V&V Challenges, Successes, and Ideas for Improvement an In-Service Management View Presented to: Verification & Validation Summit #5 By: Jennifer Duffy,

Slides:



Advertisements
Similar presentations
- 1- Just enough. Just in time. Just for you March 24, 2011 Building a solid foundation: A new approach to ERP acquisition March 24, 2011 Mike Reyna Project.
Advertisements

IBM Software Group ® Traceability From Need To Solution What, Why and How Tammy Lavi Alon Bar-Ner.
EAP Channel Bindings Charles Clancy Katrin Hoeper IETF 76 Hiroshima, Japan November 08-13, 2009.
Friends and Partners in Aviation Weather (FPAW)
Presented to: Icing Weather Information Exchange Location: NCAR, Boulder, CO By: Mark Mutchler Date: November 2013 Federal Aviation Administration Using.
Operational Considerations in the Certification of TAA Slide 1 Operational Considerations in the Certification of Technically Advanced Aircraft (TAA) Robert.
Presented to: By: Date: Federal Aviation Administration Aviation Software Systems for the Second Century of Flight Research and Roadmap Thoughts High Confidence.
Online Postgraduate Admissions Project Kate Ward – Project Manager.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Strategic Planning Larry Potterfield Founder and CEO.
ISO 9001:2008 What did the November 2008 amendments to ISO 9001 mean to you?
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Network trouble ticket standardisation -
Best Practices In Design Outcomes Of A Survey P. H. King, PhD, PE Joan Walker, PhD Vanderbilt University.
Effective Methods for Software and Systems Integration
Strategic Planning Larry Potterfield Founder and CEO.
Software Engineering 1 The Life Cicle of Software Lesson 5.
Joint Meeting: Department Grant Administrators Budget Managers January 26, 2011.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
5-7 November 2014 ADLSN - ADLC Practical Digital Content Management from Digital Libraries & Archives Perspective.
IT Service Continuity Management Report : Week - XX> Date: DD-MON-YYYY.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
Researching a Valid Medical License It is important for many people to check on their doctors to ensure they have a valid medical license and are in good.
FAA NAS Enterprise Architecture – Informing Future Challenges in V&V for NextGen 2009 V&V Summit November, 2009.
Presented to: By: Date: Federal Aviation Administration SWIM Governance Demonstration and Prototyping Information Exchange Briefing Paul Jackson November.
SacProNet An Overview of Project Management Techniques.
Unmanned Aircraft Systems (UAS)
1 Dr. Ralph R. Young Director of Software Engineering PRC, Inc. (703) DOORS USER GROUP CONFERENCE Reston, VA September 17,
Project Communication Planning AKF – Bamiyan
Continuous Improvement and Focused Monitoring System US Department of Education Office of Special Education Programs Overview of the OSEP Continuous Improvement.
The Why (Waiver & Strategic Plan) Aligned to research: MET Study Components: Framework/Multiple Measures Pilot Requirements Timeline.
Presented to: Verification and Validation Summit By: James Daum NextGen and Operations Planning Safety Manager AJP-1900 Date: November 05, 2009 Federal.
By: Mark DeNicuolo Manager, SMS Safety Assurance, AJS-23 Date:November 5, 2009 Federal Aviation Administration 2009 Validation & Verification (V&V) Summit.
Federal Aviation Administration Acquisition Career Certification & Management Rebecca Deloney Acquisition Career Management November 4, 2009.
Presented to: By: Date: Federal Aviation Administration Quality and Standards Team (QST) In-Service Management Gold Standard ATO Acquisition Practices.
NCHRP Project Development of Verification and Validation Procedures for Computer Simulation use in Roadside Safety Applications SURVEY OF PRACTITIONERS.
Developing an Electronic Dossier System for UCLA Faculty: Planning Proposal Presentation to Committee on IT Infrastructure November 30,
Federal Aviation Administration 2011 V&V Summit: Verification & Validation Overview Presented by: John Frederick Date:10/19/11.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
By: Date: Federal Aviation Administration Focus on the Future 8 th Annual V&V Summit 2012 John Frederick Test Standards Board Chairperson Manager, V&V.
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
Presented to: By: Date: Federal Aviation Administration A Three Test Programs For Flight Service V&V Summit #5 Eric Hoover, Test Director / Core.
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
By: Date: Federal Aviation Administration NextGen Overview Storyboard 10 th Annual Verification & Validation Summit Harry William Bilicki September 24.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Transformation of a National Laboratory: ISMS Component Beth Streeper ISMS Program Manager Integrated Safety Management Workshop 2007 Brookhaven National.
Presented to: By: Date: Federal Aviation Administration Research To Operation FPAW Richard Heuwinkel October 9, 2008.
E911
Features of the Diabetes Educator. Educational Features: 12 VAMC reviewed multi-media training lessons. 3 Abbott produced interactive product training.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
MODIS Science Team Meeting Diane E. Wickland MODIS Program Scientist Office of Earth Science National Aeronautics and Space Administration July 13, 2004.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
Presented by: Laurie Camilien-Pietrak, AVS Date: November 4-5, 2009 Federal Aviation Administration FAA Aviation Safety (AVS) Role in V&V.
Presented to: By: Date: Federal Aviation Administration New York Center System Operations Traffic Flow Management Operations Weather Users Workshop Tom.
Presented to: By: Date: Federal Aviation Administration Friends and Partners in Aviation Weather Michele Merkle, Federal Aviation Administration Director.
Presented to: By: Date: Federal Aviation Administration Aviation’s Impact on the Economy Airports Conference Diane Crean, AEA Deputy Administrator April.
Defining and Managing Project Scope. MOV Scope Phases Time Estimates Resources Tasks Schedule Budget Sequence Project Planning Framework.
© NALO Solutions Limited NALO Solutions, presents the – Revenue Collector App Using Mobile Phones to gather Revenue SOFTWARE ENGINEERING.
Real Examples SOA Governance in Use Today 2nd SOA for E-Government Conference Presenter: Chris Brown Date:
Presented to: FASMT By: AAM-510 Date: April 15, 2015 Federal Aviation Administration Checking AMCS Vitals: Airman Satisfaction Survey 2014 Results.
Stages of Research and Development
DSC Change Governance Review Group
SIP Report – Nov 2017 Overview Headlines Workstream report
Shawn Ralston SB Program Manager National Governments AECOM
Project Specification
Accreditation Pathway
Raytheon Parts Management
Progression of Test Categories
Systems Operations and Support
Applications Development - Unit Testing
Presentation transcript:

