Safety Monitor modifications: Ofgem’s recent decisions Simon Bradbury.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
A regulatory framework for gas quality treatment facilities: recap and update.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NEC & EMERGENCY ARRANGEMENTS Paul Green 2 nd June 2005 NGT Emergency Planning.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Energy Risk Management – 3 October 2006 Increasing interactions with global energy markets - the impact on the GB gas market Jo Witters Wholesale Markets,
NTS Update Gas Customer Forum 25 th September 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
SEM MODS COMMITTEE SLIDES Registration of Charges over Collateral Reserve Accounts – Proposed Code Modification.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
10 November 2015 GAZ DE FRANCE ESS Modification Proposal 0086 “Introduction of gas demand management reserve arrangements” 1 st June 2006 Phil Broom and.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Industry data quality, ownership and governance Meeting with UNC 17 July 2014.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
UNC Modification 0050 – Storage Monitor Adjustment.
Mark Dalton 4 February 2010 Transmission Workstream Discussion slides.
Review Group -140 Thoughts on additional information requirements.
Credit Cover Seminar The Proposed Way Forward Peter Bucks 25 April 2003.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Economic regulation of electricity and gas network businesses Mark Feather, Acting Executive Director 23 November 2011.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 7th Dec 2006 Chris Logue
Review of System Alerts
Review Group 291- Ofgem Update
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
Modification Proposal 0192 – Draft Business Rules.
Consideration of issues raised by UNC Modification Proposal 0244
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Review Group 291- Ofgem Update
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Consideration of issues raised by UNC Modification Proposal 0244
Mark Freeman 29th January 2007
Entry Overrun Calculation
Proposed Changes to UNC Section Q Emergencies - Mod 035
Transmission Workstream, 1 Mar 07
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Presentation transcript:

Safety Monitor modifications: Ofgem’s recent decisions Simon Bradbury

1 December 2005 Background Oct-04  Safety Monitors introduced following removal of top-up Mar-05  NEC Safety Case revisions –new Monitor Breach Emergency –ability for NEC to revise storage flows

1 December 2005 Recent modification proposal decisions Mod 035  Defining GS(M)R Safety Monitor Breach in UNC  Introducing ability for NEC to curtail storage into UNC Mod 050  Enabling NG NTS to revise monitor levels in response to material changes in its supply/demand forecasts

1 December 2005 Considerations  In reaching its decisions, the Authority considered:  Its assessment of the modifications against the relevant objectives –Standard Special Condition A11 (a), (b), (d), (e)  Its wider statutory duties –Protecting customers –Security of Supply

1 December decision  REJECT - on balance, mod 035 did not better facilitate the achievement of the relevant objectives Relevant objective (a)  Perverse incentives to withdraw gas from store as curtailment would not be compensated  May not need emergency interruption if no supply/demand issues  Detrimental impact on storage investment Relevant objective (d)  Discrimination

1 December decision  ACCEPT – on balance, mod 050 did better facilitate the achievement of the relevant objectives Relevant objective (a)  Dynamic storage monitors can more accurately reflect supply/demand conditions  NG NTS discretion (accompanied by transparency) appropriate Relevant objective (d)  Recognise that variations in monitor levels could have large commercial impact

1 December 2005 Issues for development  Form and level of compensation for curtailment  Commercial incentives on NG NTS  Improved transparency  Market based way to meet Safety Monitor requirement

1 December 2005 Main areas for development in short term  Cash payment compensation and title transfer  Commercial incentives for NG NTS to manage costs  Improved transparency/info release  Remove emergency interruption abilities in Monitor Breach

1 December 2005 Main areas for development in longer term  Develop market based mechanisms for procuring overall requirements  Develop appropriate LR commercial incentives for NG NTS  Align commercial framework of UNC and Safety Case

1 December 2005 Way forward  For market participants to react to short term issues  Ofgem led review to be initiated in relation to longer term issues –more info to be provided shortly

1 December 2005 Promoting choice and value for all gas and electricity customers