1 BESIII PROJECT Zhen ’ An LIU Inst. Of High Energy Physics Representing BEPCII/BESIII Team QWG Meeting Oct. 12-15, 2004 IHEP, Beijing.

Slides:



Advertisements
Similar presentations
1 Overview of BESII/BESIII/BEPC I Current Status II Recent Results III Future Plans IV Summary Zhengguo ZHAO Dept. of Phys., UM, USA (and IHEP of CAS,
Advertisements

FPCP 2002, 05/16-18/2002 p. 1 Richard E. Hughes, The Ohio State UniversityCDF Run II Status Status of CDF and Prospects Flavor Physics and CP Violation.
Status of BESIII Representing BES collaboration Weiguo Li IHEP, CAS ICHEP04 Beijing, Aug. 18, 2004.
1 Measurement of f D + via D +   + Sheldon Stone, Syracuse University  D o D o, D o  K -  + K-K- K+K+ ++  K-K- K+K+ “I charm you, by my once-commended.
Performance Study of BESIII Trigger System Z.-A. Liu, D. Zhao, D. Jin, H. Xu, S. Wei, W. Gong, K. Wang, Q. Wang, N. Berge, K. Zhu, IHEP Q. An, USTC May.
Description of BTeV detector Jianchun Wang Syracuse University Representing The BTeV Collaboration DPF 2000 Aug , 2000 Columbus, Ohio.
The CMS Muon Detector Thomas Hebbeker Aachen July 2001 Searching for New Physics with High Energy Muons.
Measurement of B (D + →μ + ν μ ) and the Pseudoscalar Decay Constant f D at CLEO István Dankó Rensselaer Polytechnic Institute representing the CLEO Collaboration.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
BESIII Electronics and On-Line BESIII Workshop in Beijing IHEP Zhao Jing-wei Sheng Hua-yi He Kang-ling October 13, 2001 Brief Measurement Tasks Technical.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Status of MC Simulation Huaimin Liu BESIII Collaboration meeting IHEP, Beijing, Jan. 12, 2006.
Reach of future  -charm efforts at BESIII Yangheng Zheng Graduate University of Chinese Academy of Sciences NTU May 5 - 9, 2008.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
1. introduction 2. goal of luminosity monitor 3. Structure of BESII Luminosity detector 4. Calculation of the luminosity 5. MC of luminosity detector 6.
More design Works More simulation to study the physics reaches with BESIII. magnet? solid angle coverage ? Identify several important physics topics, and.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Overview of BES physics Yifang Wang Institute of High Energy Physics.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
BESIII Workshop Summary Summary Fred Harris With help from many speakers IHEP, Beijing, Oct. 15, 2001.
1. General Consideration 2. Choice of Crystal 3. Structure of EMC 4. Quality control of CsI(Tl) crystals 5. CsI(Tl) counter 6. Readout 7. Counter testing.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
The CLEO-c Detector Steve Gray Cornell University BESIII Workshop January 13, 2004.
BESIII Detector Simulation with Geant4 Huaimin Liu, Guofu Cao IHEP, Beijing 12 th Geant4 Collaboration Workshop Hebden Bridge (UK), September, 2007.
The BEPCII Project Hesheng Chen Institute of High Energy Physics Chinese Academy of Sciences Outline 1.BEPC/BES and physics results 2.BEPCII 3.BESIII 4.Budget.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Tau – Charm Summary Frederick A. Harris June. 16, 2006 Workshop on US/PRC Cooperation in HEP.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
1 Welcome to Welcome to ILC GDE Meeting & 9th ACFA ILC Physics and Detector Workshop 9th ACFA ILC Physics and Detector Workshop.
Luca Spogli Università Roma Tre & INFN Roma Tre
Status of BESIII Event Reconstruction System Zepu Mao IHEP BESIII Annual Meeting 2005/05/29.
Charm Physics Potential at BESIII Kanglin He Jan. 2004, Beijing
Particle Identification at BESIII Kanglin He April 23, 2007, Amsterdam.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
Trigger and DAQ System Zhao Jing Wei Sept. 2002, BESIII review, Beijing Outline Trigger system Event rate estimation Principle of design Scheme Monte Carlo.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 BEPCII/BESIII Frederick A. Harris University of Hawaii QWG Meeting Sept , 2003 Fermilab Representing:
First CMS Results with LHC Beam
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
Trigger System LIU Zhen’an Inst. of High Energy Physics, Beijing Sep
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
First results from SND at VEPP-2000 S. Serednyakov On behalf of SND group VIII International Workshop on e + e - Collisions from Phi to Psi, PHIPSI11,
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
BESIII offline software group Status of BESIII Event Reconstruction System.
High Intensity Electron Positron Accelerator Facility (HEPAF) Zhengguo Zhao Collaborative Innovation Center for Particle Physics and Interaction University.
BESIII status and preliminary results Xiaoyan SHEN (Representing BES Collaboration) Institute of High Energy Physics, Beijing XLVIII International Winter.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Trigger System of BES III LIU Zhen’an Inst. of High Energy Physics, Beijing June
Status of BESIII and upgrade of BESIII
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Future Hardware Development for discussion with JLU Giessen
Frederick A. Harris University of Hawaii For the BES Collaboration
CMS muon detectors and muon system performance
BESIII Collaboration Meeting Summary
BESIII EMC electronics
Performance of MDC during New Data Taking
On behalf of MDC electronics group
Design of Interaction Region
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
Electronics and DAQ Summary
N* Production from J/ decays at BES
for BESIII MDC electronics Huayi Sheng
Presentation transcript:

