Bridge Construction Forum 2006 The Human Factor Duff Joseph, Erreca Inc. Working to Build the Future Together.

Slides:



Advertisements
Similar presentations
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Advertisements

The role of shared services in building capacity of local government 31 July 2012.
EFM Workforce Development in the NHS Helen Agahi Jill Fortune 12 March 2009.
BAI HELPDESK Pressing your spacebar will take you through this presentation.
C ontent of the IEP Produced by NICHCY, The IEP series… IEP Team Content of the IEP Meetings of IEP Team LRE Decision Making Children with Disabilities.
AASHTO Survey on Construction Cost Increases and Competition Summary of Responses April 2006.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
MAT Services For Piping & Constructing. Who we are? MAT Services is a new established contracting company in 2013 by a skilled team of both Electro-mechanical.
Evolving comprehensive HR Policy in Oil Industry Presented by: V C Agrawal Director (HR), IndianOil.
Communication! Facilitation!. What is a Facilitator?  A facilitator/Leader must know how to build consensus and productively manage conflict within the.
CONTRACT SETTLEMENT THE LANGUAGE Limits on IEP, 504 and PST meetings during planning Planning time for Part Time Teachers Guarantee interview.
Your answer to:  QUALITY  EXCELLENCE  CONFIDENCE  SUPERIORITY  CRAFTSMANSHIP  EXPERTISE And all your construction needs. Servicing the Chicago land.
Effective Delegation.
PART 2: CORE STAND TOGETHER FOR SAFETY PRESENTATION.
1 Province of the Eastern Cape DEPARTMENT OF AGRICULTURE CONDITIONAL GRANT AND CAPITAL EXPENDITURE THIRD TERM REPORT.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
By: Amanda Runte  The Virtual Assistant is a self-employed, off- site administrative professional who assists businesses of every size.  Known as secretaries,
KYTC Bridge Preservation and Maintenance Program David Steele, P.E. Branch Manager for Bridge Preservation.
AASHTO Subcommittee on Construction
CSC 177 Research Paper Review Chad Crowe. A Microeconomic Data Mining Problem: Customer-Oriented Catalog Segmentation Authors: Martin Ester, Rong Ge,
MECE 1101 Introduction to Mechanical Engineering
2006 California Bridge Construction Forum Opening Remarks Dolores Valls, Chief, Statewide Operations Offices of Structure Construction.
 October Budget  Spacing Survey Standards / Fire Assessments  Consultation  Timelines  Lack of skill worker to space  People’s opinions / Spacing.
Slide 1 Caltrans Bridge Construction Forum 2007 Bidding Process and Construction Environment Brian Mapel FCI Constructors Inc. Jeff Abercrombie California.
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
How to Make the Industry Appealing to Today’s Generation Monday, September 22, :00pm – 2:00pm.
Surety Bonds 101 The Basics of Bonding. Surety Bonds Vs. Traditional Insurance Surety BondsInsurance 3-party2-party Risk transfer Duty to obligeeDuty.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Hosted by the Family Institute for Education, Practice & Research For audio please call and enter the code # Any technical difficulties.
Acadia Institute for Teaching and Technology1 Creating a Balanced Course.
Structural Engineering By: Chris Welcome. What do they do? Decides what structural system is the best for a building, or any other standing object that.
HAYS ASIA SALARY SURVEY 2009 Specialist Recruitment hays.com.hk hays.cn Nigel Heap Managing Director Asia Pacific Survey Overview 2009.
Topic 1Topic 2Topic 3Topic 4Topic
Strategic Risk Forum - February 2013 The Built Environment – No Quick Fix.
Sense of Initiative and Entrepreneurship This project has been funded with support from the European Commission. This [publication] communication reflects.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
ISPE Central Canada Chapter Annual Meeting September 28, 2006 Yvon R. Tessier Pharmaceutical contract manufacturing challenges.
Sit 2-3 people per group. EVERYONE needs a pen/pencil and paper for notes titled: SOFT SKILLS On your OWN notes paper answer the following, from your OWN.
