POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS 1486468 B.RIFFAUD On behalf of EN-MME design team.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
LIU–PLI report LIU Project Team meeting. LIU - Planning & Installation Coordination Meeting Space Reservation & Engineering Change Request - Guideline.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
LIU and (E)YETS LIU-SPS Coordination Meeting 28/01/15 David Mcfarlane
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Primary beam production: progress - Extraction from LSS2 - Switching from TT20 at 100 GeV B.Goddard F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis,
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
LIU-SPS upgrade, schedule, target parameters and observed limits 1 B. Goddard, E. Shaposhnikova for LIU-SPS coordination team SPS scrubbing review
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Discussion and preliminary conclusions LIU-SPS dump review.
1 TI 8 LHC SPS LSS6 IR2 TT41 LSS4 IR8 TI 2 TT60 TT40TT20 LSS2 LSS1 TT10 Mobile dump block (TED) Targets T2, T4, T6 Target T40.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
LIU Workpackages 1 August 2014 Edms Id LIU-PM-PP-0030
LIU – EVM status and next steps
SPS - EYETS 2016/17 Vacuum systems planning
Planning and Installation
Long Shutdown for the LHC: Vacuum Beam Pipes
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE-ABT Activities for LS2
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
How to run ions in the future?
Junji Urakawa (KEK) for ATF International Collaboration
Impedance working group update
SPS Injection BIS - Draft requirements
Presentation transcript:

POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team LIU-PLI Meeting – 25/02/2015

LIU - PSB BT-BHZ10 & BTM-BHZ10 →Owner : J.Hansen. →Request : Design of new Y and V chambers. →Design kick-off : 2 rd quarter →Estimated MME resources : to be defined. BR-16L1 (kicker) →Owner : J.Hansen. →Request : Design of a new chamber. →Design kick-off : 2 rd quarter →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20152

LIU - PS BMP42 (bumper) & SMH42 (septum) →Owner : M.Hourican. →Request : Design of a new bumper/septum system + vacuum device. →Design kick-off : 3 rd quarter →Estimated MME resources : 2015 (1 FTE), 2016 (0.5 FTE). MSIV (septum) →Owner : M.Hourican. →Request : Design of a new MSIV magnet. →Design kick-off : 3 rd quarter →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20153

LIU - SPS ZS →Owner : B.Balhan. →Request : Beam losses at high energy level (electron cloud and electrical issues). Improvement of pumping system, impedance reduction, improvement of ion trap connections, short-circuiting of anodes. →Design kick-off : Inter-tank definition : 1 st /2 nd quarters BI integration : 3 rd quarter ZS4 preliminary design : 2nd quarter →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20154

LIU - SPS TPSG4 & TPSG6 →Owner : B.Balhan. →Request : Replacement of TPSG4 & 6 by more robust versions for MSE protection (increase of length, similar version as TCDQ for TPSG6). →Design kick-off : to be defined. →Estimated MME resources : 2015 (0.5 FTE / TPSG4, 0.5 FTE / TPSG6) TPST →Owner : B.Balhan. →Request : to be clarified. →Design kick-off : not before →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20155

LIU - SPS TIDVG (new core) →Owner : O.Aberle. →Request : Replacement of present TIDVG core with improved version (robust enough for present and future LHC beams). →Design kick-off : 2 nd quarter 2015 →Estimated MME resources : to be defined. Vacuum sectorization LSS1 →Owner : P.Chiggiato. →Request : Addition of sector valves around TIDVG and MKP/D in order to reduce personnel dose, to protect sensitive equipment and to reduce pump-down time. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20156

LIU - SPS 200 MHz power upgrade →Owner : E.Montesinos. →Request : Design of supports (to be confirmed). →Design kick-off : to be defined. →Estimated MME resources : to be defined. SPS and TI2/TI8 protection devices →Owner : R.Losito. →Request : Replacement or extension of present TCDI system, with more robust collimators and improved protection. Displacement upstream in TI2/8 in order to reduce losses in LHC injection region. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20157

LIU - SPS New external High Energy Dump →Owner : B.Goddard, R.Losito. →Request : New dump block based on TED design in existing beam line, using existing extraction and new switching magnets (objective : dumping of high intensity LHC beam during setup). →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20158

LIU - SPS 50ns (100ns ?) rise time kickers for ions →Owner : B.Goddard, J.Uythoven, T.Kramer,, R.Folch, B.Holzer, J.Hansen, M.Hourican. →Request : Addition of new kicker MKP (PFL in parallel to PFN), thin in- vacuum septum MSIV, dump, beam instrumentation and vacuum devices in order to allow injection of ions with 50ns rise time. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/20159

LIU - Ions LINAC3 Oven test stand →Owner : D.Kuchler. →Request : Increase knowledge on oven behaviour. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LINAC3 LBS →Owner : ? →Request : Energy measurement of LINAC3 beam : new spectrometer line after BHZ20 (modification or new spectrometer). →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/201510

LIU - Ions LINAC3 LEBT →Owner : J.Bellodi. →Request : Increase intensity in LINAC3/LEAR : Rematch optic in Low Energy Beam Transport. Design of new magnets to be confirmed. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LINAC3 Source test stand (to be approved) →Owner : D.Kuchler →Request : New spare source. Source test stand for validation, tuning and Training. →Design kick-off : to be defined. →Estimated MME resources : to be defined. LIU-PLI Meeting – 25/02/201511

LIU - Ions LEIR Beam Stopper →Owner : I.V.Leitao. →Request : New Dump and Y vacuum chamber. →Design kick-off : 3 rd quarter →Estimated MME resources : 0.3 FTE (0.1 for dump, 0.2 for chamber). LIU-PLI Meeting – 25/02/201512

Conclusion No official requests were sent to EN-MME for these jobs. 0.3 FTE are already booked in EN-MME provisional planning (first half 2015) for PSB-BT-BHZ10, various BE-BI jobs & various LIU jobs. 2.3 FTE are planned in 2015 (second half) and 0.5 FTE are planned in 2016 for BPM42/SMH42/TPSG4/TPSG6 and LEIR Beam Stopper, but resources are not included in EN-MME provisional planning yet. Since EN-MME provisional planning is almost full for 1 st and 2 nd quarters 2015 (main activity for HL-LHC, AD/ELENA & LIU projects), it is really important to anticipate your request to EN-MME in order to get the best service possible in Request = Detailed Specification + Deadlines. LIU-PLI Meeting – 25/02/201513

Thank you for your attention