STIS STATUS Charles Proffitt TIPs May 21, 2009. STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan.

Slides:



Advertisements
Similar presentations
1 ACS Status Update STScI TIPS Meeting 19-October-2006 Ken Sembach.
Advertisements

HOW A SILICON CHIP CAPTURES AN IMAGE
Frame transfer CCDs 1. Image area clocks Store area clocks Amplifier Serial clocks Image area Store area In the split frame CCD geometry, the charge in.
Post-SM4 Sensitivity Calibration of the STIS Echelle Modes Azalee Bostroem With help from: Ralph Bohlin, Alessandra Aloisi, Charles Proffitt, Kenneth Hart,
Chandra X-Ray Observatory CXC Paul Plucinsky CUC September Overall Status of the Instrument 2.Update on Controlling the FP Temperature ACIS Ops.
Super Fast Camera System Supervised by: Leonid Boudniak Performed by: Tokman Niv Levenbroun Guy.
CXC EPHIN Status and Alternatives Michael Juda. CXC EPHIN StatusPage 2 Outline 1.EPHIN description 2.Thermal issues 3.+27V rail anomaly and impacts 4.Operations.
Space Astronomy: The UV window to the Universe, El Escorial, May 2007, John Vallerga The current and future capabilities of MCP based UV detectors J. Vallerga,
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
LSU 10/09/2007System Design1 Project Management Unit #2.
Objective of the Lecture Describe a basic electric circuit, which may be drawn as a circuit schematic or constructed with actual components.
Objective: To test claims about inferences for proportions, under specific conditions.
Circuits 6-1.
1 TIPS 2011 May Persistence in the WFC3 IR detector Knox S. Long.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
TIPS presentation 19 July 2007Charles Proffitt COS-STIS TeamPage 1 STIS FUV MAMA Dark Current Charles Proffitt COS-STIS Team.
BATTERY DRAW TEST SC10 By Vance Bloom Objective Student will determine if an abnormal “Key OFF Battery Drain” is present.
Understanding Persistence: A 3D Trap Map of an H2RG Imaging Sensor
Circuits, Current and Voltage
20.3 Electric Circuits
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
Ground loops Why grounding is so important ?DefinitionGround loops :(Introduction)where ground loops affect ?Ground loops are created by :Solutions.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
Solar-B SOT/FPP 1 SOT April 2006Ted Tarbell FPP CCD Camera Performance Ted Tarbell 17-Apr-2006.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS: STIS Report Paul Goudfrooij 1.Unusual Target ACQ Failures: Update & Resolution 2.Calibration.
ACS STATUS Linda Smith (thanks to David Golimowski for providing the slides)
Observational Astrophysics I
March 2004 Charles A. DiMarzio, Northeastern University ECEG287 Optical Detection Course Notes Part 15: Introduction to Array Detectors Profs.
Torsten Böker TIPS May 2, 2002 NICMOS post-cooldown detector performance 1) SMOV status 2) Dark current 3) Quantum efficiency 4) “First light”, focus and.
Tracker meeting – July, 2006 TBS – TPSFE FM/FS tests Lucio Accardo, INFN Perugia.
Digital to Analog Converters (DAC) 1 Technician Series ©Paul Godin March 2015.
SS Space Science MO&DA Programs - August Page 1 ACE Instrument Status Report Cosmic Ray Isotope Spectrometer (CRIS) Normal Operation. Electron Proton.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
SuperNova / Acceleration Probe System Engineering Mike Roberto and Mike Amato November 16, 2001.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Electricity Notes 5 Electric Power – the rate at which _______________________ the rate at which _____________________ is converted into another form of.
Electricity on the Move. Current Electricity Unlike static electricity, which does not move except when discharged, current electricity is a continuous.
Unit 13 Electric Circuits
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
Chapter 6 Lesson 2. How can electricity flow? When an object gains of loses electrons, it has an electric charge. Similar to magnetic force, unlike charges.
STIS Status TIPS July 16, STIS Status STIS MIE anomaly –What is known STIS CCD status before the anomaly STIS MAMA SMOV status.
February 21, 2002TIPS meeting1 "Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." TIPS.
Marco Sirianni TIPS 12/18/2003 Anomalous scattered light in ACS/WFC Data Marco Sirianni D. Van Orsow, A. Welty, T. Wheeler R. Gilliland, R. van der Marel.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
19-1: Electric Current Objectives: Describe the basic properties of electric current. Solve problems relating current, charge, and time. Differentiate.
Acronyms. A SEQUENCE OF COMPUTER OPERATIONS FOR ACCOMPLISHING A SPECIFIC TASK Algorithm.
Electrical Circuits Chapter 20 Section Three. Science Journal Entry #42 Expound upon Ohm’s Law and its relationship to current, resistance, and voltage.
+ Electric Circuits Parallel Circuits and Diagrams.
Application of a Charge Transfer Model to Space Telescope Data Paul Bristow Dec’03
1 Summary Lecture: Part 1 Sensor Readout Electronics and Data Conversion Discovering Sensor Networks: Applications in Structural Health Monitoring.
Digital Image -M.V.Ramachandranwww.youtube.com/postmanchandru
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
What is the difference between PSD and CCD sensor technology?
Introduction to Engineering Camera Lab #4 – 2 Task #1 Agenda Overview of Camera Lab #4 Learn about operation of oscilloscope Review Task #1 Procedure Conduct.
Learning Objectives I can describe the parts of an electric circuit.
Circuits.
Chapter 5. Signals and Noise
Circuits, Current and Voltage
S-D analog to digital conversion
Circuits, Current and Voltage
Electrical Safety in the Home
Systems Engineering Bob Goeke.
SLAC DOE Program Review
Electric Circuits 20.3.
Circuits, Current and Voltage
Project Management Unit #2
Presentation transcript:

STIS STATUS Charles Proffitt TIPs May 21, 2009

STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan

Status of STIS Repair LVPS 2R Card Successfully inserted Aliveness test passed –All commanded mechanisms moved –Heaters work –+30 V lamp power supply available Functional test passed with some issues

Functional Test Readout electronics for both MAMAs tested Images for all three detectors read out CCD primary amp (D) may have a modest increase in read noise (5.3 e - -> 5.8e - ) Issues –Due to error in commanding, CCD shutter did not open to record lamp light –CCD Amp B showed a bias anomaly

STIS CCD AMP B Bias Anomaly Image taken using CCD B amp –Had bias level elevated by ~ DN 2 most significant bits always = 1 –Looks as if it a used different gain than that commanded –Tiger team formed to see if this might represent an electrical problem that might endanger STIS CCD or STIS Instrument

STIS CCD AMP B Bias Anomaly - cont All measurable telemetry, including voltages and current completely nominal for commanded gain settings. Preliminary conclusion that nature of fault is very unlikely to result in a dangerous short (digital rather than analog error) An Interpoint Converter should protect the rest of STIS even if a short to a power line were to occur. 2 examples of a similar anomaly found in pre-launch amp B data Detector was unusually cold due to long power-off during repair Can’t turn off affected amp and still use CCD (missing drain voltage would flood detector) As long as the B amp is powered no safety reason not to use it. –Amp D normally preferred because of lower read noise, but amp B useful for some charge transfer calibrations. –If anomaly is persistent, can use Amp A & C combo for these tests.

Preliminary Plan Since any risk appears extremely small and STIS CCD supports the majority of STIS Science, will proceed with using STIS CCD. Will slip STIS SMOV schedule approximately one week, so engineers and management can confirm preliminary recommendations before recovering STIS from safe.