V&V Challenges, Successes, and Ideas for Improvement an In-Service Management View Presented to: Verification & Validation Summit #5 By: Jennifer Duffy, Test Conduct Manager ATO-E Program Operations, Second Level Support Date: November 5, 2009 Federal Aviation Administration

ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 ISM Verification Processes Good verification processes –T&E Gold Standard is a good verification process –Each phase has its own verification effort –Test results are a vital component of the Decision to Deploy –Peer Reviews of work products for technical accuracy Federal Aviation Administration Define ItDesign ItBuilt ItTest ItDeploy ISM Approach: ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009

ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 ISM Validation Processes Validation is part of the process –NAS Change Proposal (NCPs) are typically validated –Operational assessments/evaluations conducted for changes Validation processes are less solid –Operational requests for changes are often assumed to be valid –Changes are not always re-validated through each phase –T&E Gold Standard and AMS are vague on validation efforts –Original validation history is often lost over time Federal Aviation Administration Define ItDesign ItBuilt ItTest ItDeploy ISM Approach: ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009

ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 Example Validation Issue System X had a Problem Trouble Report (PTR)… –The problem was not directly linked to any requirement –The PTR seemed reasonable taking numerous hours to change, verify, and deploy –In the end, the request was not valid taking more hours to remove, re-verify, and re-deploy The lessons learned –Do not assume all user requests/problems are valid –Ensure changes are validated against the original need –Carry forward information to ISM Federal Aviation Administration Define ItDesign ItBuilt ItTest ItDeploy ISM Approach: ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009

ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 Why is V&V important during ISM Avoiding unnecessary operational impacts –V&V helps ensure operational needs are met Systems are part of an integrated service –More and more systems are not stand alone in providing a service –V&V is also needed for the service New capabilities are planned using existing systems –Need to validate system changes against the future needs/requirements Federal Aviation Administration Define ItDesign ItBuilt ItTest ItDeploy ISM Approach: ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009

ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 ATO-E IN SERVICE MANAGEMENT Date: XX NOVEMBER 2009 Moving forward… Clearly define Verification and Validation activities –Clearly identify and perform V&V during each phase –Ensure the activity is about having the “right” system/service –Factor in future needs as part of the V&V activity Create a seamless approach –Carry forward V&V information from each AMS phase –Carry forward V&V information from each ISM phase Federal Aviation Administration Define ItDesign ItBuilt ItTest ItDeploy ISM Approach: V&V Need & Planning Work Products V&V Design Work Products V&V Products/Product Components V&V End Work Products ATO-E IN SERVICE MANAGEMENT Date: 5 NOVEMBER 2009