Jet Slice – use of TopoClusters Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 20 August 2014.

Slides:



Advertisements
Similar presentations
High Level Trigger (HLT) for ALICE Bergen Frankfurt Heidelberg Oslo.
Advertisements

L2 chains for single-beam menu Muon full reconstruction T2Calo starting from MBTS Ricardo Gonçalo, Denis Damazio.
Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014.
H/Abb -> 4b’s process & Multi-Et-Threshold Study for 4jet Trigger Kohei Yorita Young-Kee Kim University of the FTK Meeting on July 13 th, 2006.
Jet Trigger Planning R.Goncalo (LIP), D.Miller (Chicago) Jet Trigger Meeting, 22 Sep.2014.
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Daniele Benedetti CMS and University of Perugia Chicago 07/02/2004 High Level Trigger for the ttH channel in fully hadronic decay at LHC with the CMS detector.
July 7, 2008SLAC Annual Program ReviewPage 1 High-level Trigger Algorithm Development Ignacio Aracena for the SLAC ATLAS group.
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
Developments with the Cone Algorithm in Run II John Krane Iowa State University MC Workshop Oct , Fermilab Part I: Data vs MC, interpreted as physics.
Real Time 2010Monika Wielers (RAL)1 ATLAS e/  /  /jet/E T miss High Level Trigger Algorithms Performance with first LHC collisions Monika Wielers (RAL)
1 N. Davidson Calibration with low energy single pions Tau Working Group Meeting 23 rd July 2007.
Dijet Mass Sherpa vs Pythia Multi-Threshold e.t.c. for H/Abb->4b’s Kohei Yorita University of Chicago FTK Meeting 12/19/2006.
Alexander Khanov 25 April 2003 DIS’03, St.Petersburg 1 Recent B Physics results from DØ The B Physics program in D Ø Run II Current analyses – First results.
Energy Flow and Jet Calibration Mark Hodgkinson Artemis Meeting 27 September 2007 Contains work by R.Duxfield,P.Hodgson, M.Hodgkinson,D.Tovey.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
H → ZZ →  A promising new channel for high Higgs mass Sara Bolognesi – Torino INFN and University Higgs meeting 23 Sept – CMS Week.
Trigger validation for Event size TrigDecision Jets Electrons Ricardo Gonçalo, RHUL Physics Validation Meeting – 9 October 2007.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 28 th August, 2007 Outline: Introduction & release plans Progress in menus for cm -2 s -1 Workshop on trigger.
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
Trigger Offline DQ Monitoring DQ Meeting – 27 Oct 2009 Ricardo Goncalo for Trigger Offline Monitoring.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
Jet Trigger On-Call Shift Summary Ricardo Gonçalo - LIP.
ATLAS ATLAS Week: 25/Feb to 1/Mar 2002 B-Physics Trigger Working Group Status Report
DPDs and Trigger Plans for Derived Physics Data Follow up and trigger specific issues Ricardo Gonçalo and Fabrizio Salvatore RHUL.
IOP HEPP: Beauty Physics in the UK, 12/11/08Julie Kirk1 B-triggers at ATLAS Julie Kirk Rutherford Appleton Laboratory Introduction – B physics at LHC –
Jet trigger news R.Gonçalo (LIP) D.Miller (Chicago) Jet trigger meeting 11 August 2014.
CaloTopoCluster Based Energy Flow and the Local Hadron Calibration Mark Hodgkinson June 2009 Hadronic Calibration Workshop.
Questions to Signature & Performance Groups Possibilities for tightening/adding selection cuts: comparison of online and offline selection cuts: – cuts.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
PESAsim – the e/  analysis framework Validation of the framework First look at a trigger menu combining several signatures Short-term plans Mark Sutton.
Trigger Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) on behalf of trigger community Physics Validation Meeting – Feb. 13, 2007.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
first results from EMCal test beam
Current Analysis Activity/Results (Only brief overview) Sunil Bansal (Panjab University, Chandigarh) Approved results marked.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015.
New Trigger Strategies Discussion Perimeter Institute HL-LHC Workshop June 8, 2015 Eva Halkiadakis, Matt Strassler, Gordon Watts.
Hggs-D meeting MPI 11/20061 Higgs Physics – Activities in Bonn/Siegen Jörn Große-Knetter ATLAS-Higgs-D Treffen München,
October 2011 David Toback, Texas A&M University Research Topics Seminar1 David Toback Texas A&M University For the CDF Collaboration CIPANP, June 2012.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
Update on Diffractive Dijets Hardeep Bansil University of Birmingham 12/07/2013.
Performance of the ATLAS Trigger with Proton Collisions at the LHC John Baines (RAL) for the ATLAS Collaboration 1.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
10 January 2008Neil Collins - University of Birmingham 1 Tau Trigger Performance Neil Collins ATLAS UK Physics Meeting Thursday 10 th January 2008.
LAV efficiency studies with photons T. Spadaro* *Frascati National Laboratory of INFN.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
Electron and Photon HLT alley M. Witek K. Senderowska, A. Żurański.
 reconstruction and identification in CMS A.Nikitenko, Imperial College. LHC Days in Split 1.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
The ATLAS Liquid Argon Calorimeter: Overview and Performance Huaqiao ZHANG (CPPM) On behalf of the ATLAS Liquid Argon Calorimeter Group.
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
Latest News & Other Issues
Monitoring of L1Calo EM Efficiencies
Jet Energy Scale and Calibration Framework
The Level-2 calorimeter status SLAC ATLAS Forum May
Performance of jets algorithms in ATLAS
on behalf of ATLAS LAr Endcap Group
Effect of t42 algorithm on jets
Short Overview on calibration
First look at data/MC comparison for period 8 reference runs
Introduction The aim of this talk is to try to get a feeling on the expected degradation of performance of a calibration once we move from MonteCarlo.
ILD Optimisation: towards 2012 University of Cambridge
Julie Kirk Rutherford Appleton Laboratory
Presentation transcript:

