Central He distribution service upgrade status and dedicated He distribution for AD K. Barth on behalf of TE/CRG ADUC and ELENA Meeting Wednesday, September.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
L. Tavian, TE/CRG, Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
ESS Cryogenic System Design
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
2 Technical seminar - 5 th June 2014 Vincent Roger - TE-MSC-TF.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
AT/ECR CRYOGENICS Organisation, Procedures and Communication with TCR Presentation for TCR-ECR-ACR Meeting 2003 by K. Barth.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Test Lab Cryogenic Requirements Kirk Davis Director’s Review of Cryogenic Capacity 26 May, 2010.
Experience from large helium inventory management at CERN ILC Cryogenics and Helium inventory meeting CERN, Wed. 18 th of June 2014 D. Delikaris Technology.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
TE-CRG Activities D. Delikaris, TE-CRG.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
Makara/Geynisman, Aug. 31, Cryo Dept. Shutdown Status.
Operation Status of the RF Systems and Taiwan Photon Source
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Installation of the T600 at Fermilab
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
2K Cold Box FDR Introduction
Magnet cryogenic system update.
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
HL-LHC IT STRING and Series test of SC link
Proximity Cryogenics P&IDs meeting
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Status of the cryogenic system for B180
The HIE—ISOLDE Cryogenic System, its Infrastructure and Considerations for Phase 3 O. Pirotte (TE/CRG)
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
TEST PLANS for HL LHC IT STRING
Teleconference ACS – FREIA 20th February 2018
ESR 2 Presented to Joint Hall A/C Summer Meeting
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
CTF Users’ Perspective
as a prototype for Super c-tau factory
Teleconference ACS – FREIA 19th June 2017
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
ESR2 Process Cycle Design
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Central He distribution service upgrade status and dedicated He distribution for AD K. Barth on behalf of TE/CRG ADUC and ELENA Meeting Wednesday, September 28, 2011

Under study and not funded phase 2 Consolidation proposal of the Central LHe distribution system Memos March, Sept. 2010, Approval Dec  Liquid helium transportable containers fleet increase (action in 2010)  Increase of the liquid helium production capacity (action in 2011)  Manage liquefaction overcapacity of the bld. 163 liquefier (action in 2011)  Increase of the liquid helium fixed storage capacity (action in 2011)  Pre-study to evaluate the cost of a dedicated LHe distribution for AD (action in 2011) Approved and funded phase 1

Central LHe distribution service current situation

Increase of the central service liquid helium distribution capacity – status update  Implementation of a nitrogen pre-cooling unit, reach a max. production capacity of 84’000 l/month (100 l/h liquefaction rate) Implementation of a nitrogen pre-cooling unit Implementation of a nitrogen pre-cooling unit Central Liquefier cold box opened and 1 st HX LN2 connection verified/established Construction /installation of transfer line for supply from Cryolab LN2 reservoir Modification of instrumentation and process control Commissioning and optimization (change of CB turbines) of new operation mode  Increase LHe buffer during no delivery periods (nights and week- ends), purchase and installation of a fixed storage (20’000 l) purchase and installation of a fixed storage (20’000 l)purchase and installation of a fixed storage (20’000 l) Qualified companies selected in agreement with purchasing service Technical specification is presently created, based on experience with previous specified LHe reservoirs.  Interconnect the two liquefaction units (bld. 165 and bld. 163) using new thermally insulated transfer lines to the additional liquid helium storage. P&I diagram of implementation and interconnection with existing infrastructureimplementation and interconnection Choice of geographical location and integration Choice of geographical location

Estimate of future demands for the central LHe distribution service from clients feedback Client2010 lHe demand [l/year] 2012 and onwards lHe demand [l/year] Evolution [%] AD Experiments % ATRAP % ASACUSA % ALPHA % AEGIS % ISOLDE (exc. HIE ISOLDE) % RESTRAP REXEBIS TWINEBIS WITCH ISOLTRAP Other Clients % Cryolab % LHC cable test facility % TOTAL %

How to cover in future the l LHe ? (90 l/h over 30 weeks of physics run / running hours)  Main demand (83%,370’000 l/year) from AD experiments  Appropriate infrastructure (liquefier, He storage, GHe recovery / purification) located at bldg. 165/253 (Cryolab Zone)  Transport of 20 – 24 x 500 l dewars between CL and AD per week, which have to be crane lifted into the experiments zones  Dedicated AD LHe ring line for supply of 370’000 to 400’000 l LHe in batches of 10’000 l: of 10k LHe dewar to be transported between CL and AD per week instead of 20 – 24 x 500 l dewars, which have to be crane lifted into the experiments zones LN2 demands of all 4 experiments could be also centralized and satisfied via batch transfer through the (thermal shield circuits) the same ring line

Dedicated LHe & LN2 distribution for AD experiments Based on dedicated intermediate storage reservoirs for LHe and LN2 which supply the four AD experiments inside the hall via a cryogenic distribution ring line.

