PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.

Slides:



Advertisements
Similar presentations
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
Advertisements

An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
P.Vincent LPNHE-Paris for H.E.S.S. collaboraton28 th ICRC - Tsukuba - Japan - 5, August 2003 Performance of the H.E.S.S. cameras Pascal Vincent (LPNHE.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
PWO/APD/CSP Development at Hiroshima U. Hiroshima ALICE-PHOS Group (T.Sugitate, K.Shigaki, et al.) 17 August, 2004, at CERN.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Применение MAPD (Zecotek) в адронных калориметрах и многоканальных времяпролетных системах в экспериментах по релятивистской ядерной физике Ф.Ф.Губер,
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
A.Olchevski, JINR (Dubna) Test Beam studiesof COMPASS ECAL0 Test Beam studies of COMPASS ECAL0 module prototype with MAPD readout ECAL0 Team, JINR, DUBNA.
FEE Electronics progress PCB layout 18th March 2009.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
PADME Front-End Electronics
JRA3 Institute of Physics ASCR Prague
Phase Feed-Forward Piotr Skowroński (CERN)
The PSD at Pb-Pb run PSD drawbacks at Ar beam
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Mini-drawers, FE-ASIC , Integrator
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
F.Guber, A.Ivashkin INR, Moscow
Front-end electronic system for large area photomultipliers readout
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Status of the Crystal Ball
BESIII EMC electronics
Presentation transcript:

PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system - Concept of the PSD analog part upgrade - PSD upgrade schedule F.Guber (INR, Moscow) 1 NA61/SHINE Collaboration meeting, Belgrade, May 27-31, 2013

Why the PSD upgrade is necessary? 1. The temperature stabilization and temperature control system of MAPDs is not working properly. 2. Existing HV control system sets the MAPD voltages but does not readout HV. During the PSD operation there is no information about real HV at MAPDs. 3. There is no monitoring system for the MAPD gains. 4. The PSD trigger signal is rather slow problem with the time-amplitude walk and signal delay in trigger box. 5. Electronics noises are rather small but comparable with MIPs signal. It makes problem with muon calibration. Quite desirable to reduce the noise. Upgrade of all items, excluding 4 and 5, doesn’t depend on the choice of PSD readout - DRS4, …., and can be done even if the old PSD readout electronics would be used in 2014 run 2

Different scenarios for PSD upgrade a)The PSD (as well as TOF) readout is completely new (DRS4): The PSD upgrade in this case: - temperature stabilization, - MAPD temperature control, - MAPD gain monitoring, - new HV control system, - new amplifiers and trigger can b) The PSD readout is old: The PSD upgrade in this case: - temperature stabilization, - MAPD temperature control, - MAPD gain monitoring, - new HV control system. Trigger signal and readout part can not be upgraded ! 3

Energy in PSD, E beam =30AGeV – – Temperature Temperature dependence of 7 Be peak position Position of Be peak for for small (left) and 2 large modules (middle and right) using muon calibration parameters. 4 New method of the PSD calibration has been developed by selecting single spectator energy cluster from interaction trigger (see M.Golubeva presentation) Energy in PSD, E beam =13AGeV

60 layers Al plate HV distributor PCB board End cover Plastic tube Lead-scinti, WLS-fibers with 11 optcal 11 SiMs board with with electronics with air inlet f rom air ~120 cm connectors T sensor (Power mWt) distributor box 100 – 160 mm Could be ajust in this range Temperature in this area should be 25 ◦ ±1 ◦ New structure of the PSD electronics and temperature control system Heater (t~25 ○ ) Air distributor box Pumped air Valve on each module air tube T sensor 5 MAPDs gain monitoring system CERN cooling team Olivier Crespo-Lopez et al.

Originally developed for COMPAS ECAL modules with 9 MAPDs/module Can be easy adopted to 10 MAPDs/PSD module. Permanent check of correct HV values within given HV gate! Compact design. Extremely low power consumption. HV stability – 0.01%. One external power supply ~12 V. Slow control exists! Already tested for a few years! Production by HV systems, Dubna New HV distribution system There is feedback to HV values! 6

New Slow control system. Originally developed for COMPAS ECAL Can control up to 127 devices (modules). Can control the gain monitoring system too (next slide). Connection with external computer: USB-2.0 or RS-232. Internal bus: RS485 Maximum length of bus cables: 50 m Controller for SC 7

MAPDs gain monitoring system Stabilized light pulses of LED is provided by PIN-diode inside with very low temperature dependence. Controlled by SC (the same as HV) Control of MAPD gain at ~1% level 1 device in one module. Gain monitoring system is based on 8

The PSD trigger signal 60 ns 300 ns MAPD signal M~5x10 4 integrated signal M~10 7 ADC signal At present: the PSD trigger signal comes after integrators with rise time ~60 ns: rather slow and large time-amplitude walk. Needs careful adjustment for each beam energy and each beam ion. Plans: trigger signal after MAPD amplifier – fast signal, no problem with time walk and delay. To have fast trigger new amplifiers and new adders are needed. This action requires the replacement of present FEE by new readout electronics – DRS4, TRB3,…. 9

New fast amplifiers. New development is needed. The technical parameters are fixed for a while: Gain~ Bandwidth ~20 MHz Dynamical range 1 mV-2.5V One analog adder in each module for PSD trigger. Needs additional inputs: connectors, types of cables… (depends on used readout system –DRS4, TRB3?? Technical details will be agreed at first half of June. 10

11 The PSD during Be runs The PSD after April 2013 Start of the PSD electronics upgrade

The PSD electronics upgrade schedule: April (CERN) Dismount of existing PSD electronics and MAPDs, preparations to MAPDs mounting on the same plate in each module - done - May-June (Moscow) Preparation the technical task for production of the PSD FEE, HV and SC systems - in progress -July – September (Moscow) Production of FEE prototype and test at test-bench. -October-November Assembling and test of new electronics for one module at CERN -November – February 2014 Mass production of new PSD electronics. -March – April 2014 Installation and test of the PSD electronics and temperature control system at NA61. 12

Thank You 13