1 Toll Modeling Analysis for the SR 520 Bridge Replacement and HOV Project 19 th Annual International EMME/2 Users’ Conference October 19-21, 2005 Presented.

Slides:



Advertisements
Similar presentations
A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani.
Advertisements

THURSTON REGION MULTIMODAL TRAVEL DEMAND FORECASTING MODEL IMPLEMENTATION IN EMME/2 - Presentation at the 15th International EMME/2 Users Group Conference.
Feedback Loops Guy Rousseau Atlanta Regional Commission.
UATS Director’s Workshop Agenda April 30, 2001  Introduction (12:30 – 12:35)  Development Review and Mitigation (12:35 – 2:10) Break (2:10 – 2:15) 
Getting on the MOVES: Using Dynameq and the US EPA MOVES Model to Measure the Air Pollution Emissions TRPC – Smart Corridors Project Chris Breiland Fehr.
Regional Bicycle Demand Model: In Use Today in Portland Bill Stein, Metro TRB Transportation Applications Conference Reno, Nevada – May 9, 2011.
April 10, 2007 Travel Forecasting Methodology for I-95 HOT Lanes in Virginia 13th TRB National Transportation Planning Applications Conference Reno, Nevada.
GIS at PSRC GIS data collection & travel demand modeling ESRM 250 February 4, 2010.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
GREATER NEW YORK A GREENER Travel Demand Modeling for analysis of Congestion Mitigation policies October 24, 2007.
An Approach for Base Transit Trip Matrix Development: Sound Transit EMME/2 Model Experience Sujay Davuluri Parsons Brinckerhoff Inc., Seattle October,
GEOG 111 & 211A Transportation Planning Traffic Assignment.
Junction Modelling in a Strategic Transport Model Wee Liang Lim Henry Le Land Transport Authority, Singapore.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Estimating Congestion Costs Using a Transportation Demand Model of Edmonton, Canada C.R. Blaschuk Institute for Advanced Policy Research University of.
13 th TRB Transportation Planning Applications Conference May 11, 2011 Risk Assessment & Sensitivity Analysis of Traffic and Revenue Projections for Toll.
Use of Truck GPS Data for Travel Model Improvements Talking Freight Seminar April 21, 2010.
Microsimulation for Rural and Exurban Regions: Lake County, California David Gerstle (presenting) & Zheng Wei Caliper Corporation.
May 2009 Evaluation of Time-of- Day Fare Changes for Washington State Ferries Prepared for: TRB Transportation Planning Applications Conference.
Milton-Madison Bi-State Travel Demand Model Rob Bostrom Planning Application Conference Houston, Texas May 19, 2009.
Implementing a Blended Model System to Forecast Transportation and Land Use Changes at Bob Hope Airport 15 th TRB National Transportation Planning Applications.
Versatile Applications of EMME/2 and ENIF: Seattle Experience Madhavi Sanakkayala Heather Purdy & Sujay Davuluri Parsons Brinckerhoff, Seattle.
11 May, 2011 Discrete Choice Models and Behavioral Response to Congestion Pricing Strategies Prepared for: The TRB National Transportation Planning Applications.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco DTA Project: Model Integration Options Greg Erhardt DTA Peer Review Panel Meeting July 25 th,
Traffic Assignment Convergence and its Effects on Selecting Network Improvements By Chris Blaschuk, City of Calgary and JD Hunt, University of Calgary.
BALTIMORE METROPOLITAN COUNCIL MODEL ENHANCEMENTS FOR THE RED LINE PROJECT AMPO TRAVEL MODEL WORK GROUP March 20, 2006.
Considerations when applying Paramics to Strategic Traffic Models Paramics User Group Meeting October 9 th, 2009 Presented Matthew.
June 15, 2010 For the Missoula Metropolitan Planning Organization Travel Modeling
Mississippi River Bridge An Analysis of Alternatives DRAFT Final Report Presentation January 31, 2007.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Vamsee Modugula Cambridge Systematics, Inc. May.
Travel Demand Modeling Experience Bellevue-Kirkland-Redmond Travel Demand Modeling Experience Jin Ren, P.E. City of Bellevue, Washington, USA October 19,
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
1 Potential User Benefits and Costs of Rising Fuel Prices in the Puget Sound Region TRB Planning Applications Conference May 18, 2009 By Maren Outwater.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
MATRIX ADJUSTMENT MACRO (DEMADJ.MAC AND DEMADJT.MAC) APPLICATIONS: SEATTLE EXPERIENCE Murli K. Adury Youssef Dehghani Sujay Davuluri Parsons Brinckerhoff.
Transportation leadership you can trust. presented to TRB 11 th Conference on Transportation Planning Applications presented by Dan Goldfarb, P.E. Cambridge.
Transportation leadership you can trust. presented to 12 th Annual TRB Transportation Planning Application Conference presented by Dan Goldfarb, P.E. Cambridge.
Integrated Travel Demand Model Challenges and Successes Tim Padgett, P.E., Kimley-Horn Scott Thomson, P.E., KYTC Saleem Salameh, Ph.D., P.E., KYOVA IPC.
FDOT Transit Office Modeling Initiatives The Transit Office has undertaken a number of initiatives in collaboration with the Systems Planning Office and.
EMME Users’ Group Meeting Recent toll patronage forecasting using EMME 27 May 2011.
Dowling Associates, Inc. 19 th International EMME/2 Users’ Conference – 21 October 2005 Derivation of Travel Demand Elasticities from a Tour-Based Microsimulation.
Enhancement and Validation of a Managed-Lane Subarea Network Tolling Forecast Model May 19, 2005 Stephen Tuttle (RSG), Jeff Frkonja (Portland Metro), Jack.
Application of an Activity-based Model for a Toll Road Study in Chicago Matt Stratton Parsons Brinckerhoff May 19, 2015.
Bharath Paladugu TRPC Clyde Scott Independent Consultant
1 Fine Tuning Mathematical Models for Toll Applications Dr. A. Mekky, P.Eng., A. Tai, M. Khan Ministry of Transportation, Ontario, Canada.
Comparative Analysis of Traffic and Revenue Risks Associated with Priced Facilities 14 th TRB National Transportation Planning Applications Conference.
SHRPII C04: TEG Meeting, Washington, DC - January 14, 2010 Results today based primarily on three data sources… Seattle 2006 household travel survey (RP)
TRB Planning Applications May 2009, Houston,TX Changing assignment algorithms: the price of better convergence Michael Florian and Shuguang He INRO.
Transportation Forecasting The Four Step Model. Norman W. Garrick Transportation Forecasting What is it? Transportation Forecasting is used to estimate.
Modeling Various Tolling Schemes Using Emme: Seattle Experience Andrew Natzel, Parsons Brinckerhoff Bhanu Yerra, Parsons Brinckerhoff Craig Helmann, Puget.
11 th National Planning Applications Conference Topic: Statewide Modeling Validation Measures and Issues Authors: Dave Powers, Anne Reyner, Tom Williams,
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
A Sketch Planning Assessment of Managed-Lane Options for the I-5 Freeway Corridor Master Plan William R. Loudon, DKS Associates.
The Current State-of-the-Practice in Modeling Road Pricing Bruce D. Spear Federal Highway Administration.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 37) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
Transportation Modeling – Opening the Black Box. Agenda 6:00 - 6:05Welcome by Brant Liebmann 6:05 - 6:10 Introductory Context by Mayor Will Toor and Tracy.
Technical Advisory Committee
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
APPLICATIONS OF STATEWIDE TRAVEL FORECASTING MODEL
Jim Henricksen, MnDOT Steve Ruegg, WSP
Slugging in the I-395 Corridor
Ventura County Traffic Model (VCTM) VCTC Update
Presentation transcript:

1 Toll Modeling Analysis for the SR 520 Bridge Replacement and HOV Project 19 th Annual International EMME/2 Users’ Conference October 19-21, 2005 Presented by: Nicola Longo

2 Authors: Nicola Longo, P.E., PB Sujay Davuluri, PB Anjali Bhagat, PB Madhavi Sanakkayala, PB Michael Horntvedt, Parametrix Acknowledgements: Julie Meredith, P.E., WSDOT Project Manager

3 Presentation Overview Project Background Project Alternatives Modeling Procedures Summary of Findings

4 Project Background History –Bridge opened in 1963 as a tolled facility –Toll removed in 1979 Study Area –Seven mile corridor from I-5 to I-405

5 Goal Improve mobility for people and goods across Lake Washington in a manner that is safe, reliable, and cost effective Project StatusWSDOT is currently preparing a DEIS We'll be in touch, Project Background

6 Traffic Volumes ~ 110,000 daily vehicles trips on an average weekday

7 Project Background Alternative Routes I-90 and SR 522

8 Project Alternatives Using the EMME/2 Puget Sound Regional Council Model the following alternatives were analyzed: 1998 Base Year –SR GP / direction –Model was refined, updated and validated 2030 No Build –SR GP / direction –Included planned improvements only

9 Project Alternatives Lane –SR GP / direction –Non carpool are tolled –Transit and HOV are toll free Lane –SR GP / direction and 1 HOV / direction –Non carpool are tolled –Transit and HOV are toll free Lane –SR GP / direction and 1 HOV / direction –Non carpool are tolled –Transit and HOV are toll free –Additional capacity on I-5

10 Modeling Procedures Base Model –Existing 4-step PSRC model –VDFs and GC assignment procedure from the new PSRC model –Performed mini-validation analysis for study corridor

11 Mini Validation Updated network attributes: –Coding Refinement (capacity, FFS, number of lanes, turning movements, etc) –Transit Service Level Transit and auto vehicle volumes within 10% of actual volumes for cross-lake Comparison of Daily Vehicle Volumes Modeling Procedures

12 General Procedure Two-step process: Established trip distribution using a full model run without tolls Used resulting trip distribution to perform mode choice and assignments inclusive of tolls and feedback Modeling Procedures

13 Different WSDOT study provided key inputs Value of Time (VOT) in 1990 dollars –Used survey data –Performed statistical mode choice estimate analysis Toll Rates in 1990 dollars –Special modeling analysis performed to establish toll rates Modeling Procedures

14 Modeling Procedures

15 Generalized Cost Assignment Toll Rates –Peaks = 250 cents –Off Peak = 135 cents VOT –Peak factor = (1/10.8) x 60/100 = min/cents –Off-peak factor = (1/9.1) x 60/100 = min/cents Modeling Procedures

16 Production of “Pure” Travel Times GC based times include toll time costs Used GC based link volumes to calculate “pure” travel times Modeling Procedures

17 Mode Choice Model Inputs “Pure” travel time: –3+ HOVs –Transit “Pure” travel time + Toll Time Cost: –Non-HOVs using GP lanes Modeling Procedures

18 Systemwide mode share PM peak and daily cross-lake screenline Detailed traffic data for micro simulation analysis Model Results

19 Special studies required for estimates of VOT and toll rates New VDFs and GC procedures were useful for more accurate forecasts Results assisted to evaluate alternatives effectively Conclusions