CTSS Rollout update Mike Showerman JP Navarro April 6 2006.

Slides:



Advertisements
Similar presentations
TeraGrid Community Software Areas (CSA) JP (John-Paul) Navarro TeraGrid Grid Infrastructure Group Software Integration University of Chicago and Argonne.
Advertisements

SAN DIEGO SUPERCOMPUTER CENTER Inca 2.0 Shava Smallen Grid Development Group San Diego Supercomputer Center June 26, 2006.
Test harness and reporting framework Shava Smallen San Diego Supercomputer Center Grid Performance Workshop 6/22/05.
02/07/03 Grid Support Centre 1 UK Grid Support Centre Alistair Mills CLRC e-Science Centre
Cross-site data transfer on TeraGrid using GridFTP TeraGrid06 Institute User Introduction to TeraGrid June 12 th by Krishna Muriki
Chubaka Producciones Presenta :.
Globus Toolkit 4 hands-on Gergely Sipos, Gábor Kecskeméti MTA SZTAKI
The Globus Toolkit Gary Jackson. Introduction The Globus Toolkit is a product of the Globus Alliance ( It is middleware for developing.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
TeraGrid Science Gateway AAAA Model: Implementation and Lessons Learned Jim Basney NCSA University of Illinois Von Welch Independent.
Simo Niskala Teemu Pasanen
1 Globus Developments Malcolm Atkinson for OMII SC 18 th January 2005.
Kate Keahey Argonne National Laboratory University of Chicago Globus Toolkit® 4: from common Grid protocols to virtualization.
Attribute-based Authentication for Gateways Jim Basney Terry Fleury Stuart Martin JP Navarro Tom Scavo Jon Siwek Von Welch Nancy Wilkins-Diehr.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
GIG Software Integration: Area Overview TeraGrid Annual Project Review April, 2008.
TeraGrid Information Services December 1, 2006 JP Navarro GIG Software Integration.
GIG Software Integration Project Plan, PY4-PY5 Lee Liming Mary McIlvain John-Paul Navarro.
Open Science Grid Software Stack, Virtual Data Toolkit and Interoperability Activities D. Olson, LBNL for the OSG International.
1 Todd Tannenbaum Department of Computer Sciences University of Wisconsin-Madison
TeraGrid Information Services John-Paul “JP” Navarro TeraGrid Grid Infrastructure Group “GIG” Area Co-Director for Software Integration and Information.
TeraGrid Information Services JP Navarro, Lee Liming University of Chicago TeraGrid Architecture Meeting September 20, 2007.
GRAM: Software Provider Forum Stuart Martin Computational Institute, University of Chicago & Argonne National Lab TeraGrid 2007 Madison, WI.
Long Term Ecological Research Network Information System LTER Grid Pilot Study LTER Information Manager’s Meeting Montreal, Canada 4-7 August 2005 Mark.
CTSS 4 Strategy and Status. General Character of CTSSv4 To meet project milestones, CTSS changes must accelerate in the coming years. Process –Process.
OSG Services at Tier2 Centers Rob Gardner University of Chicago WLCG Tier2 Workshop CERN June 12-14, 2006.
OSG Middleware Roadmap Rob Gardner University of Chicago OSG / EGEE Operations Workshop CERN June 19-20, 2006.
Grid Resource Allocation and Management (GRAM) Execution management Execution management –Deployment, scheduling and monitoring Community Scheduler Framework.
GRAM5 - A sustainable, scalable, reliable GRAM service Stuart Martin - UC/ANL.
TeraGrid CTSS Plans and Status Dane Skow for Lee Liming and JP Navarro OSG Consortium Meeting 22 August, 2006.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
SAN DIEGO SUPERCOMPUTER CENTER Inca TeraGrid Status Kate Ericson November 2, 2006.
