MATERIALS ACCEPTANCE. LPA Construction chapter -2 paragraphs on -Materials Quality Control -Materials Finalization -andAppendix J -LPA materials acceptance.
Advertisements

Contract & Risk Management Process. Structured process to develop bespoke contracts from standard models initially for strategic direct materials, later.
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.
Design/Build Solutions to your construction projects, large and small.
Assessing Competence within Construction Gary Plant CEng MIMechE 12 th April 2012.
Materials Auditing on LPA Projects Experiences of one district.
Codes & Standards.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
Ensure Vendor/Engineer of Choice Product Quality
Supervision and Administration
Slide 1 Caltrans Bridge Construction Forum 2007 Structure Specifications Andre K. Catellier RNR Construction, Inc. Jeff Abercrombie California Department.
Richmond/San Rafael Bridge HIGH CAPACITY MICROPILE CONSTRUCTION AGRA Foundations, Inc.
Do Your Weatherization Standards Measure Up? WARM CHOICE Program Standards and Procedures Energy Essentials Core Contractor Training December 10 and 11,
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011.
Contractor Safety Management
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
2002 FDOT/FTBA Construction Conference
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Introduction to Murabaha Version 2.0 Release Date: Jamad ul Thani 31, 1430 H June 25, 2009 Prepared By: Product Development and Shariah Compliance Department.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Jim Merrill, Welding Engineer, Law Crandell
New York State Department of Transportation
1 Board Meeting September 29, 2014 Public-Private Transportation Partnership Board.
Slide 1 Caltrans Bridge Construction Forum 2007 Bidding Process and Construction Environment Brian Mapel FCI Constructors Inc. Jeff Abercrombie California.
 Sign Inventory  Rule – 37.I  Types of signs Inventoried Outdoor Advertising Official and Directional Public Service Notice Service Clubs.
0 October 2010 Occupational Health Department Asbestos Awareness (OEMP005) Occupational Health Department NOTE: Detailed speakers notes included to support.
Assuring the quality of external participants' contributions Michael Rooney mpr07u.
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
STH 145 Roundabout Presentation Bloom Companies, LLC July 3, 2012.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Commonwealth Self Bonding Program by the Department of General Services – Division of Engineering and Buildings Department of Treasury – Division of Risk.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Quality & Continuous Improvement What is quality??? Meeting or exceeding the needs of the customer. Achieving a level of perfection without defects, mistakes.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
IQE.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module VII Purchasing and delivery for the Manufacture of Safe Pet.
Bridge Construction Forum 2006 The Human Factor Duff Joseph, Erreca Inc. Working to Build the Future Together.
Delivering Successful LED and Energy projects Ken Carter 29/6/2015.
Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation.
Best Practices Guide DRAFT Soliciting Comments for 30 Days As lab testing moves forward –Changes in limits may be fine tuned As field work moves forward.
Slide California Bridge Construction Forum Opening Remarks Dolores Valls, Chief, Statewide Operations Offices of Structure Construction.
PROJECT CLOSEOUT MODULE 11. Objectives Establish procedures for effective/smooth project close-out As-built plans Project payment Certifications Report.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
WP High Beta Cavities Delivery
Richmond/San Rafael Bridge HIGH CAPACITY MICROPILE CONSTRUCTION
Purchasing supplies at CERN
Strategic Alliance Contract Northern Improvement
Construction Management
Raw Materials For Precast Concete Pipe and Box Culverts
Construction Materials and Workmanship
IEC e-Learning module Module 31 – unit 03 IECQ Benefits © IEC 2017.
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
Managing Material with Efficient use of DOT Resources
Right of Way Certification
Fiber Reinforced Polymer Systems
Presentation transcript:

Caltrans Bridge Construction Forum 2007 Structure Materials Bill Corn Balfour Beatty Construction Ken Bocchicchio California Department of Transportation

Structure Materials Suppliers - What’s good or bad? Pre- qualification – Can there be more? QC/QA Paperwork - Shortage of Materials and Suppliers

What is good or bad as a supplier for Caltrans? Is payment timely? Are specifications consistent? Would additional material indexing on long-duration projects reduce risk and cost? Have new specifications impacted suppliers?

Pre qualification What procedures should be pre-qualified? CIDH, Welding, Yellow Paint Removal? What materials should be pre-qualified? Concrete, asphalt, rock, cure? What plants/shops should be pre-qualified? Sign structure fabrication, pipe pile, light and signal poles?

QC/QA Paperwork Caltrans is moving toward the contractor being responsible for quality assurance. Caltrans is moving away from method specifications and moving toward performance specifications.

“Tagging” QC/QA Paperwork Caltrans materials release process Timing Transfer Between Projects Certificate of compliance to allow acceptance on site

QC/QA Paperwork Are requirements clear? Is there too much paperwork required? Is the ownership of the acceptance clear? Which materials or operations do contractors want to provide QA?

Shortage of materials and suppliers Why? Because Caltrans is not the owner of choice? Because the volume of work available nears the maximum capacity of suppliers? Limitations on raw material?

WHAT ARE THE ISSUES? Late payment Late material delivery Incorrect QA/QC paperwork Acceptance concerns

SOLUTIONS ?