ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
CSWG Update Blake Holt ERCOT CSWG 02/23/ CRR Balancing Account $2,179, CRRBACRTOT $67,789.11CRRFEETOT DACRRSAMTTOT $500, $1,747,349.16CRRBAF.
ERCOT Billing, Settlement Disputes & Data Extracts
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
1 Nodal Stabilization Market Call December 28, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Settlement Stability 2015 Q1 Update to COPS Mandy Bauld ERCOT COPS 04/15/2015.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
12/6/2015 ERCOT Production Issues Update ERCOT Matthew Tozer.
Project Funding Report November 1, Business Integration Update – Agenda –Project Portfolio Updatep Revision Request Funding Reconciliation.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
COPS NOVEMBER 2012 UPDATE TO TAC 11/29/2012 Harika Basaran, Chair Tony Marsh, Vice Chair.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
Default Uplift Max MWh Activity Total Matthew Tozer Manager, Settlements and Billing WMS 1/8/2014.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
1 Project Update and Summary of Project Priority List (PPL) Activity February 11, 2016 ERCOT Public.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Operations Energy Settlements Business Requirements.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
October, 2011 MCWG/CWG Review of Abacus Loss Allocation ERCOT Mandy Bauld.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
Nodal Settlement Status and Observations Jim Galvin, SEWG Chair.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Settlement Update Austin Rosel ERCOT February 27, 2017.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT Market Design & Operations
Ancillary Service Trades and Ancillary Service Settlement
Settlement Update Austin Rosel ERCOT October 11, 2017.
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group 1.
Settlements Analysis due to SFT Deration Issue
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Presentation transcript:

ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014

2 Purpose of Presentation Cover the implementation details for the Settlements of the ORDC Protocols (NPRRs 568, 591 and 598) We will not be giving a training on the purpose or settlement of ORDC Training materials are available on the ERCOT website at the following location: With NPRR 591, we attempted to get as much settlements detail as possible into the protocols HOWEVER, since then we’ve had to make some updates that aren’t explicitly covered in the protocols. We will attempt to cover all of those details in this presentation One example is how we apply the “discount factor”

3 Highlights and Overview

4 Overview All data needed for ORDC settlements will be available in existing extracts and extract tables SID (Settlements Input Data Extract) Market Input Interval and Header RTMMODE (Real Time Market Operating Day Extract) Market Input Interval and Header Real Time Market Output Interval and Header RTMCODE (Real Time Consolidated Operating Day Extract) Market Input Interval and Header Real Time Market Output Interval and Header Data Agg Output Interval and Header PRDE (Public Reference Data Extract) Factor *** Two new tables will be introduced into PRDE to support NPRR 555 (loads in SCED) which will also go live on June 1 LOADRESOURCES and DISPATCHTYPE

5 Charge Types NPRR 555 is going live on June 1 with all of the ORDC changes, therefore: We are implementing the protocols in section 6 that state, “[NPRR568: Replace Section above with the following upon system implementation of NPRR568 and NPRR555:]” There will three new charge types: RTASIAMT - Real-Time Ancillary Service Imbalance Amount RTRUCRSVAMT - Real-Time RUC Ancillary Service Reserve Amount LAASIRNAMT - Load-Allocated Ancillary Service Imbalance Revenue Neutrality Amount per QSE Each of these charge types will have their own line item on the Real Time Market Settlements Statements They will be found in the Ancillary Services section Invoicing will take place through the Settlements Invoice There are NO changes to Day Ahead Market Settlements

6 Who Gets Settled for each Charge Type? RTASIAMT – Real-Time Ancillary Service Imbalance Amount Only QSEs with generation or QSEs with Load Resources will see this charge type on its Settlement Statement RTRUCRSVAMT - Real-Time RUC Ancillary Service Reserve Amount Only QSEs with generation will see this charge type on its Settlement Statement LAASIRNAMT - Load-Allocated Ancillary Service Imbalance Revenue Neutrality Amount per QSE Only QSEs with Load will see this charge type on its Settlement Statement

7 Implementation Details

8 Discount Factor Protocol Definitions for many of the bill determinants used in ORDC settlements state the following but don’t explicitly show a formula: “discounted by the system-wide discount factor” In the early phases of internal ERCOT system requirements development, it was not clear who would apply the discount factor. i.e. would the data flow into the settlements system already discounted, or would settlements apply the discount? Therefore, the specific discount factor calculations weren’t included in the NPRR 591 settlements formula updates The follow slides will detail each instance where ERCOT settlements is applying the discount factor

