10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.

Slides:



Advertisements
Similar presentations
FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
Advertisements

1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Collimation System for Beam Loss Localization with Slip Stacking Injection in the Fermilab Main Injector Bruce C. Brown Main Injector Department Accelerator.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
3/14/2007AD/Instrumentation Department Jim Zagel 1 MFW Update 3/14/07 Latest problems RFT Looses Phase Lock –Real 53 MHz connected to the RFT at MI-10.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
January Tevatron Lifetimes - P. Lebrun1 f On Tevatron Proton Lifetime at 150 December 3 Study vs Store data. Paul Lebrun Fermilab January-December.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Flying Wire Update Feb 4, TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
April Tevatron Lifetimes - P. Lebrun1 f On Tevatron Lifetimes, Beams, Luminosity & Spot size Paul Lebrun Fermilab April
F All Experimenters' Mtg - 27 Jan 03 Week in Review: 01/20/03 -01/26/03 Ron Moore – FNAL Found obstacle in AP-1 line Replacing corroded Tevatron dipole.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
PROBLEM 1 Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Recycler Flying Wires Martin Hu Recycler Department.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
Anatomy of Accelerators Marty Peters Summer 2006.
9/25/2006All experimenters meetingA. Jansson 1 Tevatron Ionization Profile Monitors Andreas Jansson.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
12/06/2006 MFW. 12/06/2006 P-Bar Injection 12/06/2006 MFW Latest problems stem from RFT Module loosing phase lock. Greg Vogel informs us that the “real.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Successful Beam-Beam Compensation with TEL1 Vsevolod Kamerdzhiev for Beam-Beam Compensation team.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
MFW and IPM Update Jim Zagel 5/14/ Vertical Broken Fork After mounting new filament we attempted to align it to parallel the central shaft and.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
AB/BI J. Koopman New WS design - Brain storm session 18/06/2007 1/16 New WS design - Brain storm session.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
Ion Profile Monitors _ 2017 Jim Zagel GSI - IPM17 Workshop
T980 STATUS AND CHANGES FOR
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Summary of experience with Tevatron synchrotron light diagnostics
LHC Emittance Measurements and Preservation
Jeffrey Eldred, Sasha Valishev
MEIC New Baseline: Luminosity Performance and Upgrade Path
Measurement of the beam (transverse) emittances
Presentation transcript:

10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005

10/5/2005 jrz2 Agenda History What are they? Where are they? What do they measure? Issues

10/5/2005 jrz3 Ancient History Flora-Gannon Early 80’s

10/5/2005 jrz4 The 91 Upgrade Proximity Sensors Broken Wire Monitor Eliminate Paint Can’s Dual Wire Fork in Tev

10/5/2005 jrz5 What Are they? Carbon Filament –Originally all 33um –now Tev 7um at E-11 P-Bar Tail –Soon 7um MI &Tev E-17

10/5/2005 jrz6 Rotary Motion Geometry

10/5/2005 jrz7 Rotary Motion Feedback Optical Encoder –Relative Position –Absolute Index Mark –Precision (2 arc-min.) Resolver –Absolute Position –Rad Hard –Ratio of Sign to Cosine –Precision (4-6 arc-min.)

10/5/2005 jrz8 Encoder Signals Phase A, B, and Index

10/5/2005 jrz9 Wire Mounting Clamped Carbon Pretension

10/5/2005 jrz10 Where Are They?

10/5/2005 jrz11 Main Injector Q102 HorizontalQ103 Vertical

10/5/2005 jrz12 Recycler 619 Vertical 620 Horizontal

10/5/2005 jrz13 Tevatron E-17 horizontal E-11 Horiz & Vert

10/5/2005 jrz14 P-Bar Source High Dispersion Low Dispersion Encoder Low Dispersion Resolver

10/5/2005 jrz15 P-Bar Source Schematic

10/5/2005 jrz16 Beam View of Pbar Wire High Dispersion vertical wires –Core on Left –Tail on Right

10/5/2005 jrz17 Multiple Configurations 5 wires in P-Bar 3 wires in Tev 2 wires in MI & RR

10/5/2005 jrz18 Block Diagram

10/5/2005 jrz19 Fly Spec Defines the measurement –Clock Event –Pattern –PMT Voltage –PMT Filter –Sequence

10/5/2005 jrz20 What Do they Measure? Profiles of Loss vs (angular) Position AND THAT’S ALL! Everything else is calculated Early 80’s Data Modern LabView Presentation

10/5/2005 jrz21 PMT Loss Monitor New –5380 PMT –Flip in filters 60% 90% –Designed byYuriy Pischalnikov

10/5/2005 jrz22 Raw Signals Smooth accelerate/decelerate with constant speed while taking data samples 2 passes through beam for each fly.

10/5/2005 jrz23 Raw Signals 2 Captures bunch by bunch Second batch injection in MI

10/5/2005 jrz24 Gate Timing Gates sample at 11.1 us on this fly.

10/5/2005 jrz25 What Do they Calculate? Sigma of a Gaussian –Using Levenberg- Marquardt nonlinear fit –With baseline Then using intensity, energy, and beta, they calculate emittance. Does very well for Gaussian beams

10/5/2005 jrz26 Issues Wire Heating –Hi intensity NiMI beam can burn up 33um wire Vacuum rotary feed through upgrade –Ferro Fluidic good for Torr –Working on magnetic replacement for Tev Emittance growth for multiple flies in storage rings Scraped beams are not Gaussian Update Older Computers

10/5/2005 jrz27 Wire Heating Tevatron flying wire temperature at 980 GeV and 1E13 particles vs. beam displacement (cm). MI flying wire temperature at 120 GeV and 2E13 protons vs. beam displacement (cm). The red line is the melting point of carbon. Source Martin Hu

10/5/2005 jrz28 Fits Recycler bunch 1, Store 4378, third transfer bunch 3, Store 4378, first transfer Source Martin Hu

10/5/2005 jrz29 Recent Pertinent Papers Emittance growth due to Tev Wires –Syphers, Eddy, September, 2004 Wire Heating Estimates –Martin Hu, June, 2005 Flying Wire Geometry –Coral Christensen, June 2005