
L1Calo upgrade discussion
Standards Education Committee Update
ATLAS L1Calo Phase2 Upgrade
Online Software Status
Run-2  Phase-1  Phase-2 Uli / Mainz
Standards and Assessment
Management Meeting Operations
Initial Presentation Group 4
2) Identify Requirements 1) Define the Problem 3) Gather Information
Gas Regional Initiative Update on progress and latest developments
ESB Networks Market Release Meeting of the IGG, April 16th 2009
LAMAS Working Group December 2013
Curriculum For Wales Creating the Climate for Change
DSC ChMC CSS update 11th December 2018
Release 3 Update 13th February 2019.
Problem solving.
Technical Communication
LAMAS Working Group October 2018
LAMAS Working Group June 2018
eDAMIS – Statistics of usage
TTC setup at MSU 6U VME-64 TTC Crate: TTC clock signal is
Presentation transcript:

L1Calo L1 Coordination Meeting March 24th, 2015 Rainer Stamen

L1Calo Phase-1 System

Status of PDRs Done – FOX – – eFEX – – jFEX – gFEX – – HUB – – ROD – – FTM – (L1Calo internal) To be Done – Backplane usage specification – TREX Proposed date: Week of May 26th-29th Supposed to be end of april, availabilty of people difficult until mid may, week before is TDAQ week, – L1Topo (Changes to Phase-0 L1Topo) Potentially small modifications, need first to learn shortcomings of L1Topo during run-2 All successfull

Incoming Reviews TREX – Preparation well advanced – Currently evaluating which requirements to implement and how to implement them – Attractive option identified: usage of FELIX, early retirement of L1Calo RODS – Recosting ongoing (driven by FPGA (driven by requirements)) – Prototype: probably big solution; implement everything (expensive) – Production: implement what is needed (not so expensive) Backplane usage specification – Preparation well advanced

Actions from Reviews About 150 actions – 12 ATLAS – 57 L1Calo – 79 Module 1/3 solved by end of last year (Need to update these numbers) Many actions progress as we get deeper into the design We should go through the open items and probably call for a special meeting (Weekly meeting too much packed to discuss details)

Meetings with calorimeters Meetings with calorimeters went quiet We met with the LAr Phase-1 coordinators – Agreed that we need to revive meetings – Areed to outline agenda for a few weeks in advance – Agreed to organise a meeting (half day) on engineering level Topics which need urgent progress – Mapping – Data content – Simulation –... Next big dead line: link speed test (end of this year) – Need to agree on date