Electric / Gas / Water Summary of White Paper Findings CPUC SWH Workshop August 26, 2008.
PLANNING A TERRITORIAL NETWORK Tips for success. Putting different know-how bearers and educators together is necessary but not necessarily conducive.
Training the Next Generation of Mainframe Engineers Joseph Bedell Jason Breen Joe Parisi ECC June 11 th 2013.
BUILDING BETTER ZONTA LEADERS District 6 Fall Conference 2015.
Trends are long lasting changes in the world, fads are short term changes that can exist with trends. People sometimes use the terms interchangeably, but.
Preliminary TNA results. QUESTIONNAIRE Presumptions : -Shortages and mismatch of skills required by businesses -Lack of adequate training programmes to.
Risks for Investment in Hydropower Sector in Nepal; Developers’ Perspective Power Summit 2008 Kathmandu, Nepal September 24th 2008 Presented by: Dr. Sandip.
Caltrans Bridge Construction Forum 2007
Construction Inspection for Field Office Activities Welcome by SCE Introductions Name Position (SCT, SC, DC, CET, ETC) Location Instructors 1.
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
SWIMMING THROUGH THE OLPT PROCESS LAS LINKS & ITBS.
Interviewer : Nursel UÇAŞ Interviewee : Kubilay KONAN.
FCC-DOL Joint Workshop on Communication Tower Safety RFI Panel February 11, /11/2016 FCC-DOL Joint Workshop on Communication Tower Safety 1.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
1 Engineering Training Needs Project Provincial Engineering Meeting February 28, 2008.
CONREPNET Performance based rehabilitation of reinforced concrete structures Members workshop – London – 24 & 25 April 2006 The present and future in concrete.
ISIPHIWO TRADING PRESENTATION
Today’s Presenter - Jim Bergman © 2009 Commitment Management, Inc. All Rights Reserved Contract Clarity Welcome.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Foundation Repair in Kansas City
FDOT Support Services Programs
1888PressRelease - Academy Electrical Contractors Donates Generator to Hackensack Children's Hospital for a Very Special Event
Ohio’s Research Initiative for Locals
Quality Control Personnel Training
SELECTIVE FORESEE THE FUTURE WITH.
Human Resources Development
Triangles are everywhere in bridge construction!
Questions What are further capacity development needs – technical topics vs. soft skills, both for LGUs and water utility companies? What are the opportunities.
Count on 2 (Over the bridge)
Identifying Topic Sentences
Fall 2019 Convocation Proposal
Presentation transcript:

Bridge Construction Forum 2006 The Human Factor Duff Joseph, Erreca Inc. Working to Build the Future Together

2 “He or she does not know what he or she is doing” Contract

Working to Build the Future Together 3 Bridges are more than just concrete and steel.

Working to Build the Future Together 4 All projects are eventually completed.

Working to Build the Future Together 5 The good And the bad

Working to Build the Future Together 6 Last year’s forum attendees.

Working to Build the Future Together 7 The human factor

Working to Build the Future Together 8 The topic and participation surveys comments were: “Find experienced bridge inspectors” “Make bridge and district work for the same company” “Let the people doing the work, work” “The best answer is not always no”.

Working to Build the Future Together 9 “Everyone on this project did their best to get the bridgework completed.”

Working to Build the Future Together 10 Technology

Working to Build the Future Together 11 Discussion questions:

Working to Build the Future Together 12 What can be done to insure that the staff work together and to reduce the stress of Bridge Construction? How can we alleviate the shortage of qualified personnel for both the contractors and Caltrans in the short and long term? How are we going to transfer the necessary technical and soft skills to the new generation? How are we going to overcome the lack of experience at the field level, on both sides?

13 Bridge Construction Forum 2006 The Human Factor Working to Build the Future Together