4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
RPC project chart Pigi Paolucci. RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level.
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
DATA TAKING – TESTS OF ABSORPTION LENGTH MEASUREMENTS IN ANTARES MC (group meeting) HAROLD YEPES-RAMIREZ IFIC, 22/10/10 1.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
MuonDPG/RPC M. Maggi INFN Bari. DQM tool for the DCS data Control Analysis Tool (CAT) by Cimmino, Lomidze, Paolucci, Polese To 1.Make custom DCS data.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
RPC Readiness for Data-taking RPC Collaboration 1.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
Run Coordination Report 4th RPC General Meeting (CMS week) Luigi BENUSSI, Hassan SHAHZAD, Nicolas ZAGANIDIS.
Tracking Task Force Predrag Buncic Offline Week, 19 March 2014.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
DQM status report Y. Foka (GSI) Offline week from pp to PbPb.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Status of Digitization, Testbeam Simulation, and Production ATLAS Muon Week -CERN, February 18th 2005 Daniela Rebuzzi – Pavia University and INFN.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
ST software status, Jeroen van Tilburg
P. Paolucci G. Pugliese M.Tytgat
RPC Data Certification
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
CMS RPC Endcap RE1 Status Report
DQM for the RPC subdetector
Presentation transcript:

4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status

RPC General Meeting (CMS week) 28/06/11 4th RPC General Meeting - Pigi Paolucci 2 GM organization: 1. Introduction (Pigi) 2. TC session (Salvatore) 3. RC session (Nicolas) 4. DPG session (Davide) 5. Upgrade session (Pino) To give an overview to the collaboration To focus our attention on “critical issues” To underline priorities and manpower requests To present interesting results 2-3 specific talks will be proposed by coordinators.

28/06/11 4th RPC General Meeting - Pigi Paolucci 3 Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis DPG D. Piccolo K. Bunkowski C. Carillo DPG D. Piccolo K. Bunkowski C. Carillo Upgrade G. Iaselli A.Sharma S. Buontempo Upgrade G. Iaselli A.Sharma S. Buontempo Institution Board L. Litov Resource manager A. Colaleo Steering committee W. Van Doninck, M. Maggi H. Hoorani, A. Colaleo, A. Sharma (PM+DPM+RC+TC+DPG) Conference Committee S. Park, B. Pavlov Conference Committee S. Park, B. Pavlov Editorial board S. Qian, M. Abbrescia S. Bianco Editorial board S. Qian, M. Abbrescia S. Bianco Tech. Coordination S. Buontempo A. Dimitrov Tech. Coordination S. Buontempo A. Dimitrov RPC organization chart

Main goals – /06/11 4th RPC General Meeting - Pigi Paolucci 4 In priority order 1. High efficiency of the RPC data takingTC/RC 2. Assure an high quality of the dataDPG/RC 3. Clear set of results (performance and studies)DPG 4. Build the RE4 upgrade systemTC/Up 5. Enlarge the collaborationMB/IB 6. Manpower balance & budget consolidationMB/IB but this is not enough for us and we have to do more and more to improve our project….(see next slide)

More goals…… 28/06/11 4th RPC General Meeting - Pigi Paolucci 5 Main performance results: HV scan results (approved by CMS) Background (approved by CMS) System stability monitor (on-going) Study and underline all the aspects in which the RPC could play a central role in CMS: RPC use in present Muon Reco (Hyunkwan Seo) Alternative reconstruction algorithms (Min Suk Kim) Trigger studies (Warsaw and Filip)

28/06/11 4th RPC General Meeting - Pigi Paolucci 6 8 mbar 11 mbar

28/06/11 4th RPC General Meeting - Pigi Paolucci 7 Wheel/Disk.vs. Time

28/06/11 4th RPC General Meeting - Pigi Paolucci 8 Beam haloMu 3 Mu 25 Mu 10 Trigger Trigger rate.vs. Lumi (fitted) WBM tool RPC Background and current study should provides Similar Results

28/06/11 4th RPC General Meeting - Pigi Paolucci 9

28/06/11 4th RPC General Meeting - Pigi Paolucci 10

28/06/11 4th RPC General Meeting - Pigi Paolucci 11 Beam intensity Current

28/06/11 4th RPC General Meeting - Pigi Paolucci 12

28/06/11 4th RPC General Meeting - Pigi Paolucci 13 Not corrected with pressure Background position ?