1 BESIII PROJECT Zhen ’ An LIU Inst. Of High Energy Physics Representing BEPCII/BESIII Team QWG Meeting Oct , 2004 IHEP, Beijing

2 The Beijing Electron Positron Collider Linac,Transportation Line, Storage Ring,BES,BSRF L ~ ~5  /cm 2  s at J/  peak E cm ~2-5 GeV Construction: A unique e + e - machine in the  -charm energy region since 1989.

3 BESII Detector ( upgrade ) VC:  xy = 100  m TOF:  T = 180 ps  counter:  r  = 3 cm MDC:  xy = 200  m BSC:  E/  E= 22 %  z = 5.5 cm  dE/dx = 8.4 %   = 7.9 mr B field: 0.4 T  p/p=1.8  (1+p 2 )  z = 2.3 cm Dead time/event: 10 ms

4 BES BES Main Physics Results Data Taken: 66M J/  events, 18M  events, 33 pb -1  (3770)events, 5 pb -1  data, 22 pb - 1 Ds data  Precise Mass Measurement of  lepton.  2-5 GeV R measurement.  Systematic study of  (2S) decays.  Systematic study of J/  decays.  Obtain f Ds from Ds pure leptonic decay.  Measure Br(D S   ) in model independent way.  BES has 116 entries in PDG.

5 The need for upgrade Interesting physics limited by statistics: glueball/hybrid searches, CKM matrix elements, DDbar mixing,  puzzle, non-pQCD … Large systematic error due to limited resolution Detector is aging Multi-bunch mode & High event rate On Feb. 10, 2003, the Chinese government, the state council, approved officially the BEPCII/BESIII upgrade project

6 BEPCII: High Lumi. Large Angle Double – ring Collider Build new ring inside existing tunnel. Two half new rings and two half old rings cross at two IR’s, forming a double ring collider. 500MHz SC cavity

7 Double ring installation – Wood model No spacing problems No spacing problems

8 BEPCII Design goal

9 Passed SLAC review in May BEPCII main parameters Energy E(GeV)1.89Energy spread(10 -4 ) σ e 5.16 Circumference C(m)237.53Emittance ε x /ε y (nm)144/2.2 Harmonic number h396Momentum compact α p RF frequency f rf (MHz)499.8β * x /β * y (m)1/0.015 RF Voltage V rf (MV)1.5Tunes ν x /ν y /ν z 6.57/7.6/0.034 Energy loss/turn U 0 (keV) 121Chromaticities ν ’ x /ν ’ y -11.9/-25.4 Damping time τ x /τ y /τ z (ms) 25/25/12.5Natural bunch length σ z0 (cm)1.3 Total current/beam I(A)0.91 Crossing angle  (mrad) ±11 SR Power P(kW)110Piwinski angle Φ(rad)0.435 Bunch number N b 93Bunch spacing S b (m)2.4 Bunch current I b (mA)9.8 Beam-beam parameter  x /  y 0.04/0.04 Particle number N t 4.5×10 12 Luminosity(10 33 cm -2 s -1 ) L 0 1.0

