Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification –Visual Inspection and conformation.

Slides:



Advertisements
Similar presentations
Electrical and thermal testing at Glasgow and Liverpool.
Advertisements

Reflection Seismic Processing
J.C Santiard CERN EP-MIC ANALOG AND DIGITAL PROCESSING FOR THE READOUT OF RADIATION DETECTORS  J.C. Santiard, CERN, Geneva, CH
Specific requirements for analog electronics of a high counting rate TRD Vasile Catanescu NIHAM - Bucharest CBM 10th Collaboration Meeting Sept 25 – 28,
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
Barrel Module Database - Status Status of upload utilities Review of uploading SCTDAQ info Flagging Hybrid re-work Module Quality uploads Module Signoff.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
AR2FL July 22, 2004 Anton, Campion, Mitch. Remaining Issues / Status One AR3FL board was stuffed in April by Godwin has been examined carefully. All locations.
Test Pulse Analysis Carl Goodrich 7/31/07. Test Pulse The Test Pulse was injected into channels 4 and 23 –We expect channels 3, 4, 5, and 22, 23, 24 to.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Time over Threshold Electronics for Neutrino Telescopy George Bourlis + multiplicity.
Module and Diode Noise Power Spectrum and Correlations.
Aldo, Stepan, Andrew. Our Make Project  We wanted to make and learn how to run a YouTube channel effectively, teaching the basics of a sport. Mostly.
LOGO CS-149 Fall 2009 Final Project project #1 by Zimeng Zhang.
Laws of Thermodynamics C ontents: 1 st Law 2 nd Law 3 rd Law.
Database Status and Progress Dave Robinson, SCT Week, September 2003 Overview New Developments - Metrology & Datasheet uploads/reporting - Module Quality.
Tim Ikin 11 th October ND SKADS Workshop 2-PAD Analogue Front End Tim Ikin Electronics Engineer 2 nd SKADS Workshop Paris 11 th October 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
Charge measurement with TDC per pixel architecture G. Dellacasa, S. Garbolino, F. Marchetto, G. Mazza, A. Rivetti I.N.F.N. Sezione di Torino, Via Pietro.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Integration of AMP & Tracenol By: Qasim Bilal Lone.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
Endcap Module Status Agreed Responsibilities Overall Production UK Situation Global Schedule Issues General Production Issues.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
PMT Readout and Floor Triggering Charge estimation using the times over the thresholds Event Building and Triggering + multiplicity George Bourlis.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
Peter Kodyš, SCT Week Valencia, Juni 13, Charles University.
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
Forward Calorimeter Layer Sum Boards Phase I Upgrade LAr Internal Review J. Rutherfoord 29 May 2015.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
Strasbourg status Ring 7 pilot run François Didierjean.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
R&D for Muon Trigger Upgrade Naohito Saito (Kyoto/RIKEN/RBRC)
Summary of FPIX tests Tom Zimmerman Fermilab May 16, 2007.
Production I.Yield. II.Acceptance criteria. III.Test. PS & SPD LHCb Calo PRR – March 2004 – CERN.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
Culturable Bacterial Communities Analyzer DIANA VANESSA SARRIA-ZUNIGA ELIANA TORRES-ZELADA April 29, 2016.
1 End-cap Module Electrical Specs. And Performance C. Lacasta + J. Pater, R. Bates, J. Bernabeu, P. Dervan, A. Greenall, C. Ketterer, J.E. Garcia, G. Moorhead,
PHL 323 Week 2 Individual Ethical Systems Table Complete the Ethical Systems Table located on the student Web site. To purchase this material click below.
Setup for automated measurements (parametrization) of ASD2 chip
Module Loading Task Force Meeting October 21, 2004
The procedure for noise rate measurement of BBC’s PMTs
MODULE QUALIFICATION STATUS AT LIVERPOOL
Setup for measurements with SCT128 in Ljubljana: SCTA128VG chip
MDC Data Check Wu Linghui
HVStripV1 Post-Irradiation Testing
US Module Production Quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
First UCSB TEC Module (Pictures)
US Hybrid/Module/Rod Testing Model
!'!!. = pt >pt > \ ___,..___,..
GLAST Large Area Telescope:
ASSESSMENT 11 assessment groups should inspect
Production Status 39 modules produced
Hybrid & Module Testing Status
AP ECONOMICS: October 20 --Notebook Check (peer review then turn in)
Presentation transcript:

Status at Glasgow

Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification –Visual Inspection and conformation scans done on both –This week bond and test 1 st qualification module –2nd module bond after 1 st module fully electrically Perl scripts –running for data archiving –Cgi script for Web access to be edited

M-O band channels warm (35C) 23 band channels cold (11C) 23C –Average input noise: Link0 = 1387e, Link1 = 1353e, Module = 1370e; –Average gain, Link0 = 53.6 mV/fC, Link1 = 55.6 mV/fC, Module = 54.6 mV/fC; –Average threshold variation (for TrimRange 0), Link0 = 1.48 mV, Link1 = 1.71 mV –Noise Occupancy, Link0 = 1.08x 10 -5, Link1 = 4.43x 10 -6, Module = 7.63x –Average front-end input noise from Noise Occupancy, Link0 = 1416e, Link1 = 1369e, Module = 1393;

M-O-44 35C 19 bad channels 14C 23 bad channels Average threshold variation (for TrimRange -1), Link0 = 1.68 mV, Link1 = 1.36 mV, Module= 1.52 mV Average front-end input noise, from 10pt ResponseCurve without fan-in problem channels, Link0 = 1393e, Link1 = 1421e, Module = 1407e; Average gain, from 10pt ResponseCurve without fan-in problem channels, Link0 = 54.4 mV/fC, Link1 = 54.7 mV/fC, Module = 54.5mV/fC; Noise Occupancy,Link0 = 9.59x10 -6, Link1 =1.95x10 -5, Module = 1.45x10 -5 Average front-end input noise from Noise Occupancy,Link0 =1413e, Link1 =1444e,Module =1428e Average Timewalk,Link0 =6ns, Link1 =6ns,Module =6ns

NO M-O cold

NO M-O-40 warm

NO M-O-44 cold

IV M-O C

M-O-044