News to underline 28/06/11 4th RPC General Meeting - Pigi Paolucci 14 Detector is running smoothly P5 and CAF crews are working very well Instruction have been improved a lot – Anna Cimmino, experts and shifters Shift reports at RC/DPG meeting OK HV P correction – ready to be tested at TS (central DCS team) # of DQM plots to be reduced in few weeks (Task forces with Anna, Anna, Alaa & Cesare) 2011 results: many approved in June Background studies: 2010 and 2011 comparison PVT: noise and DQM stored in database – ready to be used (WBM too) Simulation: improved with 2010 efficiency table Construction DB: improvements thanks to Anton and Daniela Upgrade: HLP production has been defined Gap production MoU is almost ready

What we have to improve 28/06/11 4th RPC General Meeting - Pigi Paolucci 15 Communication between TC-RC-DPG Participating to the main meetings Use the hyper-news more and more Following the official path for any new request Communication between MB and 80 colleagues People should participate to the meeting (only to the RPC RC/DPG meeting) Improve the communication between present project and upgrade Results in a public web page Put all the approved and not approved results in a common web page Improve DQM performance (reducing memory usage)

News about RPC organization 28/06/11 4th RPC General Meeting - Pigi Paolucci 16 RPC MB, coordinators and experts have access to a shared google documents used to prepare the weekly report to the XEB meeting: Very good way to share info ! June 14th: TC: Everything was perfectly stable before the gas kill on 31th May. Then after a power-cut in SG5 and a gas kill we had 5 trips in the barrel and 1 in the endcap. All have been recovered. One chamber temporarily in SG mode till next access. Trigger: Muon Trigger rate variations observed (~9%) in last weeks, the most probable reason is variation of the RPC chamber efficiency (by 2-3%) with the pressure variation (impacting the trigger efficiency in the endcaps by 3-4%, and thus the rate). Still not clear is the variation of the cluster size could impact the probability of promoting the low pt muons to high pt (impacting the rate on given threshold). Variation is not present with low PT cut (Mu0 and Mu7) and increase from Mu16 to Mu20 RC: stable since the HV scan - no problem with the new set of WP and efficiency very stable in time (2-3% of variation due to the pressure) P/T correction in PVSS has been discussed and defined and will be tested during the next TS DPG:DQM: experts are investigating in the offline DQM to speed-up it. Right now we are using 4MB and we already deleted histograms. Work is on going. MC: Comparison of number of RPC hits in Muon Reco of 2011 data with summer2011 MC, show nice agreement in barrel and endcap. Some small discrepancy in overlap region under study Upgrade: MB:

News about RPC organization 28/06/11 4th RPC General Meeting - Pigi Paolucci 17 Shared google calendar with meetings and vacation (Pigi and Gabriella) please ask to be included in the list Minutes provided by all the coordinators – thanks a lot XEB and XEC minutes circulates in real time MB and FB minutes and news in a week All info sent to Group Leader (we ask to circulate)

Action Items 28/06/11 4th RPC General Meeting - Pigi Paolucci HV setting with P/T correction – approved by CMS but in a human version 2. Improve history plots monitoring (current, noise, efficiency) using WBM and database 3. Include DQM trigger check in CAF duties 4. Spare components procurement 5. Long 2012shut-down plan 6. Bakelite and gap production 7. Link and Control board prototype tests at 904 (Oct-Dec)

2011 Agenda 28/06/11 4th RPC General Meeting - Pigi Paolucci 19 General Meeting:Thursday at 9:30(1 per month) DPG/RC:Thursday at 9:30(3 per month) Tech coordination:Monday at 9:00(weekly) Upgrade: Tuesday at 9:00(weekly) Management:Wed at 10:00(weekly) restricted ISR meeting:Monday 14:00(weekly) technical 904 meeting:Wed 10:00(weekly) technical GEM meeting: Tuesday 14:00(weekly) technical Upgrade RE4 Workshopto be decided Upgrade High Eta Workshopto be decided Let me ask the 4 coordinators and deputies to actively participate to the 3 weekly meetings. Unique project

Conclusions 28/06/11 4th RPC General Meeting - Pigi Paolucci 20 RPC system is running smoothly Many many nice 2011 results approved by CSM WBM is now used at CAF (noise to be included) PVT ready to use DQM and noise data Bakelite production ready to start Gap production MoU ready in few weeks

RPC “social” dinner tonight at 20:00 28/06/11 4th RPC General Meeting - Pigi Paolucci 21 Café dell’aviation Airport – vernier Right now we are 14 only but we have a reservation for 30 !!!