10 The BESIII Detector small cell, He gas based drift chamber CsI(Tl) crystal calorimeter Superconducti ng magnet of 1T PID system based on TOF RPC muon chamber system

11 Sub-detectorBESIIBES IIICLEOc  XY = 250  m130  m90  m MDC  pt /P t GeV %  dE/dx = 8.5 % 6-7 %6% EMC  E  xy = 1GeV 2.5 % 0.5cm 2.0% 0.3 cm TOF180 ps 90 psRich  counter 3 layers9 layersNo magnet0.4 T 1.0 T The detector of BESIII,BESII and CLEOc

12 Physics at BEPCII/BESIII Precision measurement of CKM matrix Precision test of Standard Model QCD and hadron production Light hadron spectroscopy Charmonium physics Search for new physics

13 Physics to be studied in  -charm region  Search for glueballs, quark-gluon hybrids and exotic states  Charmonium Spectroscopy and decay properties  Precision measurement of R  Tau physics: tau mass, tau-neutrino mass, decay properties, Lorenz structure of charged current, CP violation in tau decays …  Charm physics: including decay properties of D and D s, f D and f Ds; ; charmed baryons.  Light quark spectroscopy, m c  Testing QCD, QCD technologies, CKM parameters  New Physics: rare decays, oscillations, CP violations in c- hadrons  …..

14 Event statistics at BESIII Physics Channel Energy (GeV) Luminosity (10 33 cm –2 s –1 ) Events/year J/  ×10 10  ×10 7  ’ ×10 9 D ×10 7 Ds ×10 6 Ds ×10 6 *CLEO took 10 nb D production cross section while we took 5 nb

15 For more detailed information and description of BESIII physics studies please refer to sep03/WS2talks/future/harris_BESIII.ppt

16 Schedule 5/2004: BESII detector was removed already 11/2004: supporting structure/york installation 3/2005: muon chamber installation 5/2005: magnet installation 10/2005: magnetic field mapping 2/2006: EMC installation 3/2006: MDC/TOF installation 6/2006: Cosmic-ray run 9/2006: BESIII detector in place 12/2006: tuning of detector/machine

17 Parameters and Current Status of BESIII

18 Main drift chamber Inner diameter: 63mm; Outer diameter: 810mm; length: 2400 mm Inner cylinder: 1 mm Carbon fiber, outer cylinder: 10 mm CF with 8 windows End flange: 18 mm thick Al 7075 ( 6 steps) 7000 Signal wires : 25(3% Rhenium)  m gold-plated tungsten Field wires: 110  m gold-plated Aluminum Small cell: inner---6*6 mm2, outer *8.2 mm2, Gas: He + C 3 H 8 (60/40) Momentum resolution 1 GeV/c): dE/dX resolution: 6-7%.

GeV/c π

20 MDC wiring machine

21 MDC electronics Preamp VMEbus Optical transmissio n MQT Clock Trigger Timing Wire Signal dE/dx Q Measurement T Measurement Calibration Amp + Shaper + Timing Readout Control Trigger Fan out  T < 0.5 ns, ns, INL <0.5%  Q < 5fc, fc, INL<2% Design have been finished, several prototypes have been successfully tested

22 EMC: CsI(Tl) crystals 6300 crystals, (5.2x 5.2 – 6.4 x 6.4) x 28cm 3 (15 X 0 ) PD readout, noise ~1100 ENC Energy resolution: Position resolution: Tiled angle: theta ~ 1-3 o, phi ~ 1.5 o Minimum materials between crystals

23 CsI Crystal production : SIC, Hammamatzu, Saint-Gobain

24 no partition wall Mechanical support structure

25 Assembling module of the Al-cells

26 EMC electronics pream p Main amplifier CLK L1 L1Reset Buffer full 10 bit ADC T/Q info. Local Buffer Global Buffer Fan out Trigger CLK L1 CHK Baffer full Test, DAC SCLK , DIN Analog Sum ÷2 ×1 ×16 VMEVME TEST Control On crystal σ Q < 0.16 fc (1000 ENC) 0.5fc ~ 1500fc, 15bit Cross talk: <0.3%, INL<1% Design have been finished, several prototypes have been successfully tested