GRIDS Center Middleware Overview Sandra Redman Information Technology and Systems Center and Information Technology Research Center National Space Science.
National Center for Supercomputing ApplicationsNational Computational Science Grid Packaging Technology Technical Talk University of Wisconsin Condor/GPT.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
Grid Monitoring and Information Services: Globus Toolkit MDS4 & TeraGrid Inca Jennifer M. Schopf Argonne National Lab UK National eScience Center (NeSC)
Testing Grid Software on the Grid Steven Newhouse Deputy Director.
J.P. Wellisch, CERN/EP/SFT SCRAM Information on SCRAM J.P. Wellisch, C. Williams, S. Ashby.
Alain Roy Computer Sciences Department University of Wisconsin-Madison Condor & Middleware: NMI & VDT.
Enabling Grids for E-sciencE Software installation and setup Viet Tran Institute of Informatics Slovakia.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
2005 GRIDS Community Workshop1 Learning From Cyberinfrastructure Initiatives Grid Research Integration Development & Support
Data, Visualization and Scheduling (DVS) TeraGrid Annual Meeting, April 2008 Kelly Gaither, GIG Area Director DVS.
Feb 2-4, 2004LNCC Workshop on Computational Grids & Apps Middleware for Production Grids Jim Basney Senior Research Scientist Grid and Security Technologies.
The National Grants Partnership March 11, 2008 Michael Pellegrino
TeraGrid Overview John-Paul “JP” Navarro TeraGrid Area Co-Director for Software Integration University of Chicago/Argonne National Laboratory March 25,
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
Attribute-based Authentication for Gateways Jim Basney Terry Fleury Stuart Martin JP Navarro Tom Scavo Nancy Wilkins-Diehr.
Quality Assurance (QA) Working Group Update July 1, 2010 Kate Ericson (SDSC) Shava Smallen (SDSC)
CTSSv3 Cutover Checklist Draft 3 JP Navarro, Lee Liming May 25, 2006.
Software Integration Highlights CY2008 Lee Liming, JP Navarro GIG Area Directors for Software Integration University of Chicago, Argonne National Laboratory.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Tier 3 Support and the OSG US ATLAS Tier2/Tier3 Workshop at UChicago August 20, 2009 Marco Mambelli –
Andrew McNab - Globus Distribution for Testbed 1 Status of the Globus Distribution for Testbed 1 Andrew McNab, University of Manchester
GRIDS Center John McGee, USC/ISI April 10, 2003 Internet2 – Spring Member Meeting Arlington, VA NSF Middleware Initiative.
Current Globus Developments Jennifer Schopf, ANL.
OSG Status and Rob Gardner University of Chicago US ATLAS Tier2 Meeting Harvard University, August 17-18, 2006.
TeraGrid Capability Discovery John-Paul “JP” Navarro TeraGrid Area Co-Director for Software Integration University of Chicago/Argonne National Laboratory.
Congreso Cuidad, Spain May 15, 2007 GridWay 1/28, Installation and Basic Configuration GridWay Distributed Systems Architecture Group Universidad Complutense.
OSG Facility Miron Livny OSG Facility Coordinator and PI University of Wisconsin-Madison Open Science Grid Scientific Advisory Group Meeting June 12th.
TeraGrid Software Integration: Area Overview (detailed in 2007 Annual Report Section 3) Lee Liming, JP Navarro TeraGrid Annual Project Review April, 2008.
New Features in Dyninst 6.1 and 6.2
Xoserve IX Refresh Customer Update 03/01/2019.
WordPress Unit Web Coordinators
OGCE Portal Software for Big Red and the TeraGrid
2015 January February March April May June July August September
Presentation transcript:

CTSS Rollout update Mike Showerman JP Navarro April

CTSS V3 Software SoftwareRequiredPackagedDeployed GT4.0.1Yes MPICH-G2No GsisshYes MyProxy (clientsYes Kx.509YesNoMostly Gx-mapNot yetNoMostly

CTSS V3 Software SoftwareRequiredPackagedDeployed HDF4 4.2r0YesIn testingsome HDF yesIn testingsome PHDF YesNosome SRB (client) YesIn processNo HSIYesNoMostly UberFTPYes TGCP 1.0.0YesIn testingNo (update)

CTSS V3 Software SoftwareRequiredPackagedDeployed MPIYesNoyes Blas libsYesNoyes pythonYesNoyes TCLYesNoyes Softenv 1.4.2YesNoyes TG-policyYesNoyes TGusage 2.1Yesyes IncaYesNoyes

CTSS V3 software Coordinated software amongst DTF resources –Intel compilers update to 8.1 –Common MPICH-GM –Common BLAS libs –Binary compatible goal

CTSS V3 Services ServiceRequiredPackagedDeployedReliable SshYesFor someYes GridftpyesYesyesYes WS-GRAMyes mostlyNo preWS-GRAMyes mostly? MDSyes mostly? RLSNoyesIn a few? RFTyesYes ? Condor-gYesNo NA

CTSS V3 environment Variables –GLOBUS_LOCATION –HDF4_HOME –HDF5_HOME –MYPROXY_SERVER –SRB_HOME –TG_APPS_PREFIX –TG_CLUSTER_GPFS –TG_CLUSTER_HOME –TG_CLUSTER_PFS –TG_CLUSTER_PVFS –TG_CLUSTER_SCRATCH –TG_COMMUNITY –TG_EXAMPLES –TG_NODE_SCRATCH Softenv keys

Rollout strategy Plan involved 3 phase rollout –Client software –Initial service deployment Find problems in configuration/deployment –Final software release

Timelines Initial timeline –November 11: Gig packaging complete initial Globus Package GT4 Client software deployed by SC05 –~50% completion –December 1: Software ready for deployment –December 13: Final packages installed and ready for testing –Software completion by Jan 1 Target missed

Timeline 2 November 11: Gig packaging complete initial Globus Package December 13: gig packaging team GT r2 package complete and available for deployment December 22: RP sites complete deployment of GT4.0.2-r2 package and begin service configuration January 17: Deadline established to start GT r2 services January 31: RP sites completed the deployment of the GT4.0.1-R2 services February 13: Gig packaging team begin build and test GT4.0.1-r3 packages along with v2 updated software February 20: Gig Packaging team deliver GT r3 package along with updated components to CTSS v2 for deployment at RP sites March 6: TeraGrid CTSS v3 software and services available to TeraGrid user support and Gateways communities for testing/validation March 19: TeraGrid CTSS v3 software stack and services available to TeraGrid users for testing/validation April 1 (really the 3rd): CTSS V3 production stack in place NCSA adds 2 resources to TeraGrid production

Where We are Time for a new timeline Need to hit our deadlines Need to define what constitutes “ready” –For testing –For switching to the default environment I think it would be a mistake not to be solidly on the new stack before TeraGrid 06

Platforms New Platforms –PPC: AIX 5.3 –IA-32: RH 9 –IA-64: SGI ProPack 3.4/RHEL3 –PPC: SLES9 BG/L –AMD64: SUSE9 Cray XT3 –Others coming Existing Platforms –PPC: AIX 5.2 –IA-32: Debian Sarge, RHEL3, RHEL4, SLES8, SUSE9.1 –IA-64: SLES8 –Sparc: Solaris 9 –Alpha: Tru64 18 different machines 13 platforms, more than NMI supports

Deployment as of April 3 Software –Pacman –Intel Intel 8.1 and above on most Linux platforms (was 8.0) –mpich-gm b (where applicable) –TG Usage 2.1 –Condor –TGCP (pre-production) –Globus (-r3) Striped GridFTP (all sites) Pre-WS GRAM (all sites) WS GRAM, RFT, MDS4 (most sites) RLS (some sites) Full Client Toolkit (all sites)

Punch List as of 4/6/2006 Globus –Static globus-url-copy for tgcp –Updated PBS JobManager –MDS4 configuration instructions –MPI flavored Globus libraries Other –Condor-G (installation documentation) –tgcp (installation testing) –Hdf4, hdf5, phdf5 (packaging and installation testing) –SRB client, GridFTP with SRB DSI support –Mpich-G2 –TG Resource ID –Debugging Globus vendor and mpi flavor build issues on some platforms –Debugging Globus service issues on some platforms

New Timeline April 6 –Gig Pack team completes remaining GT4 additions April 14 –Gig Pack team completes remaining items to be packages April 21 –RP sites complete the installation of remaining packages –Initial Documentation complete April 24. –Internal testing begins on all resources: Testing of user apps with libraries/compilers Verification of upgraded services (gram jobs representing user workload), gridftp Validation that new services meet the requested needs –Specifically web services May 5 –Documentation updates complete May 8 –User Testing begins June 1 –Default software stack switch –Services on default ports July 1 –Removal of old services and non-default v2 software