Schedule Sub-Working group K. Foraz 27/03/2012. Aim & members Specify the schedule feature inside IMPACT – From preparation of worksites to closure –

Slides:



Advertisements
Similar presentations
Project Selection Overview By Tim Washington September 14 th, 2011.
Advertisements

Projmgmt-1/12 Depaul University Scheduling Tasks In MicroSoft Project Instructor: David A. Lash.
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Program Management Office Department of Innovation & Technology City of Boston Kickoff Meeting.
Chapter 3 Managing the Information Systems Project
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Project Management Summer Meeting Students’ Educational Needs Learning Meeting the Community Organizations’ Needs Progress Purdue University Greater.
Indistar® Flag to Re-Assess. Flag to Re-assess Flag to Re-assess is a feature that will tag… indicators initially assessed as fully implemented, indicators.
Winter 05 Project Schedule A Gantt Chart is a means of presenting the master schedule of activities for your project –Named for Henry L. Gantt ( ),
Development plan and quality plan for your Project
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Introduction to the Nevada SharePoint Site
DE Streaming Strategies. Downloaded Segments There are three common ways that you can use downloaded video segments: Standalone files: Just double-click.
ACT – Fourth months later… Prepared by: Martin Gastal Jim Cook 22/03/20111Jim Cook & Martin Gastal.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
Making a Game Linking Slides. To link slides: 1.Prepare your storyboard 2.Complete all slides 3.Link the slides.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
SOFTWARE PROJECT MGT. SESSION # 3– LAB MANUAL AMAN QUADRI
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Chapter 3 Managing the Information Systems Project
1 Microsoft Project 2003 Introduction. 2 Overview Microsoft Project is a specialized database that stores and presents thousands of pieces of data. Examples.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Team-Based Development ISYS321 Managing the Information Systems Project.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
MEF - Machines & Experimental Facilities Sub Working Group LOCATION Organisation du sub-WG Listing des différentes bases de données Définition d’un plan.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
LHC intervention scheduling with the Work Acceptance Tool
Chapter 3 Managing the Information Systems Project
Your Name or Team’s Member’s Names Current Date
ECE362 Principles of Design
CERN Construction Planning and Scheduling (LHC installation)
Chapter 3 Managing the Information Systems Project
Risk and Issue Exercise Tasks
Software project mgt. session # 3– lab manual.
Meeting Agenda Go over A.L. Play with apparatus
Chapter 3 Managing the Information Systems Project
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
MGMT 404 Education for Service-- tutorialrank.com
Chapter 3 Managing the Information Systems Project
Software project mgt. session # 3– lab manual.
[Project Name] Project Report
Time management Working on time management is important for all college students, regardless of where you are in your college career. It’s helpful.
[Project Name] Project Report
I love the sound they make as they fly by.
Modern Systems Analysis and Design Third Edition
University Template Sample Slides June 2017.
Project management concepts
Technical Communication
Chapter 3 Managing the Information Systems Project
Chapter 2 Managing the Information Systems Project
Preparing for the future …
Modern Systems Analysis and Design Third Edition
Key Features Advantages over PDF sharing Use Cases Clients
Presentation transcript:

Schedule Sub-Working group K. Foraz 27/03/2012

Aim & members Specify the schedule feature inside IMPACT – From preparation of worksites to closure – Including resources management, constraints Proposals schedules Linear schedule features Members: – K. Foraz, J. De Jonghe, C. Garino, D. Lafarge, J. Coupard, H. Gaillard, M. Jaekel + ???? Deadline: specification (beginning) of Summer

First ideas Available “schedule” information – Proposed, earliest start, latest end, proposed, schedule, access What do we want – Visualize the schedule Gantt Calendar (see Rui) View constraints for a specific area For a certain time window Do experiments need special views (see Martin) Colors – how to define colors (LHC we do by groups) – Filter For a group For an area For proposed activities as well – Edit schedule At the preparation phase – to make different proposals Accept proposed dates through a Gantt view ? Do we want to link tasks – then process when a predecessor is delayed Do we want to play with resources leveling I love to have the team planner and the activity planner

Slide From CMS Managing shutdowns and extended technical stops – Flow: Insert in short term Plan 22/03/2011Jim Cook & Martin Gastal4 WP declaration Insert in long term plan Risk Assessment ALARA Insert in short term plan VIC Work execution WP completion Link to day by day schedule Made available on ACT Main page Hyperlinks to ACT to be available shortly