Estimating Available Capacity for New Generators Jonathan Rose Planning Engineer, Resource Integration Dept. Regional Planning Group September 24, 2013.

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

Software Analysis Tools
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Regional Planning Group Project
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
CSC/CRE Technical Review 6 October Outline  Review the process used in calculating Power Transfer Distribution Factors (PTDFs).  Information.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
System Strength Discussion
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
DC Tie Reservation and Scheduling with Mexico Shams Siddiqi representing Sharyland Utilities WMS Meeting May 15, 2007.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
PERT Chart Expert by Critical Tools Greater Cincinnati MPUG Chapter September 26, 2002 Presented by Chas Eddingfield GCMPUG Technology Chair - MSP Support.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
Announcements Please read Chapter 3; start on Chapter 6
Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
02/13/2009 RPG Wind Interconnection Survey Dan Woodfin Director, System Planning.
HARRISON UK Author Session 4 – Block 4 – Question 9 Barcelona May Optimal Accommodation of DG Dr Gareth Harrison Dr Robin Wallace University.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ERCOT Independent Review
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Jeff Billo Manager, Transmission Planning
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity System Strength/Short Circuit Current Minimum Requirement June 5,
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
1 PSSE Playback Model Validation with PMU Data Damien Sommer, P.E. Senior Transmission Planning Engineer.
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
EDS 2 Early Delivery Systems Approach March 2007.
Houston Import Study Update
Nacogdoches to Lufkin SS 345 kV Line Project
CSC DETERMINATION PROCESS
Transmission Planning in ERCOT- Overview
I-5 Corridor Reinforcement Project
بعض النقاط التي تؤخذ في الحسبان عند تقييم الاستثمارات الزراعية
ECEN 460 Power System Operation and Control
The Network Model Management System
Feature Coding 3rd Workshop on Common GIS Reporting for WISE
Software Analysis Tools
Presentation transcript:

Estimating Available Capacity for New Generators Jonathan Rose Planning Engineer, Resource Integration Dept. Regional Planning Group September 24, 2013

2 Goal: Provide Better Information for Generation Developers ERCOT Resource Integration Dept.

“Available Capacity” Tool – RPG – 9/24/ Providing a Tool for Prospective Generation Developers Generation Interconnection Process Observations Many generation developers unfamiliar with transmission network. –Buy maps from 3 rd party vendors. Do not know the rating (or voltage) of lines. –Often request a screening study in an obviously under-sized transmission location. –Sometimes request “investigative” screening studies just to understand transmission.

“Available Capacity” Tool – RPG – 9/24/ Program written by Jonathan Rose. Performs a “pseudo” screening study at every bus in ERCOT system. Estimates transmission capacity available for new generators. Results are tabulated by bus. Envision making results public. Introducing: Available Capacity Program

“Available Capacity” Tool – RPG – 9/24/ Report will be published with many disclaimers: –Analysis less comprehensive than an ERCOT Screening Study. –Analysis performed in Steady State only. –Errors may exist. SPSs and RAPs were not modeled. –Use at your own risk. –Recommend use only as informal guidance. Disclaimers…

“Available Capacity” Tool – RPG – 9/24/ Sample Map – 345 kV Network Available Transmission Capacity in North Texas Sample

“Available Capacity” Tool – RPG – 9/24/ Sample Tabular Results Available Capacity Shown for New Generators

“Available Capacity” Tool – RPG – 9/24/ For each bus… How Results Calculated Add prospective generator at bus. Perform FCITC Transfer Analysis Scale up prospective unit. Scale down faraway gas generation. Perform FCITC Transfer Analysis Scale up prospective unit. Scale down faraway gas generation. Scale up nearby generators. Calculate and save constraints.

“Available Capacity” Tool – RPG – 9/24/ How Does it Work? Python Code MS Access Database TARA PSS/E

“Available Capacity” Tool – RPG – 9/24/ Planning analysis tool similar to MUST. –Used by ERCOT Planning & Res. Integration. Can perform security-constrained economic dispatch. Good for reporting sensitivities & shift factors. What is TARA? (Since people may not be familiar…)

“Available Capacity” Tool – RPG – 9/24/ QUESTIONS?