P&I AD LHe/LN2 distribution

Preliminary Cost Estimate for dedicated AD LHe distribution  LHe/LN2 transfer ring line (150 m): 400 kCHF  One stationary, intermediate LHe storage reservoir: 100 kCHF, plus an additional 10k mobile LHe dewar: 80 kCHF  LN2 storage reservoir: 12 kCHF/year (rental), 150 kCHF (buy)  Process control / instrumentation: 100 kCHF  CERN Manpower requirements to be estimated TOTAL: 600 – 800 kCHF in addition to the 300 kCHF already approved for phase 1

Conclusion/Recommendation   With the presently known user LHe demands for 2012 and onwards, phase 1 is sufficient !   Phase 2 (not approved) could be implemented for the restart of the LHC injectors in 2014   Main gain with the implementation of phase 2 would be: No crane handling and less transport logistics for delivering LHe and LN2 to the four AD experiments The operation and maintenance of the AD LHe and LN2 distribution system would be performed by cryogenics group according to optimized procedures, which will reduce turnover (and associated losses) of GHe to recovery and purification system Thank you for your attention.

Central Liquefier cold box modifications during 2011 SD De-installation of CB and transport to workshop for validation if HX has a LN2 circuit implemented! Good news: It has! Bad news: there is no transition piece AL – Inox pre- installed and only limited space available. The transition piece to be installed is very short, difficult and critical welding. Overheating can create a leak on the HX He and LN2 circuit, which would mean the CB is gone! (HX replacement ) Fortunately we have excellent welders at CERN! And on top of this they are compact enough to weld even in difficult spaces! Great job! HX was not damaged and all circuits are proved to be leak tight. Additional vacuum tank passage created to connect LN2 transfer line to HX.

Commissioning and optimization (change of CB turbines) of new operation mode  Presently (started Wed ) the LN2 pre-cooling is tested and commissioned  First performance/liquefaction measurements done Very preliminary result from first 12 hours of continuous running: liquefaction rate > 120 l/h  For maximum performance T1 of the CL coldbox has to be replaced. Required turbine type should be in spares stores. Back

Purchase and installation of an additional LHe storage (20’000 l) - status  Process/flow/instrumentation diagram how to integrate an additional LHe reservoir into existing infrastructure (on-going, production in a standard electronic format)  Location / physical implementation of the new reservoir (on-going, choice of the geographical location done)  Creation of tech. specification for a purchase of the a stationary storage tank. On-going (on-going, choice of suppliers done, writing of tech. spec. taking into account implementation and defined supply interface) Back

P&I diagram of integration and interface of new LHe reservoir  Functional analysis of implementation  Operational wishes, taken into account: Connect filling and supply side with 163 cable test facility and central LHe services bldg. 165 Provide (additional) filling/supply point of LHe mobile dewars (100 – 500 l, 10’000 l, LHe containers from suppliers) Minimize GHe flash during (batch) transfers to mobile dewars Keep a maximum of existing infrastructure, which is in good condition (dewar filling station inside bldg. 165) Operation of 163 test facility independently of new reservoir possible due to new transfer lines. Increase GHe inventory of the zone to keep balance with increased LHe storage. New warm GHe line between bldg. 165 and bldg. 180 additional budget of 120 kCHF needed  Interface to new reservoir Standard stationary LHe reservoir of the supplier Standard stationary LHe reservoir valve box connected via GHe and LHe collectors to new tank (external supply, option of the reservoir supply contract) Careful dimensioning (buffer volume) of GHe collector to allow parallel supply from three sources! Back

Location / physical implementation of the new reservoir 15 No interference with presently on-going consolidation of bldg. 165 Longer transfer line to connect 163 from/to new storage reservoir, calculation of required dP on-going. Close to use existing dewar filling station with LHe flowing by gravity Installation with two mobile cranes as done for the LN2 reservoir in the zone Back

Standard LHe reservoir 4 (5) Qualified companies CRYO DIFFUSION S.A. France / VRV S.p.A. ITALY CRYO AB, Sweden Gardner Cryogenics, US Wessington Cryogenics, UK Back