LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011.

Slides:



Advertisements
Similar presentations
Paul Emma SLAC January 14, 2002 BERLIN CSR Benchmark Test-Case Results CSR Workshop.
Advertisements

Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
ILC Accelerator School Kyungpook National University
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
Bunch compressor design for eRHIC Yichao Jing and Vladimir Litvinenko FLS2012, Newport News, VA 3/8/2012.
CALCULATIONS OF THE LCLS INJECTOR USING ASTRA Jean-Paul Carneiro DESY Hamburg ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations.
1 Enhancements to the Linac Coherent Light Source.
P. Emma LCLS FAC 12 Oct Comments from LCLS FAC Meeting (April 2004): J. Roßbach:“How do you detect weak FEL power when the.
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Juhao Wu LCLS FAC 7 Apr Dark Current, Beam Loss, and Collimation in the LCLS J. Wu, D. Dowell, P. Emma, C. Limborg, J. Schmerge,
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Accelerator Issues and Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
New 135-MeV injector energy requires minor changes to linac operating point…
C.Limborg-Deprey Beam Dynamics Justifying L01 November 3 rd 2004 Beam Dynamics Justifications of modification of.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project Near term opportunities for LCLS 'upgrades' J. Hastings for the LCLS Experimental.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
M. Venturini, Sept. 26, 2013, SLAC 1 ─ M. Venturini, Sept. 26, 2013, SLAC Marco Venturini LBNL Sept. 26, 2013 THE LATE NGLS: OVERVIEW OF LINAC DESIGN,
Low Emittance RF Gun Developments for PAL-XFEL
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
LCLS-II Magnet Error Sensitivities. Sensitivities of dipole magnets, from injector output (95 MeV) to SXR undulator input (4 GeV), where each plotted.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
Two Longitudinal Space Charge Amplifiers and a Poisson Solver for Periodic Micro Structures Longitudinal Space Charge Amplifier 1: Longitudinal Space Charge.
Paul Emma Stanford Linear Accelerator Center July 2, 2002 Paul Emma Stanford Linear Accelerator Center July 2, 2002 High Brightness Electron Beam Magnetic.
Simulation of Microbunching Instability in LCLS with Laser-Heater Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
J. Wu J. Wu working with T.O. Raubenheimer, J. Qiang (LBL), LCLS-II Accelerator Physics meeting April 11, 2012 Study on the BC1 Energy Set Point LCLS-II.
Beam Stay-Clear (BSC) Apertures in LCLS-II June 24, 2015 P. Emma Take up work Jim Welch started (LCLSII-TN-14-15, Jan. 23, 2015) Goal is to define stay-clear.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Post-LH Diagnostic Line for LCLS-II P. Emma, M. Woodley, Y. Nosochkov, Feb. 26, 2014 Steal beam at Hz with y -kicker after LH (  y = 15 mm) Bend.
PAC-2001, Chicago, IL Paul Emma SLAC SLAC Issues and R&D Critical to the LCLS UCLA LLNL.
J. Wu J. Wu working with T.O. Raubenheimer LCLS-II Accelerator Physics meeting May 09, 2012 Study on the BC1 Energy Set Point LCLS-II Accel. Phys., J.
Preliminary Tracking Results through LCLS-II P. Emma et al., Oct. 23, 2013 Thanks to Mark Woodley and Yuri Nosochkov for MAD design work Use Christos Papadopoulos.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
Injector Requirements Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 1st, 2004 Cécile.
X-band Based FEL proposal
Emittance Growth in the SPPS Chicane P. Emma, P. Krejcik, C. O’Connell, M. Woodley; SLAC, H. Schlarb, F. Stulle; DESY.
LCLS-II will use sectors (2 nd kilometer of SLAC linac) + a bypass line FACET has already removed all RF from sector 20 LCLS-II will re-install RF.
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Status of the MAX IV Short Pulse Facility
LCLS2sc MAD files: Injector to Bypass Line
X-band FEL beam dynamics issues
LCLS-II Lattice 26FEB16: updates in the areas from bypass to dump
Alternate Lattice for LCLS-II LTU Y
Beam-Based Feedback in LCLS-II
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
Thermal emittance measurement Gun Spectrometer
CSR Benchmark Test-Case Results
LCLS Longitudinal Feedback and Stability Requirements
Simulation Calculations
Linac/BC1 Commissioning P
Design of Compression and Acceleration Systems Technical Challenges
LCLS Commissioning P. Emma, et al
LCLS Tracking Studies CSR micro-bunching in compressors
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Presentation transcript:

LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011

SLAC linac tunnelBTH & U-Hall Linac-0’ L  6 m Linac-1’ L  9 m  rf   20° Linac-2’ L  326 m  rf   32° Linac-3’ L  582 m  rf  0° BC1’ L  6.5 m R 56   46 mm BC2’ L  23 m R 56   29 mm DL1’ L  12 m R 56  6.3 mm undulators L  120 m 6 MeV  z  0.62 mm    0.05 % 135 MeV  z  0.62 mm    0.07 % 250 MeV  z  0.13 mm    1.1 % 4.2 GeV  z  7  m    0.43 % 13.5 GeV  z  7  m    0.01 % Linac-X’ L  0.6 m  rf   160  V 0   19 MV 11-3b14-4d 11-3b14-4d X X SXR 1-km bypass line 11-1 b,c,d 11-1 b,c,d...existing linac...existing linac 14-7b20-4d 14-7b20-4d LCLS-I keV 2-13 keV L0-a,b rf gun H XR keV LCLS-II Accelerator for 13.5 GeV, 120 Hz, 250 pC Jan. 12, 2011, 11:16 AM - PE

LCLS-II Layout (After Linac) LCLS-I LTUH LTUS LTU2 LTU1 LCLS-II  LINAC END muon plug wall

LCLS-II Layout (After Linac)

LCLS-II Optics in Elegant (250 pC, 13.5 GeV) BC1BC2 Bypass Line 2.4° bends HXR und. Thanks to Mark Woodley and Yuri Nosochkov

2E5 macro particles (250 pC) tracked through Parmela to 135 MeV. 1 st and 2 nd -order optics (dipoles, quads, soln’s) and sinusoidal RF. Longitudinal wakes of SLAC S-band RF structures. Resistive longitudinal wakes of 1240 meters of 2-inch diameter stainless steel beam pipe (sector 20-5 to exit of muon-plug wall). Resistive longitudinal wakes of 330 meters of inch diameter copper plated (?) LTU2 beam pipe. CSR in all bends (1D model in Elegant) - includes transients but ignores transverse beam size (typically not a big impact). ISR in all bends – small impact on slice E-spread and slice emittance. Laser heater adds 17 keV rms E-spread at 135 MeV. All components are error-free: perfect alignment & CSR-steering is removed. What’s Included in the Elegant Tracking?

LCLS-II Particle Distributions (in Longitudinal Phase Space) Output from Parmela at 135 MeV Output from Elegant at 14 GeV 35 A ~3 kA …with CSR 0.01% rms

CSR-Induced Emittance Growth Along BC2 (250 pC, 4.2 GeV) This calculation removes the linear correlations in x and x’ with energy in order to reveal only the irrecoverable CSR effect. The projected emittance after the BC2 without removing these linear correlation is 1.32  m  m 1.09  m 0.53  m  x  y Includes double-horn distribution of LCLS

CSR-Induced Slice Emittance Before and After BC2 (250 pC, 4.2 GeV) Slice Emittance Before BC2 Slice Emittance After BC2 Includes double-horn distribution of LCLS

CSR-Induced Emittance Growth Along LCLS-II Accelerator (13.5 GeV) BC1BC2 Bypass Dog-Leg LTU2 2.4-deg Bends might be fixed? Vertical Bends Includes double-horn distribution of LCLS

Emittance across LTU2 bend system (horizontal in black and vertical in blue), including the 2.4-deg bends and the LTUS SXR branch line optics (8 dipoles total). CSR-Induced Emittance Growth Along LTU2 & LTUS (13.5 GeV) 2.4° bendsLTUS DL-bends pulsed bend Includes double-horn distribution of LCLS

Resistive-Wall Longitudinal Wakefield of 1240-m of 2-inch SS Pipe (Existing Bypass Line) Bane, Sands

Resistive-Wall Longitudinal Wakefield of 1240-m of 2-inch SS Pipe (Existing Bypass Line) Before bypass linev After bypass line

Final Slice Emittances (x & y) - with CSR - Before Undulator (250 pC, 13.5 GeV)