P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.

Slides:



Advertisements
Similar presentations
Mitglied der Helmholtz-Gemeinschaft PAX Status and future plan June 26, 2012 | Alexander Nass.
Advertisements

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
AESOP: Accurate Electron Spin Optical Polarimeter Marcy L. Stutzman, Matt Poelker; Jefferson Lab Timothy J. Gay; University of Nebraska.
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
The polarized hydrogen jet target measurements at RHIC Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group: I. Alekseev, E.
11/18/2003Haixin Huang1 RHIC Polarimeter Status All targets and Si detectors have been installed at the end of October. The targets survived the vacuum.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
DIS 2006 Tsukuba, April 21, 2006 Alessandro Bravar Proton Polarimetry at RHIC Alekseev, A. Bravar, G. Bunce, S. Dhawan, R. Gill, W. Haeberli, H. Huang,
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
7/30/99Douglas E. Fields for the E950 Collaboration 1 A CNI Polarimeter for RHIC Spin Results from IUCF CE75 & AGS E950 M. Bai, G. Bunce*, H. Huang, Y.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
Beam-based vacuum observations and their consequences Sergei Nagaitsev August 18, 2003.
Status of Moeller Polarimeter Peter Otte April 7, th Collaboration Meeting, Dubrovnik.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
Polarization Measurements of RHIC-pp RUN05 Using CNI pC-Polarimeter Itaru Nakagawa (RIKEN/RBRC) On behalf of CNI Polarimeter Group I.G.Alekseev A A.Bravar.
Polarization Measurement of 100GeV Proton Beams at RHIC with CNI pC Polarimeter Itaru Nakagawa (RIKEN/RBRC) On behalf of CNI Polarimeter Group I.G.Alekseev.
Electron Detection for Compton Polarimetry Michael McDonald Outline -Compton Effect -Polarimetry -Detectors -Diamond Results.
Proton Polarimetry at the U-70 Facility Sandibek Nurushev Institute for High Energy Physics, Protvino, Russia International Seminar on High Energy Spin.
» Absolute Polarimetry of Proton Beams at RHIC« Oleg Eyser for the RHIC Polarimetry Group International Workshop on Polarized Sources, Targets and Polarimetry.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
Proton Polarimetry at RHIC K. Oleg Eyser for the CNI polarimeter group Newport News, VA, October 25, 2013.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
1/30/2016Douglas E. Fields for the p+C CNI collaboration 1 Test of Small Angle Elastic Proton-Carbon Scattering as a High Energy Proton Beam Polarimeter.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC pC polarimeter what has been achieved and what needs to be done Osamu Jinnouchi RBRC 2/10/05 RSC meeting.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
T980 STATUS AND CHANGES FOR
A.Smirnov, A.Sidorin, D.Krestnikov
Project planning and status (February 2018)
Today’s topics; New AN and ANN results at s = 6.9 GeV
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Presentation transcript:

P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group

December 4, 2009

New target motion mechanism.

 Additional set of detector ports will facilitate new detectors development, while keeping the established technique intact.  Two sets of targets will extend the period between target replacements and reduce the machine downtime.  Additional polarization and emittance measurements can be done with extra set of targets (polarization and emittance measurements during the energy ramp).  A new carbon target production technique (by the laser ablation developed at TRIUMF, Vancouver, Canada) will be also tested.  The polarimeter upgrade project is funded by CAD ($150k) and RIKEN ($75k) and planned to be completed by the end of December 2008 for operation in 2009 polarized proton run.

p-Carbon polarimeter operation in Polarimeter survived all the upgrades. Reliable operation in switching mode (between vertical and horizontal planes) was demonstrated after a few software glitches were fixed. Beam intensity profile measurements made essential contribution to emittance calibration and knowledge of absolute values. Rate problem for polarization measurements. Maximum carbon rate up to 8 million event/s, ~1 events/bunch crossing (for 72 strips). About 3-5 rate variation was observed for the regular target thickness. It looks like thinner target lifetime is the same (or better?) than thicker targets. To accumulate required statistics ~ 20 millions events target should sit longer time in the beam. The effect to the beam emittances and luminosity is negligible at store. The only problem would be target lifetime.

Vacuum system upgrade. Polarimeter chamber is pumped by two pumps (ion pump ~1000l/s and NEG cartridge ~ 2000 l/s hydrogen) isolated by vacuum valves. Diam. 8.0” (ID) nipples and valves provide sufficient conductance to utilize full pump capacity. Isolation valves will allowed proper pump conditioning and faster turn around time after the venting. In future we plan to setup some moderate chamber baking after testing of polarimeter components (targets, detectors, Am-sources) tolerances to temperature. ~ 1.5*10^-10 vacuum was obtaine after two weeks pumping.

March 22

P-Carbon CNI polarimeter. Target speed steps/sec → 15 mm/sec linear speed was used for emittance measurements steps/s for polarization measurements. ~ 100 mm RHIC beam 180 mm 10 mm-SSD Scattering angle ~0.5 deg ~1.6 mm

The target ladder.

Target alignment jig.

Yellow targets effective thickness spread

Blue targets effective thickness spread

Y-1, V#5 (12)

Blue-1, V#4 (3)

Blue-1, V#2 (8)

Blue-2, H#1, (2)

Y-2, V#5, (2.8)

Carbon targets Evaporation (glass slide, mask preparation). Floating. Picking. Measurements (reproducibility). Attachment to the ladder. Ladder installation. Pumping. Target motion. Beam exposure.

Plans. Work out new procedure for more reproducible (thin) target production. Test new laser ablation evaporation technique (TRIUMF). Set-up target width measurement. Much more manpower will be required. There is a plan to hire a dedicated technician (~50% time shared with instrumentation group). If laser ablation works well, we can try to set up similar facility at CAD (Masahiro Okamura).

Target lifetime Carbon strip target is only 5-10  m wide and 4-5  g/cm 2 thick. This corresponds about atoms in the beam. The recoil Carbon production rate is about 10^8 atoms/s at present very high RHIC beam intensity), therefore after one hundred (10 s) measurements about 0.1% of carbon atoms are knocked out of the strip. Some targets survive for two weeks which corresponds to about 300 measurements.