Advisory Council 8 th Meeting 20 th February 2008 Newpark Hotel, Kilkenny.

Slides:



Advertisements
Similar presentations
1 Update on progress in SOE-drafting group. 2 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Strategic Co-ordination.
Advertisements

1 What happens next? November Contents WFD timetable & consultations The River Basin Management Planning Process Applying classification Making.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 1: Roles, Responsibility and Legislation Muckno Mill Lough.
Presentation to South Eastern River Basin District Advisory Council Lisa Sheils Project Coordinator 28th April 2006.
1 Carlow County Council Environment, Water Services & Planning Sections 19 th November 2007.
The Environment Agency Alasdair McKellar – PPC/COMAH Regulatory Officer.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 3: The Local Authority - What’s happening? Castle Lake,
Advisory Council 10 th Council Meeting - 3 rd September 2008 Strategic Environmental Assessment (SEA) Ray Spain.
Water Seminar – 14 April 2010, Athlone European Communities environmental objectives (Groundwater) Regulations 2010 S.I. 9. of 2010 Colin Byrne Water Inspector.
Significant Water Management Issues (SWMI) Report South Eastern RBDAC Dec 2006.
River Basin Management Plans & Strategic Environmental Assessment & Appropriate Assessment Ray Spain Local Authorities Workshop, 3 rd December 2008.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
1 Advisory Council 7 th Council Meeting Project Update Riverside Park Hotel, Enniscorthy, Co Wexford Ray Spain (Project Co-ordinator)
Regional Water Councils and Implementation Actions June 17, 2008.
IPPC Discharges Monitoring Workshop Water Framework Directive Overview (and its implications for Industry) Peter Webster Regional Chemist (EPA Cork)
Powerpoint Templates Page 1 Powerpoint Templates Black Sea Basin Directorate – presentation of the scope, responsibilities and project interests Mrs. TANYA.
European Commission - DG Environment Unit D.2: Water & Marine 1 Pau-Plenary Session 14 may 2008 Pau-Plenary Session 14 may 2008 CMA developments and state.
SERBD Advisory Council Meeting 20 th February 2008 Synopsis of Public Meetings.
Post RBD Projects 2009 What happens ? Post RBD Projects 2009 What happens ? RBD Handover Issues Seminar: Newpark Hotel Wednesday 28 th March Brendan O’Brien.
1 The Clonmel Park Hotel, Clonmel 21 st November 2007.
Implementation of WFD River Basin Management Plans for Northern Ireland Bridgeen Magorrian.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
WFD Reporting, Copenhagen, 4th Feb 2010 Schema overview WFD reporting training Copenhagen, 4 February 2010 Jorge Rodriguez-Romero DG Env, European Commission.
GIS & Data Management Update. 1.SERBD Website 2.National WebGIS 3.EDEN (Environmental Data Exchange Network) 4.Post RBD Project (Regional Management Unit)
European Commission - DG Environment Unit D.2: Water & Marine 1 Need for continuous exchanges on chemical monitoring issues, in the light of the on-going.
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
EEA water report 2012 Upcoming EEA report state of our water environment 2012 In support of the Commission Report on WFD implementation Peter Kristensen.
Building WFD into impact assessment Richard Sharp Geomorphology IEMA webinar Thursday 31 March 2016.
National Sampling Programme Carol McCarthy, A/Senior Engineer LAWCO/ Kilkenny County Council Environmental Services Training Group Annual Conference 26.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
EEA 2017 State of European waters
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
Project Coordination Group (PCG) for the implementation of the MSFD
Philippe Quevauviller, Johannes Grath
on Priority Substances Strategic Coordination Group
Water Directors’ Meeting Common Implementation Strategy
Philippe QUEVAUVILLER
Preparing a River Basin Management Plan WFD Characterisation Manager
Groundwater Dependent Terrestrial Ecosystems…
Commission report on Art. 8 WFD Monitoring programmes
Management of Natura 2000 Sites
Drafting group Mixing Zones
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
Meeting of Water Directors Future Work Programme of the CIS
Project 2.7 Guidance on Monitoring
WG 2.B Integrated River Basin Management
Water Directors’ Meeting Working Group D (Reporting) activities
Fitness Check of EU Freshwater Policy
EU Water Framework Directive
Marine Strategy Framework Directive Contaminants Implementation of descriptors Coordination MSFD – WFD , WFD WG chemicals, Bruxelles,
Strategic Coordination Group 2007 Reporting Guidance on Monitoring
Part I.
Common Implementation Strategy for the Water Framework Directive
Preparation of the second RBMP in Romania
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
THE WATER FRAMEWORK DIRECTIVE (WFD)
Directive on the assessment and management of flood risks - towards implementation SCG, By Maria Brättemark, European Commission, DG Environment,
Philippe Quevauviller
Finalisation of study report
Concept paper on the assessment of WFD River Basin Management Plans
Article 13 RBMP Schema.
Brussels – 20 April 2007 European Commission - DG Environment
SCG May 2005 CIRCA review.
Results of the screening of the draft second RBMPs
Finalisation of study report
Presentation transcript:

Advisory Council 8 th Meeting 20 th February 2008 Newpark Hotel, Kilkenny

1.SERBD Laboratory Work Program for 2008 – further characterisation and filling in the gaps. Methodology for Local Authorities to prioritise investigative monitoring and inspection has been prepared 2.Public Consultation 23 submissions on SWMI received. These are been complied at present for inclusion in the draft RBMP We will have synopsis of these for next meeting 3.Hydrometrics A new list of sites has been agreed by the EPA. Extend the existing contract of the consultant who is carrying out the National Groundwater Hydrometrics, for which Carlow County Council is lead Within existing budgets. PROJECT PROGRESS UPDATE

4.Dangerous Substances Final report from TNO Holland - agreed by the National W.G. Working Group have agreed their own final report Forwarded to the National Technical Coordination Group for their approval. 5.Setting Chemical Quality Standards SEA and RIA for the proposed new EQS ongoing by the EPA New draft regulations from DoEHLG shortly. 6.Surface Water Status SERBD staff supporting EPA Interim “Water Classification Status” for all water bodies nationally. This will allow work on the draft River Basin Management Plans to proceed and particular in deciding which Programs of Measures should apply PROJECT PROGRESS UPDATE

7.National Groundwater Monitoring Contractors appointed - work to commence within next 3 weeks. Carlow County Council acting as lead authority Total spend cicra €2.7m with 121 boreholes and 35 spring sites Local authorities for maintenance and upkeep EPA carrying out the monitoring on behalf of local authorities. WRRBD lead authority for Groundwater Protection Schemes on these sites. Monitoring of Groundwater EPA on behalf of Local Authorities through national contract. Round 5 of program Access issues – most have been resolved PROJECT PROGRESS UPDATE

8.Website Meeting minutes and copies of presentations Up to date reports etc. 9.Draft River Basin Management Plan DoEHLG are preparing a guidance document for local authorities Integrated with Co. Development plans, Waste Management plans, etc Strategic Environmental Assessment (SEA) North South Share River Basin project. 11.Marine Monitoring It should be noted that there will probably be a gap in the RBMP in relation to this element. No national monitoring program has been established to date and very little work has been undertaken. This issue is been considered by the National Technical Coordination Group and the DoEHLG. PROJECT PROGRESS UPDATE