US Army Corps of Engineers Portland District Sediment Evaluation Framework and Project Review Group Update Marci E. Cook Project Coordinator, RSET/SEF/PRG.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Advertisements

Student Intervention & Support Services (SISS) Overview of the IEP Process Professional Development for Professional Staff Wednesday, May 7, 2014.
Eric D. Johnson, Executive Director Washington Public Ports Association October 13, 2009.
IDEA Advisory Special Education Roland-Grise Middle School Auditorium August 21, 2009.
Perspective on the Sediment Evaluation Framework Brenden McFarland Washington Department of Ecology Oct 13, 2009.
November 13, 2003IEEE Albuquerque Plenary Session 1 Moving Forward Robert D.Love LAN Connect Consultants C /113.
MARSSIM Revision 2 Request for Input Public Meeting February 10, 2011 Kathryn Snead MARSSIM Workgroup Chair.
CFSAN’s Peer Review for Risk Assessments Robert L. Buchanan, Sherri Dennis, and Marianne Miliotis.
WESTCAS 2011 Winter Conference Fort Worth, Texas February 24, 2011.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
STRONGER State Review Process Presentation to the EPA May 2005 Lori Wrotenbery.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
OHIO SOLID WASTE MANAGEMENT REVIEW UPDATE TO SWAC August 15, Ohio Solid Waste Management Review9/7/2015.
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Proposed 2013 Revision to ORSANCO Pollution Control Standards for Discharges to the Ohio River.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Present Development of a Regional Guidance Document for Dredged Material Evaluation Christopher McArthur, P.E. (US Environmental.
Webinar on the March 19, 1983 Economic and Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies 7/7/20091.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Florida Education: The Next Generation DRAFT March 13, 2008 Version 1.0 September 2009 Federal Programs Update FASFEPA Presented by: Dr. Jan Morphew, Director.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
IEEE COMMITTEE TO RESOLVE MEMBERS' CONCERNS FINAL REPORT IEEE Central Texas Section Spring Section Meeting January 25, 2014 San Marcos, TX.
Tool Box Implementation Schedule DO TMDL Subcommittee Meeting June 19, 2012.
Permitting Lessons Learned: How to Make the Most of Your Agency Partnerships October 15, 2008 Marla Harrison, Environmental Manager.
Transportation Improvement Program Status and Update.
TPIT using Model On Demand Jay Teixeira Manager Model Administration Regional Planning Group 5/21/13.
© 2014, Florida Department of Education. All Rights Reserved. Bureau of Federal Educational Programs Updates _________________________________.
LCA Comprehensive Study Louisiana Coastal Area, Louisiana- Comprehensive Coastwide Ecosystem Restoration Feasibility Study.
BUILDING STRONG ® And Taking Care Of People! Southern California-Dredged Material Management Team (SC-DMMT): Origin History: o In place since approx. August.
Overview of FDA's Regulatory Framework for PET Drugs
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update Steven Bay Southern California Coastal Water Research Project.
Development of Sediment Quality Objectives for California Bays and Estuaries Technical Approach Steven Bay Southern California Coastal Water Research Project.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group February, 2012 Irvine, CA PWG F2F.
Commercial Project Reviews Information to assist with your project.
Vancouver1 ProjectIEEE Working Group on Mobile Broadband Wireless Access TitleSchedule Considerations Date.
1 Program Release 2008 Update to the Administrative Council August 9, 2007.
DO TMDL Subcommittee Meeting June 19, A Bit of History ( ) Summer-Fall 2008 BAP discussion begins Study Proposal formulated Summer-Fall.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
December 16, :00 – 2:45. MPM Team Agenda 1.Review of MPM Program and Team 2.Consensus items document 3. Upcoming activities 4. Discussion.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
Proposed 2015 Work Plan and 3 Year Look Back September 18, 2014.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
NAHMMA Conference - PBT Rule September 22, Developing a PBT Regulation in Washington State Mike Gallagher, Washington State Dept. of Ecology 20 th.
Doc.: IEEE /263r0 Submission José A. Gutierrez July-2002 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2012 Redmond, WA PWG F2F.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Metadata Working Group Charter Update Jennifer Carlino, Acting Chair FGDC OS/USGS June 13, 2012 Coordination Group Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
Nunavut Wildlife Research Trust and Studies Fund March 2015.
Elementary Math Adoption Sit with your grade level teams! September 25 th, 2013.
Office of the State Fire Marshal Pipeline Safety Division
Bow Basin Watershed Management Plan Revised Terms of Reference
Proposed Bay TMDL Schedule
All Wales Safeguarding Procedures Review Project
Summary of PMHP Performance Improvement Projects Validation Findings
Next Steps Advisory group debrief call Circulate meeting summary
Session #5 Closing Status November , 2003
RHPWG – Control Measures Subcommittee Oil & Gas Source Coordination
School Management Monitoring and Evaluation
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Budget and Legislative Request
Miscellaneous CHEN 4470 – Process Design Practice
Presentation transcript:

US Army Corps of Engineers Portland District Sediment Evaluation Framework and Project Review Group Update Marci E. Cook Project Coordinator, RSET/SEF/PRG Portland District Corps of Engineers

US Army Corps of Engineers Portland District Sediment Evaluation Framework (SEF) Update Goal of Regional Dredging Team and the Regional Sediment Evaluation Team is to produce a multi-agency consensus document which provides consistency to sediment testing guidelines for the region Goal of Regional Dredging Team and the Regional Sediment Evaluation Team is to produce a multi-agency consensus document which provides consistency to sediment testing guidelines for the region Intent is to apply document throughout OR, WA & ID by all 3 Districts (Portland, Seattle and Walla Walla) to all permit applicants and Civil Works projects Intent is to apply document throughout OR, WA & ID by all 3 Districts (Portland, Seattle and Walla Walla) to all permit applicants and Civil Works projects Implementation Manual is currently the Interim Final Sediment Evaluation Framework (SEF) published in September 2006 Implementation Manual is currently the Interim Final Sediment Evaluation Framework (SEF) published in September 2006  Comments received and will be addressed in the next draft version of the SEF  Contractors contributions will help finalize SEF (Subcommittees in place for Bioaccumulation, Chemical Analyte and Biological Testing)

US Army Corps of Engineers Portland District SEF Update What’s Happening Now? What’s Happening Now?  New Schedule for completion of SEF Draft Final SEF Public Release in January 2009 Draft Final SEF Public Release in January Public Meetings to be held in January 2009: 3 Public Meetings to be held in January 2009:  Oregon, Washington and Idaho (Exact locations yet to be determined) Scheduled release date of Final SEF: May 29, 2009 Scheduled release date of Final SEF: May 29, 2009 If you’d like to be on the mailing list or mailing list for copies of the Final Draft SEF please contact me at: (503) or via e- mail at:

US Army Corps of Engineers Portland District SEF Update What the Future Holds? What the Future Holds?  The RDT and the Corps recognizes the need to update the SEF given new science and research in the region  The goal: To continue to have yearly updates to the SEF and a yearly outreach meeting to allow public comment on any new information and updates to the SEF

US Army Corps of Engineers Portland District Project Review Group Update By the process and criteria set forth n the final SEF, the Project Review Group (PRG) will review and provide decision documents for all dredging work proposed in the region By the process and criteria set forth n the final SEF, the Project Review Group (PRG) will review and provide decision documents for all dredging work proposed in the region PRG has increased transparency, consistency and coordination with applicants/consultants – applicants and consultants join weekly PRG calls. PRG has increased transparency, consistency and coordination with applicants/consultants – applicants and consultants join weekly PRG calls. Overall, the PRG effort results have been positive Overall, the PRG effort results have been positive

US Army Corps of Engineers Portland District PRG Update August June 2008 Project Numbers August June 2008 Project Numbers  Since August 2007, 103 project have been submitted to the PRG 99 Regulatory Project 99 Regulatory Project  14 Port Projects 6 - Port of Portland 6 - Port of Portland 3 - Port of Vancouver 3 - Port of Vancouver 2 - Port of Morrow 2 - Port of Morrow 1- Port of Kalama 1- Port of Kalama 1- Port of Brookings 1- Port of Brookings 1- Port of Siuslaw 1- Port of Siuslaw 4 Federal Projects (CRCIP, MCR, Tillamook, Springwater) 4 Federal Projects (CRCIP, MCR, Tillamook, Springwater)

US Army Corps of Engineers Portland District PRG Update 50 Applications – 49 met 30 day review requirement 12 Level 1 Review (historical data review) – 11 met 30 day review 16 Draft Sediment Analysis Plan Review – 14 met 30 day review 17 Sediment Characteristic Review – 15 met 30 day review (2 SCR reviews were first SAP reviews) 10 Other (Inquiries or project rescinded without submitting to PRG) Results of PRG Effort to date: 86% complete within 30 days