SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND - 99.70 % OF TIME FREQUENCY IN NORMAL BAND - 99.70 % OF TIME FREQUENCY IN NORMAL BAND.

Slides:



Advertisements
Similar presentations
Line Efficiency     Percentage Month Today’s Date
Advertisements

Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
POWER GRID CORPORATION OF INDIA LTD
RELATIONSHIP BETWEEN COMPETATIVE POWER MARKETS AND GRID RELIABILITY PJM RTO EXPERIANCE vis – a – vis PRACTICES FOLLOWED IN INDIAN GRIDS and THE ROAD AHEAD.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Seasonal Climate Cycles Solar Radiation at the Earth’s Surface.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
Aug, 2005 THE US BLACKOUT AUGUST 14, Aug, 2005 NORTH AMERICAN GRID INTER-CONNECTS THE INDIAN GRID AT PRESENT IS ALSO SIMILAR WITH THE SOUTHERN REGION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
1 KADAMPARAI PUMP OPERATION GENERATOR MODE PUMP. 2 KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU) MONTHS *
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
ENERGY CONSERVATION IN SR - A CASE STUDY
Jan 2016 Solar Lunar Data.
REGIONAL GRIDS IN INDIA – QUICK FACTS
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Hon’ble Commission has issued Interim order dated 19/ directing :
KADAMPARAI PUMP OPERATION
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Average Monthly Temperature and Rainfall
ABT & Frequency.

2017 Jan Sun Mon Tue Wed Thu Fri Sat
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com

Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat
Electricity Cost and Use – FY 2016 and FY 2017

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Change Management E2E Roadmap
Presentation transcript:

SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID NORMAL VOLTAGES THROUGH OUT THE GRID NORMAL VOLTAGES THROUGH OUT THE GRID NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING SYSTEM STRENGTHENING SYSTEM STRENGTHENING SYSTEM STRENGTHENING GAZUWAKA POLE-II GAZUWAKA POLE-II GAZUWAKA-VIJAYAWADA CKT-II AND III GAZUWAKA-VIJAYAWADA CKT-II AND III HYDERABAD-KURNOOL-GOOTY-NELAMANGALA HYDERABAD-KURNOOL-GOOTY-NELAMANGALA MADURAI – TRIVENDRUM D/C LINE MADURAI – TRIVENDRUM D/C LINE KAIGA – NARENDRA LINE KAIGA – NARENDRA LINE SPECIAL PROTECTION SCHEME FOR TALCHER-KOLAR SPECIAL PROTECTION SCHEME FOR TALCHER-KOLAR SPECIAL PROTECTION SCHEME FOR TALCHER-KOLAR SPECIAL PROTECTION SCHEME FOR TALCHER-KOLAR SYSTEM CONTINGENCY AVERTED ON SYSTEM CONTINGENCY AVERTED ON 26 JAN BIPOLE TRIP 26 JAN BIPOLE TRIP 28 APRIL 2005 – BIPOLE TRIP 28 APRIL 2005 – BIPOLE TRIP 9 TH MAY 2005 – ONLY POLE IN SERVICE TRIPPED 9 TH MAY 2005 – ONLY POLE IN SERVICE TRIPPED LOSSES IN GRID REDUCED CONSIDERABLY LOSSES IN GRID REDUCED CONSIDERABLY LOSSES IN GRID REDUCED CONSIDERABLY LOSSES IN GRID REDUCED CONSIDERABLY IMPROVEMENT IN SYSTEM SECURITY AND RELIABILITY IMPROVEMENT IN SYSTEM SECURITY AND RELIABILITY IMPROVEMENT IN SYSTEM SECURITY AND RELIABILITY IMPROVEMENT IN SYSTEM SECURITY AND RELIABILITY PROFILE

SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREE GOVERNOR MODE OF OPERATION FREE GOVERNOR MODE OF OPERATION FREE GOVERNOR MODE OF OPERATION FREE GOVERNOR MODE OF OPERATION KADAMPARAI PUMP MODE OPERATION KADAMPARAI PUMP MODE OPERATION KADAMPARAI PUMP MODE OPERATION KADAMPARAI PUMP MODE OPERATION STEPPED-UP IR TRANSACTIONS STEPPED-UP IR TRANSACTIONS STEPPED-UP IR TRANSACTIONS STEPPED-UP IR TRANSACTIONS MERIT-ORDER DESPATCH :- IMPACT OF REAL TIME DATA MERIT-ORDER DESPATCH :- IMPACT OF REAL TIME DATA MERIT-ORDER DESPATCH :- IMPACT OF REAL TIME DATA MERIT-ORDER DESPATCH :- IMPACT OF REAL TIME DATA REMOTE CONTROL INTERFACE:- CONTROL OF TALCHER- KOLAR DC POWER FROM RLDC REMOTE CONTROL INTERFACE:- CONTROL OF TALCHER- KOLAR DC POWER FROM RLDC REMOTE CONTROL INTERFACE REMOTE CONTROL INTERFACE TRAINING ON ULDC FOR SR CONSTITUENTS TRAINING ON ULDC FOR SR CONSTITUENTS TRAINING ON ULDC FOR SR CONSTITUENTS TRAINING ON ULDC FOR SR CONSTITUENTS

< & < & < & Above MaxMinAvgFVI FREQUENCY DURATION CURVE , & NEXT

YEAR FREQUENCY (Hz)% OF TIME WHEN FREQUECY WAS BETWEEN AVERAG FVI MAXIMUMMINIMUMAVERAGE < 48.5 HZ 48.5 TO HZ 49.0 TO HZ 49.5 TO HZ 50.0 TO HZ > 50.5 HZ 00 – – – – FREQUENCY SPECTRUM OF SOUTHERN REGION FOR PAST FIVE YEARS BACK

VOLTAGE PROFILE OF SOUTHERN REGION FOR PAST FIVE YEARS YEAR RAMAGUNDAMHYDERABADCUDDAPHABANGALOREMADRASTRISSURNEYVELI II MAXMINMAXMINMAXMINMAXMINMAXMINMAXMINMAXMIN

SOUTHERN REGION LOSS * **2005** LOAD (MW) (MW)LOSS(MW)LOSS %LOAD LOSS(MW)LOSS %LOAD LOSS(MW)LOSS %LOAD LOSS(MW)LOSS % AP KARNATAKA KERALA TAMILNADU PONDICHERRY CENTRALGENERATING STATION STATION SOUTHERNREGION *Source : Report of System Studies conducted for Accessing Shunt Compensation requirement in Southern Region – March 2004 and March SREB,CEA ** Projected figures 0.5% REDUCTION MEANS 100 CR ANNUAL SAVINGS 0.5% REDUCTION MEANS 100 CR ANNUAL SAVINGS

NO DISTURBANCES DESPITE LOSING ENTIRE SUPER GENERATING PLANTS LIKE RAMAGUNDAM,VIJAYAWADA,KOTHAGUDEM, NORTH CHENNAI, SHARAVATHY,NAGJHARI ETC MAJOR AND MINOR DISTURBANCES SINCE 1994

TALCHER-KOLAR IMPORT OF 21224MUs FROM ER THROUGH TALCHER-KOLAR UPTO OCT - 05 YEAR ---> MONTHS TOTAL ENERGY (IN MU) MAX FLOW (IN MW) TOTAL ENERGY (IN MU) MAX FLOW (IN MW) TOTAL ENERGY (IN MU) MAX FLOW (IN MW) TOTAL ENERGY (IN MU) MAX FLOW (IN MW) JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL AVERAGE MAX FLOW

KADAMPARAI GENERATION/PUMP ENERGY FROM JAN GENERATOR MODE PUMP MODE GENERATOR MODE PUMP MODE GENERATOR MODE PUMP MODE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL

FREQ BASED DESPATCH: ULDC

ULDC TRAINING PROGRAMS SL NAME OF THE TRAINING FROMTOParticipants Man Days 1 CISCO ROUTER & NETWORKING XA-21 USER LEVEL RTNA WORKSHOP AIX OPERATING SYSTEM XA-21 USER LEVEL SYBASE DATABASE ADMIN XA-21 USER LEVEL NMS TRAINING TRAINING ON RTU IS BEING REQUESTED REPEATEDLY BY CONSTITUENTS. FACULTY FOR THE SAME IS BEING IDENTIFIED.

KOLAR RCI CONTROL