Black Belt LTLT LTLT Scientific Procurement Black Belt Finance HR Site Head LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT Executive Office.

Slides:



Advertisements
Similar presentations
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

St. Andrews School A tour of St. Andrews. This is the Nursery This is the Nursery and it is behind Walmsley House. Children start in Nursery at 3 and.
31 st August 2007 PROPOSED ADDITIONAL & ALTERATION WORK FOR NEW TRACTOR ROAD,SINGAPORE FOR M/S QIOPTIQ SINGAPORE PTE LTD 31 st AUGUST 2007 PROPOSED.
Eastchester Union Free School District Pre-Bond Planning Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools.
366,84 m2 114,09 m2 220,84 m262,34 m2 Renaissance Premium have 2 underground parking floors which let 66 cars to park safely. 1 st Floor Bank Cafe Renaissance.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
5S CLÍNICA MÉDICA (MH) 306 A. 5S CLÍNICA MÉDICA (MH) 306 B.
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
Updated Head of Mission Deputy HoM Executive Officer Personal Assistant to HoM/DHoM Chief of Security Section Security Officers Head of OPS.
Head of Mission 1 1 Deputy HoM Financial Controller
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Map of UAA Recycle Bins We have developed a detailed map of every communal mixed paper recycle bin in each building at UAA. * There are several plastic.
ADDITION & REMODEL Eugene Field Elementary School.
Office Space Update (the saga continues) R. Voss - ATLAS Muon IB 25/02/2004.
Organizational Chart – Management Team Chief Operating Officer Sales/Mktg Manager Operations Manager Quality Manager Technology Manager Finance Manager.
HKUST IELM 1010/ Seminar Career Talk by MTMAA Simon Law Catherine Chow Clarence Leung Amy Chen CM Wong Sep 17, 2014.
ISS-AliEn and ISS-gLite Adrian Sevcenco RO-LCG 2011 WORKSHOP Applications of Grid Technology and High Performance Computing in Advanced Research.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
Site Plan Site Plan Overall Plan Old School Bldg. Classroom Bldg.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
Admin Building Room. Mailroom Printing room Estates storage Estate office Drivers’ LAB EHS Store Room Photocopy Resources Room Estates Office Staff lounge.
2 nd phase I.Classrooms, toilets, dinning hall, computer rooms and library for the primary students II.Expansion of the high school library and relocate.
Following 3 places are opened for visitors: 1)Nextef (New X-band Test Facility); 2)Untra-precise Machining Laboratory Clean room; 3)High Precision Measuring.
A Great Place to Study, Live, Teach, Work. Current UAA Churn Schedule –2007/08 GOAL 1: Provide Space in 3 rd Floor SSB for Joint PhD program—Capital Funded.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
© The Concept Factory © Science Link | 2© Science Link 2013  Three calls during Results:  66 applications, companies from 8 countries.
10Canteen Conference Center 9Medical/Surgical Unit ICU Stroke/Rehabilitation 4Central Sterile Processing Administration Lab 3Surgery CVICU Surgery.
CTC facilities App Lab Exhibition Space 3Sixty and control room CETLE Room Meeting room Interior office.
Organisation Redesign Current and finalised structures Pre Business Model Review 7 th October 2013 Key NHS LA post New post NCAS post Disestablished post.
Emergency Actions Emergency Actions are composed of two actions. 1) Tornado & Severe Weather 2) Emergency Evacuation.
ERDF for Education and Science th March 2011.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Lane Center for Academic Sciences Update
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Hotel Organization.
Welcome to the St. George Manor Renovations…..
Flu Shots are Coming! Flu shots are FREE For
Deputy Director of Finance – Income, Contracting and Commercial
Executive Structure – 1 September 2012
US ARMY GARRISON FORT MEADE 5-DAY IN-PROCESSING.
Map of UAA Recycle Bins We have developed a detailed map of every communal mixed paper recycle bin in each building at UAA. * There are several plastic.
E A S T S O U T H L E S L A N D FIN A R C EXP D E V C R OPS L E G M S
PROCUREMENT Deputy Director of Finance –
PROCUREMENT Deputy Director of Finance –
Computer Science in the Early Years
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Phone Number BINGO!!!.
SPECIAL VALUATION 835 n POST STREET spokane-continental bakery building Commercial.
28/01/14 Chief Executive Executive Assistant Head of eSolutions
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
Special Valuation 1017 W First Avenue Odd fellows Hall/Montvale Event Center Commercial.
Special Valuation Montvale Hotel 1005 W. 1st Avenue
HISD Educational Learning Center
Scenario 1 CP Fire Room Ignition Team CP Attack Team Entry
“The Benefits of Having a Plan”
Any Semester Student (2-5) Clinical Orientation
Special Valuation 1017 W First Avenue Oddfellows Hall/Montvale Event Center Commercial.
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
Around the room Orders of operations.
Landmark Medical Center
Mrs. Connell Room 262 3rd Grade
Chief Operating Officer
Special Valuation Washington Cracker Co. 304 W. Pacific Avenue
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
King City 1st level 2nd level Block Plan Diagram
The Valley Foundation School of Nursing San José State University
The Valley Foundation School of Nursing San José State University
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
Presentation transcript:

Black Belt LTLT LTLT Scientific Procurement Black Belt Finance HR Site Head LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT LTLT Executive Office Admin Helpdesk -HR 5 th Office Floor

Spare Clinical Science Ops Planning Q&C TC Room Spare Facilities Facilitiescv 4 th Office Floor Q&C

3rd Office Floor Spare PD IT IT - CED IT - HelpDesk

2nd Office Floor PCT Spare PCT Spare PCT

1st Office Floor Switchboard COMMERCIAL Spa re COMMERCIAL UNION - MEETING ROOM EHS MEDICAL CENTER Visitors - Room

5 TH Lab Floor Spare API LEAD OPTIMIZATION Lead Opt

4 TH Lab Floor AS PCT SPARE AS PCT SPARE AS

3rd Lab Floor AS PD PD – TF1 PD PDPD PDPD Spare PD

2nd Lab Floor PCT SPARE PCT PCTPCT PCTPCT PCTPCT PCTPCT PCTPCT PCTPCT PCTPCT PCTPCT ARAD PCT

1st Lab Floor PCT PCTPCT PCTPCT PCTPCT PCTPCT PCTPCT PCTPCT PCTPCT PCTPCT Spare

2nd CD Floor API (Office) API – office API- office API Spare

1st CD Floor API-office Spare API- offic e

1st Basement CD Floor AS-office AS API AS-office API API-office

PCT PCTPCT PCTPCT Spare 2nd Basement S Bldg