27 Super-conducting magnet Al stabilized NbTi/Cu conductor from Hitachi 1.0 T, <5% non-uniformity 921 turns, R = m, L=3.52m, cold mass 3.6t Thickness: 1.92 X 0 Inner-winding method

28 SC magnet winding machine Windingmachi ne and dummy coil Suport cylinder Winding machine

29 Particle ID: TOF system 392 pieces BC408, 2.4 m long, 5cm thick Time resolution ps/layer PMT: Hamamatzu R5942 图 桶部光电倍增管的支撑环, 内外两层共 176 个孔。

30 Beam Test : Intrinsic resolution of BC408/EJ200 Barrel : < 90 ps Endcap : < 94 ps

31 TOF electronics Specifications: –Time measurement : <25ps –Charge measurement: 4mv~4V, 10 bit –Fast trigger signal System configuration: –preamplifier Bilinear Gain Stage + Fully Differential Output Stage –Frontend electronics(9U VME Boards) time/Q measurement , HPTDC based, 25 ps –Clock synchronized with the RF cavity 500MHz signal clock signal cable: Phase Stabilized Optical Fiber (PSOF) Design have been finished, several prototypes have been successfully tested

32  system : RPC 9 layers, 2000 m 2 Bakelite, no linseed oil 4cm strips, channels Tens of prototypes (up to 1*0.6 m 2 ) Noise less than 0.2 Hz/cm 2

33 RPC production underway in the clean room

34 μ counter readout RPC PPC Input /output module Readout module System controller VME crate JTAG controller Power supply L1/CLK/Reset/Check… Design have been finished, prototypes have been successfully tested, production ready

35 Trigger system Event rate: Good event rate: ~ 2000 Hz Bhabha evt rate: ~800Hz Cosmic-ray rate: 10:1 Beam bg rate: 10000:1 Total event rate : 4000 Hz Pipeline: –BEPCII in multi-bunch mode (93 ) , bunch spacing: 8ns trigegr latency: 6.4  s , events stored in pipeline buffer No dead time due to trigger Largely use optical fibers, FPGA, …

36 Trigger system : configuration Global Trigger Logic 6.4  s TOF MDC EMC MU DISC Mu track DISC TrigSum Track Finder Etotal Energy Hit/Seg Count Track Seg. Finder DAQ RF TTC TC Sum L1P CLOCK Track Match Energy Balance Cluster Counting Design largely based on FPGA technology have been designed, prototypes underway

37 Block Diagram of DAQ Architecture DAQ system based on VME/PowerPC and PC farm have been designed, mini-version setup, software underway

38 BESIII magnetic yoke and mechanics

39 Beam background: a serious issue Amp All Cu surfaces Total dose near the interaction region ~ 150 MeV/  s < 20 CsI crystals < 20 MDC electronics < 1 TOF OK for safety MDC < 20 KHz/wire TOF 500 KeV EMC 100 KeV Careful MC study has been made.

40 Beam pipe and shielding Be beam pipe: 30 cm long, 63mm in diameter, 2 layers HOM power: 200W, SR: < 24 W 20 mm Gold plating to reduce backgrounds Liquid cooling channel between beam pipeLiquid cooling channel between beam pipe 20 mm Tungsten shielding

41 Other systems Offline computing environment based on a large scale PC farm is under study MC based on GEANT4, first reconstruction framework released, sub-detector reconstruction code underway

42 International collaboration IHEP, Beijing Beijing University, Beijing Tsinghua University, Beijing USTC, Hefei National Central University, Taipei KEK, Tokyo University, Tokyo Hawaii University, Honolulu Washington University, Seattle More collaborators welcomed

43 Summary The BEPCII/BESIII has been approved officially by the Chinese government The BESIII detector design is finished, prototyping is successful, mass production have been started Rich physics after CLEO-c(upgrade of BEPCII to 3*10 33 cm -2 s -1 is possible) Collaborators are welcomed!

44 Thanks

45 Event statistics at BESIII Physics Channel Energy (GeV) Luminosity (10 33 cm –2 s –1 ) Events/year J/  ×10 10  ×10 7  ’ ×10 9 D ×10 7 Ds ×10 6 Ds ×10 6 *CLEO took 10 nb D production cross section while we took 5 nb