Level 1.5 Processing Updates Martin Bates, RAL GIST 23 28 th April, 2005.

Slides:



Advertisements
Similar presentations
GERB-2 GEO 22/11/05 J. Hanafin Using IDL coastline information as independent check on L15 and L2 Geolocations Only SW and SWF day time radiances used.
Advertisements

SABER Instrument Performance and Measurement Requirements.
CERES-GERB meeting, Boulder, 3/2004 Validation of GERB unfiltered radiances S. Dewitte Royal Meteorological Institute of Belgium.
Mav Mark 10/3/11 How do you convert a motor into a generator?
GIST 19: GGSPS Planning GGSPS Development & Review Planning Andy Smith GGSPS software project manager.
Clouds and the Earth’s Radiant Energy System NASA Langley Research Center / Atmospheric Sciences Methodology to compare GERB- CERES filtered radiances.
Calibration commissioning 16/01/2003: Extended ‘Normal mode’ 282 columns 22/01/2003: TOTAL forward and reverse scans ~11:00-12:15 23/01/2003:Earth stare.
Ensemble Tracking Shai Avidan IEEE TRANSACTIONS ON PATTERN ANALYSIS AND MACHINE INTELLIGENCE February 2007.
In-orbit calibration (TOTAL channel) V space -V IBB Raw Earth V (counts) Raw IBB V (counts) =
Processing of exoplanet full field images Farid Karioty CoRoT Week 12/06/2005.
Which of the following is correct:
Plans for interim data release J E Russell (Imperial)
NCC Status December 04, 2012 Calvin Liang Stephanie Weiss NGAS A&DP.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Motions of the Earth Our goals for learning: What are the main motions of the Earth in space? How do we see these motions on the ground? How does it affect.
Space Cycles Review. Cycle # 1 Day  Night  Day  Night.
Level 1.5 Processing Issues Martin Bates RAL. Level 1.5 Processing Issues Geolocation –Current Status –TSOL Jitter (CSOL-TSOL) correction –Longterm TSOL.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
01:Seasons, Day vs. Night, Earth in Space World Climate Patterns World Geo 3200/3202 Unit 2 November 2010.
© Imperial College LondonPage 1 Operations Report/ Operational Calibration Strategy GIST 19, RAL 28th August 2003 J A Hanafin.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
Data Release Requirements, decisions and plans. What we need New machine Implement (and test) all proposed changes from current Provide data quality summary,
Overview of the “Geostationary Earth Radiation Budget (GERB)” Experience. Nicolas Clerbaux Royal Meteorological Institute of Belgium (RMIB) In collaboration.
RGP geolocation analysis. The geolocation problem We don’t have all the necessary information: –Optical model needs tuning Can prob. do this now but not.
STAR Collaboration Meeting Rene Bellwied – Wayne State University July 2004 SVT Calibration and STI tracking status An update of work since the SVT review.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
19 th GIST Meeting 27 th –29 th August 2003 GERB mirror mechanism 1 GERB mirror mechanism, pointing and repeatability (Tech Note MSG-RAL-GE-TN-2011) B.C.Stewart.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
TDTIMS Overview What is TDTIMS? & Why Do We Do It?
Time Series Analysis Predicting future sales from past numbers.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
© Imperial College LondonPage 1 Calibration Commissioning Report GIST 19 RAL, 27th August 2003 GERB Instrument Team & Operations Team.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
RMIB involvement in the Geostationary Earth Radiation Budget (GERB) and Climate Monitoring SAF projects Nicolas Clerbaux Remote sensing from Space Division.
Level 1.5 Geolocation Martin Bates, RAL GIST th December, 2005.
Geolocation Tuning and Status Geolocation Accuracy of Available Data Problems –E-W, N-S Centering –Discrepancies Comparing with RGP –Axis Misalignments.
Product status and timeline Andy Smith RAL. User products The GGSPS provides user access to the following products: Level 1.5 NANRG, ARG Level 2 ARG (and.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
Measurements Measurements and errors : - Here, the goal is to have some understanding of the operation and behavior of electrical test instruments. Also,
IBB Calibration Update J. Rufus GIST21 Meeting Boulder, CO. 31 st March – 2 nd April 2004 © Imperial College London.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
GIST, Boulder, 31/03/2004 RMIB GERB Processing: overview and status S. Dewitte Royal Meteorological Institute of Belgium.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
GERB in-flight calibration Monitoring Instrument Gain.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS JMA’s Cal/Val activities Presented to CGMS-44 Working Group.
Inter-calibration using DCCs and seasonality
Validation status overivew
X-band Mobile Radar Data Update
Validation status overivew
GOES Lunar Calibration
Multidisciplinary Engineering Senior Design Project P06441 See Through Fog Imaging Preliminary Design Review 05/19/06 Project Sponsor: Dr. Rao Team Members:
NOAA-KMA Collaboration on Imager Midnight IR Calibration Anomaly
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Himawari-8 Launch and its calibration approaches
EUMETSAT implementation of the DCC algorithm Sébastien Wagner
Moving toward inter-calibration using the Moon as a transfer
Measurements Measurements and errors :
UVIS Calibration Update
Moving toward inter-calibration using the Moon as a transfer
Use of GSICS to Improve Operational Radiometric Calibration
Developing GSICS products for IR channels of GEO imagers Tim Hewison
G16 vs. G17 IR Inter-comparison: Some Experiences and Lessons from validation toward GEO-GEO Inter-calibration Fangfang Yu, Xiangqian Wu, Hyelim Yoo and.
Presentation transcript:

Level 1.5 Processing Updates Martin Bates, RAL GIST th April, 2005

Contents Gain calculation Geolocation ARG Duplication

Gains LFLF V Space view Black body view 1 / G TOT TOTAL Instrument continually calibrated in-flight using views of (warm) internal Black Body and (cold) space Calibration can go wrong if bright objects encroach on space view Stray light and the moon are two sources of contamination

Gain Calculations Currently flag affected data –stray light flagging implemented as part of new product confidence flags (11-Jan-2005) –but moon not flagged Original suggestion was offline gains –gains are stable –but problem of keeping up with changes Two other ideas –split gains –running averages

Split Gains What are split gains ? –Calculate average response (DS-BB) per pixel in western and eastern halves of image –if either half exceeds the other by more than a set amount, remove that half from gain calculation (DS – BB) west > (DS – BB) east Use only eastern pixels for gain calculation

TOTAL Response (All pixels) Stray light bar Stray light in blackbody

Lunar Data

without sd cut with sd cut Typical response ~ to % => need to be sensitive to change of ~ 10 counts

Centring Problem Change in MSG rotation rate Jan –GERB looks further west –Not enough space pixels to east at equator (for split gains) Corrected itself following 08 Feb 2005 manoeuvre 26 Oct 2004 E-W Centring Spin Period

Split Gains Summary Cannot be used on 2004 data Monitor centring more tightly to ensure feasability of use for future data Need to cut at ~ 10 counts –level of background this will produce would need to be measured

Running Averages Maintain a running average gain for each pixel. Update running average with latest measurement Weight of any given measurement drops away over hours No updates ~ midnight (check stray light flags) Lunar effects washed out Similar for BB SW Meas Radiance. Gain = ra_factor * Inst_Gain + (1- ra_factor) * Ave_Gain ra_factor = 0.008

TOT Gain Feb 2005 Pix 200

TOT Gain Feb 2005 Ave Pix

TOT Gain 01 Jan 2005 Pix 24

Summary Advantages of running gains: –successfully handles stray light and lunar data –uses more measurements takes advantage of stability of gains gain measurement less noisy (particularly central pixels) (split gains would actually use fewer measurements) –still tracks longer term (> few hours) drifts in gains –should work on 2004 data and nrt data Disadvantages ? –Time dependence to processing ? Stability of gains means order of processing not critical –Start-up conditions ? Write gains to file after each scan processed – file can be read if processing stopped and started Revised weighting scheme for startup until a stable running average is derived Should only ever come into play once Proposal: –Switch on running averages for current level 1.5 processing. –Switching to split gains remains an option if suitable cuts can be devised.

Stray Light in Black Body Occurs ~ midday near equinoxes Problem because each EV pixel reading needs corresp. BB reading subtracted: (V EV – V BB ) Could use a known gain and deep space reading: L BB = (V DS – V BB ) / Gain but would need V BB to be stable over a scan (is it ?) Use V IS ? Otherwise, just flag as now Sep 27 Jul 05

Geolocation Last time: –Comparisons between GGSPS L1.5 GEO and RGP level 2 GEO (nrt and 90 min) –time dependent, unphysical corrections to optical model, variations at 0.1  – 0.2  level –noise in level 1.5 column spacings (SOL_SOE_Delay) Plan: –devise a “good” optical model correction –implement level 1.5 GEO in level 2 processing for a pre-defined test period –still to be done –however, new problems have arisen in Jan/Feb 2005.

E/W Shift (Spin rate) Spin rate change associated with 08 Feb manoeuvre

Effect of spin rate changes MSG SLOWS DOWN MSG SPEEDS UP A known consequence of de-spin mechanism But predicted magnitude out by ~1 pixel in 7.

N/S Shift (??) N/S Shift commencing 15 Jan 2005

N/S Shift Jan 2005 Coincident with increase in spin axis tilt Also follows SEVIRI decontamination

Geolocation Instantaneously, we have had a 1 pixel shift E/W in level 1.5 geolocation (manoeuvre). Over a 2 week period, we have had a 1 pixel shift N/S in level 1.5 geolocation –not associated with any manoeuvre –coincident, if not connected, with increase in spin axis tilt (and end of SEVIRI decontamination period) –may be connected with changing axis misalignments ?

Effects of Axis Misalignments Effect of axis misalignments on determination of optical model Getting knowledge of axis misalignments now a high priority. No misalignment 0.3 degrees (radial rotation) 0.3 degrees (transverse rotation)

L15G 90 min fits

ARG Duplication Renaming Duplication G2_SEV1_L20S_ _145013_V002.hdf G2_SEV1_L20S_ _150711_V002.hdf G2_SEV1_L20S_ _144500_V002.hdf G2_SEV1_L20S_ _151500_V002.hdf G2_SEV1_L20S_ _150000_V002.hdf SEVIRI GERB

ARG Duplication Having second thoughts about this scheme: –Current status (renaming but no duplication) looks as though there is missing data filename misleading as to data contents –ARG Duplication seemingly independent files actually contain the same data filename still misleading as to data contents How feasible/desirable is it to abandon scheme and name ARGs according to data content ? –remember designed for level 1.5 ARG, but main product affected is level 2 ARG. –(technical): can RGP avoid renaming to a precise 15 minute slot ?