Redd Dewatering Monitoring and Assessment on the Sacramento River.

Slides:



Advertisements
Similar presentations
Assessing effects of Columbia River Basin anadromous fish flow management on the aquatic ecology of the Henrys Fork watershed A Proposal By The Henrys.
Advertisements

LOWER YUBA RIVER ACCORD Monitoring and Evaluation Program Redd Surveys Casey Campos PSMFC.
Looking for Pieces of the Puzzle: LIFE HISTORY OF SPRING CHINOOK IN THE WILLAMETTE BASIN Kirk Schroeder Brian Cannon Luke Whitman Paul Olmsted Oregon Department.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
Line Efficiency     Percentage Month Today’s Date
Importance of Water Level Management to Kokanee and Bull Trout in Lake Pend Oreille.
Hydrology and Hydraulics. Reservoir Configuration.
California Department of Fish and Game Input to the CVPIA (b)(2) Decision Process Russell J. Bellmer Fisheries Branch California Department of Fish and.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
WATER.
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
13 Oct 2005 TRTAC Meeting. Overview of FSA/Districts Riverwide Program Elements from yr Report (derived from pgs. 3-53, 3-130, 5-1)
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Yellowtail Dam Modeling Results Brian Marotz Hydropower Mitigation Coordinator.
Are Kootenai River White Sturgeon Bad Parents or Have We Just Messed Up Their Habitat?
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Hydropeaking and minimum flow : the French approach. P. Baran CIS ECOSTAT - HYDROMORPHOLGY WORKSHOP 12th and 13th June Brussels Pôle Ecohydraulique.
Water Supply and Demand in the Okanagan and Similkameen River Basins Brian Guy, Ph.D., P.Geo. National Practice Leader, Environmental Science September.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources.
Drought Management Sheri Looper CVP Water Resource Specialist.
Lake Powell Operations CRFS Spring 2015 March 25, 2015.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
1 Upper Basin Snowpack as of 3/26/2014
Orkney Trout Cycle. Egg Spawning Trout lay their eggs in nests in river gravels, known a redds. The female builds the nest, usually between November and.
How a topographical map is made.
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
Jan 2016 Solar Lunar Data.
TROUT IN THE CLASSROOM.
Learning objectives To understand the water balance
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Average Monthly Temperature and Rainfall
2018 Safety Group 1 – 5 Year Program Timeline Guide
Albeni Falls Dam Operations
SAFETY IS TVA’S NUMBER ONE PRIORITY
Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Jan Sun Mon Tue Wed Thu Fri Sat


Electricity Cost and Use – FY 2016 and FY 2017
Safety Group Program Timeline
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Safety Group Program Timeline

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

Redd Dewatering Monitoring and Assessment on the Sacramento River

What is redd dewatering? Dewatering Monitoring and Assessment Conditions that cause redd dewatering?

What percentage of fall-run redds are being dewatered while eggs and fry are still in the gravel? Study Question

Red Bluff Redding Anderson Bend Keswick Dam 5 5 Los Molinos STUDY AREA Sacramento River Redding to Los Molinos About 70 miles of River 5

Eggs and Fry in Gravel - 60 to 90 days OctNovFebDecJan Fall-run Spawning Mar SACRAMENTO RIVER FALL-RUN SPAWNING LIFE HISTORY

Flow

COMPETING DEMANDS ON SHASTA LAKE WATER Water Supply Delivery/Storage Flood Management Fall-Run Spawning Winter-Run Cold Water Pool

30-Sep 30-Oct 30-Nov 30-Dec 30-Jan Keswick Reservoir Release Fall 2011 – Winter ,372 9,000 3,000 6,000 7,500 4,500 Eggs and Fry in Gravel - 60 to 90 days CFS

30-Sep 30-Oct 30-Nov 30-Dec 30-Jan Keswick Reservoir Release Fall 2009 – Winter ,250 9,000 3,000 6,000 7,500 4,500 Eggs and Fry in Gravel - 60 to 90 days CFS

30-Sep 30-Oct 30-Nov 30-Dec 30-Jan Keswick Reservoir Release Fall 2006 – Winter ,000 3,000 6,000 7,500 4,500 Eggs and Fry in Gravel - 60 to 90 days CFS

OctNovFebDecJan Fall-run Spawning Mar MONITORING AND ASSESSMENT Record when redd was created Mark and record accurate location of redd Ground/Boat Based redd survey

Eggs and Fry in Gravel - 60 to 90 days OctNovFebDecJanMar Record dewatered redds and state of dewatering Map dewatered spawning areas DURING LOW-FLOW PERIODS

Eggs and Fry in Gravel - 60 to 90 days OctNovFebDecJan Fall-run Spawning Mar DFG SURVEY Dewatered Redds

Area Subject to Dewatering Mapped 2009/2010

Fall-run Redds Mapped 2011/2012 Area Subject to Dewatering Mapped 2009/2010

Topographic Survey to Determine Stage/Discharge Relationship

What’s next?