9 Discount Factor for inputs to RTCLRCAP RTCLRCAP_ = (RTCLRNPF_ – RTCLRLSL_ – RTCLRNS_ ) + RTCLRREG_ Where: RTCLRREG_ = SYS_GEN_DISCFACTOR * RTCLRREGR_ _ _ RTCLRNPF_ = SYS_GEN_DISCFACTOR * RTCLRNPFR_ _ _ RTCLRLSL_ = SYS_GEN_DISCFACTOR * RTCLRLSLR_ _ _ RTCLRNS_ = SYS_GEN_DISCFACTOR * RTCLRNSR_ _ _

10 Discount Factor for inputs to RTOLCAP RTOLCAP_ = (RTOLHSL _ – RTMGQ _ ) + RTCLRCAP _ + RTNCLRRRS_ + RTOFF10_ Where: RTOLHSL _ = SYS_GEN_DISCFACTOR * RTOLHSLR _ _ _ RTMGQ _ = SYS_GEN_DISCFACTOR * RTMG _ _ _ RTNCLRRRS_ = SYS_GEN_DISCFACTOR * RTNCLRRRSR_ _ _

11 Discount Factor for inputs to RTASOLIMB RTASOLIMB_ =RTOLCAP_ – [((SYS_GEN_DISCFACTOR * RTASRESP_ ) * ¼) – RTASOFF_ -RTRUCNBBRESP_ - RTCLRNSRESP_ - RTRMRRESP_ ] Where: RTASOFF_ = SYS_GEN_DISCFACTOR * RTASOFFR_ _ _ AND Where: RUC_ _ _ _ = 1 RTRUCNBBRESP_ = SYS_GEN_DISCFACTOR * RTRUCASA_ _ * ¼ Otherwise: RTRUCNBBRESP_ = 0 RTCLRNSRESP_ = SYS_GEN_DISCFACTOR * ((HNSADJ_ _ _ ) * ¼)) RTRMRRESP_ = SYS_GEN_DISCFACTOR * ((HRRADJ_ _ _ _ _ _ _<SP) * ¼)

12 Discount Factor for inputs RTOFFCAP RTOFFCAP_ = (SYS_GEN_DISCFACTOR * RTCST30HSL_ ) + (SYS_GEN_DISCFACTOR * RTOFFNSHSL_ ) + RTOFF30_ + RTCLRNS_ Where: RTCLRNS_ = SYS_GEN_DISCFACTOR * RTCLRNSR _ _ _

13 Exclusions to RTOLHSL and RTMGQ RTOLHSL _ = SYS_GEN_DISCFACTOR * RTOLHSLR _ _ _ RTMGQ _ = SYS_GEN_DISCFACTOR * RTMG _ _ _ Excluding Resources (i.e. consider interval value=0) that are : Non-WGR Intermittent Renewable Resources (IRR). — Intermittent Renewable Resource= ‘Y’ AND Fuel Type Category <> “WIND” Nuclear Resources. — Fuel Type Category= “NUC” Reliability Must-Run (RMR) Units— Resource contracted per Start and Stop Time (RMR Contract Table). And excluding intervals (i.e. consider interval value=0) which are: Intervals that Resources have a telemetered STARTUP Resource Status. ( STATUSSTARTUP_ _ _ =1) Intervals that Resources have a telemetered SHUTDOWN Resource Status. ( STATUSSHUTDOWN_ _ _ =1) Intervals that Resources have a telemetered ONTEST Resource Status. (STATUSONTEST_ _ _ =1) Intervals that telemetered net real power (TWTG) is less than 95% (TPVLSL_FACTOR as of go-live date) of the Resource’s telemetered Low Sustained Limit (AVGTLSL). ( TPVLSLFLAG_ _ _ = 0) Included in hours that a Resource has been Reliability Unit Commited (RUC) that were NOT bought back. ( RUC_ _ _ _ =1 )

14 TPVLSLFLAG Calculation If: TWTG_ _ _ > 0, Then, If: TWTG_ _ _ >= (TPVLSL_FACTOR * (AVGTLSL_ _ _ * ¼)) Set: TPVLSLFLAG_ _ _ = 1 Otherwise: Set: TPVLSLFLAG_ _ _ = 0

15 Hourly to 15 Minute Data Transformation All input bill determinants to the Real Time AS Imbalance charge type are at a 15 minute settlement interval, except for 3 that are at an hourly interval: HNSADJ HRRADJ HRUADJ The bill determinants that are provided at an hourly level, but be divided by 4 and that value should be scaled into each 15 minute interval in the hour RTCLRNSRESP_ = SYS_GEN_DISCFACTOR * ((HNSADJ_ _ _ ) * ¼)) RTRMRRESP_ = SYS_GEN_DISCFACTOR * ((HRRADJ_ _ _ _ _ _ _<SP) * ¼)

16 Other Details For Combined Cycles, all input data will be provided at the “Train” level, except for: HNSADJ, HRRADJ, HRUADJ (for generators, these are only inputs to RTRMRRESP, which is an adjustment only for RMR Resources) RUC RTRUCASA