Jet Slice – use of TopoClusters Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 20 August 2014

Use of TopoClusters TopoClusters: – Essential to have performance close to offline – Good resolution wrt offline paramount to control rates Additionally: – TriggerTower full scan (L1.5) – Runs Anti-kT jet reco on 0.1x0.1 TriggerTowers – Avoids bias from close-by jets – Current plan is to run L1.5 to seed HLT reconstruction Could not test with L1.5 yet – But see Run I cost and performance in next slide 20/08/14TopoClusters in Jets - TGM 20/8/20142 L1.5

L1.5 cost From Run I tests ( see ATL-COM-DAQ ):ATL-COM-DAQ – L1Calo ROSes (3 for TT, 1 for JE) read out at up to 7kHz – Expect up to 15kHz with upgraded ROSes Total time around 12ms – Readout time around 9ms – Jet finding (anti-kT 0.4) around 1-2ms 20/08/14TopoClusters in Jets - TGM 20/8/20143

L1.5 performance The TriggerTower full scan recovers L1 inefficiency for close-by jets – See ATL-COM-DAQ ATL-COM-DAQ Reasonable spacial resolution Energy resolution same as L1 – See ATL-COM-DAQ ATL-COM-DAQ /08/14TopoClusters in Jets - TGM 20/8/20144

TopoCluster making and Partial vs Full Scan L1.5 code not working at present: partial results only – Partial scan seeded directly by L1 for now Latest numbers comparing partial scan vs full-scan of calorimeter cells, both using TopoClusters – Full-scan should have performance close to offline – Again, this is essential – cannot show direct comparisons now, but studies are ongoing Details: – MC sample: mc12 14TeV JZ2W: akT0.6 (truth); E T = GeV; = 80 – L1_J20 seed shown here L1_J50 also studied – Opening sRoI’s of 1x1 or 1.5x1.5 around L1 RoIs, 0.8x0.8 also studied 20/08/14TopoClusters in Jets - TGM 20/8/20145

TopoCluster performance Comparing PS to FS Assumes FS performance is closer to offline 20/08/14TopoClusters in Jets - TGM 20/8/20146 Ademar Delgado E T of 3 rd jet in 3j50 sRoI size 1x1 Events have David Freeborn (E T PS - E T FS )/E T FS versus η FS

TopoCluster making cost 20/08/14TopoClusters in Jets - TGM 20/8/20147 Ademar Delgado FS: ≈260ms PS: ≈28ms – L1_J20 1x1 sRoI PS: ≈45ms – L1_J20 1.5x1.5 sRoI FS: ≈10ms PS: ≈6ms – L1_J20 1x1 sRoI PS: ≈10ms – L1_J20 1.5x1.5 sRoI

Conclusions… so far TopoClusters essential for the jet trigger – The cost is high, but we believe the gains will be measured in physics – PS, L1.5, and the menu provide tunable parameters to minimize impact of processing time To-do (many things…): – Direct comparison with offline jets – Study performance of different calibration methods – both time and energy/position important – Using L1.5 to seed TopoCluster and jet finding – Optimisation of PS parameters: sRoI size, L1 seed – although reasonable values are now clear – Establishing menu after/in parallel with reconstruction options – Development: fixing some geometrical effects coming from RegionSelector, etc 20/08/14TopoClusters in Jets - TGM 20/8/20148

Backup 20/08/14TopoClusters in Jets - TGM 20/8/20149

Additional costs: Jet Calibration 20/08/14TopoClusters in Jets - TGM 20/8/ Signature coordination meeting – 20 Mar 14:

20/08/14TopoClusters in Jets - TGM 20/8/201411