TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago County to USH $40,000$10,000 $50,0001,290 PE CTH J -- Little Wolf River Bridge--- $45,600$11,400 $57, PE CTH E -- Crystal River Bridge--- $160,000$40,000 $200,0002,820 PE CTH B -- STH 49 to Railroad3.62 $80,000$20,000 $100, R/W CTH I -- CTH Y and Paape Rd Intersections0.75$25, *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge *ADT Average Daily Traffic
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT C/P CTH B -- Euclid Avenue to Railroad0.84$30,262$1,045,120$231,018 $1,306,4002,350 C/P CTH T -- Collier Road to CTH N4.62$2,477,308 1,135 C/P CTH F -- Lincoln Street to City Limits0.26$400,000 $200,000 $600, B CTH C -- Bridge over Little Wolf River--- $542,260$135,570 $677, P CTH E -- Waushara County Line to Lind Center Road5.98$1,067,430$1,054,320 $2,121,7502,400 P CTH T -- CTH D to Collier Road3.09 $171,564$462,618 $634, *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge *ADT Average Daily Traffic
2014 Totals MILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST 19.92$4,000,000$3,138,864$910,606$200,000 $8,249, Goals PEOur goal is 5.0 miles miles RWOur goal is 5.0 miles miles COur goal is 5.0 miles miles POur goal is 17.0 miles miles *PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving
CTH “T” Collier Road to CTH “D” Construction & Paving Scheduled for CTH “J” Little Wolf River Bridge Preliminary Engineering Scheduled for 2014 CTH “C” Bridge over Little Wolf River Bridge Replacement Scheduled for 2014 CTH “B” STH 49 to Railroad Preliminary Engineering Scheduled for 2014 CTH “F” Lincoln St. to City Limits Construction & Paving Scheduled for 2014