External Interface Update 1 External Interface Update April 2, 2007 Daryl Shing.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

7. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Detailed Object-Oriented Requirements Definitions  System Processes—A Use.
Bert Lathrop Director, IT Infrastructure 10/6/2011 WAN Management Fee - Billing Changes.
N. K. SHETH & COMPANY1 THE CHAMBER OF TAX CONSUTANTS Welcomes all Participants to Seminar on e-Filing of Service Tax Returns Subject : E-Filing of Service.
Nodal EDW Project Reporting Requirements & Conceptual Design Update EDW Project Team July 23, 2007.
OASIS document rules Nigel Shaw Eurostep Limited.
ISO 9001:2015 Revision overview - General users
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates March 07, 2008.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Testing Aug 14, 2007.
Integration Update 1 External Interfaces & Integration October 14, 2008 Brian Brandaw.
XRules An XML Business Rules Language Introduction Copyright © Waleed Abdulla All rights reserved. August 2004.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Oct 03, 2008.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
July 9, 2007 TPTF Meeting Texas Nodal Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Lead from the front Texas Nodal 1 EDS 4 DAM/RUC/SASM EDS 4.9 Market Call March 28, 2008.
Machine to Machine Interface Update 1 Machine-to-Machine Interface Update January 10, 2007 Daryl Shing.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.
Texas Nodal Timeline Options, TPTF Jul 11, Timeline Options Trip Doggett TPTF
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Using the Right Method to Collect Information IW233 Amanda Murphy.
1/22/08 RTR Project Presentation to TPTF RTR Project Michael Daskalantonakis & Brian Cook.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
Market Participant Data Access 1 Market Participant Data Access Jan Stephen Kerr.
1 Registry Services Overview J. Steven Hughes (Deputy Chair) Principal Computer Scientist NASA/JPL 17 December 2015.
1 Encore Data Distribution Services Workshop February 19, 2004.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Commercial Systems Market Data Transparency Business Requirements.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management May 19, 2011.
Nodal Formatting of Zonal Protocols Sections Currently Not Part of the Nodal Protocols 11/28/06 TPTF Diana Zake, Market Rules.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 16, 2007.
Software Requirements Specification Document (SRS)
Integrated Release Approach and Update TPTF 11/10/2008 Matt Mereness.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 02, 2007.
Integration Update 1 External Interfaces & Integration Aug Stephen Kerr.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
External Interface Update 1 External Interface Update May 7, 2007 Daryl Shing.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
1 Options Clearing Corporation Encore Data Distribution Services April 22, 2004.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Lead from the front Texas Nodal 1 EDS 4 DAM/RUC/SASM EDS 4.9 Market Call April 4, 2008.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Phase 1 Testing Monday / Friday Market Updates September 26, 2007.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
GCE Software Systems Development A2 Agreement Trial Implementing Solutions October 2015.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Cutover Market Call November 29, :30 PM
Webservices Update for Nodal Market Trials
USOAP Continuous Monitoring Approach (CMA) Workshop
Fast Track Maintenance Process (for existing messages)
Yearly Maintenance Process (for existing messages)
Presentation transcript:

External Interface Update 1 External Interface Update April 2, 2007 Daryl Shing

External Interface Update 2 Specification is published Is available for download from We will seek approval for the specification on April 22 nd. Includes feedback from the API Subgroup meeting. We also plan to organize all of the interface specifications to give a clear picture of how Market Participant will interact with ERCOT.

External Interface Update 3 Feedback from the API working group MRID & MMS keys questions –There is a 3 step validation of submissions Submitted message conforms with the message format (XSD Schema). MMS applies business rules and may reject certain submissions. The rules and timeline will be published separately by the MMS team. MMS sequentially processes the submissions against the credit limit. Submissions that cause the credit limit to be exceeded are rejected. –MRID will be generated as an optional element and not stored in EIP. –MMS supplied the following definition of market intervals Valid submission Invalid submission

External Interface Update 4 Feedback from the API working group Timestamps –Agreed to use ISO 8601 and timestamps would use the prevailing time in Texas rather than Zulu or other convention –Another time format will be used to reflect market hours and intervals that is suitable for use with MMS. –The specified interfaces may change once the rules from receiving systems e.g. MMS are finalized Web services will support some MIS Portlets but not all –Excludes user interface Portlets. –Some data interfaces will be JMS rather than Web Services. –The External Interface Specification is the complete list of available Web Services. Organizing all interface specifications to give Market Participants a clear picture –There are a number of separate specifications and lists of Market Information being sourced from various efforts within the Nodal program –We are working with the relevant projects to produce a single interface overview document that will refer to: The External Interface Specification MIS published content Market information reports ICCP Other interfaces such as long term wind power forecast that Wind Generators will supply to ERCOT

External Interface Update 5 Feedback from the API working group Incremental & Decremental energy offer curves –Version 0.9 was published on 3-29 with a single curve. –Version 0.91 published 3-30 with curves for incremental and decremental energy offer curves. This was an oversight rather than deliberate omission –Identified that both curves will be necessary from protocols. –Discussions on this part of the MMS detailed design indicated a single curve. –Integration team assumed the input on detailed design was the latest and correct view. –The integration team is using protocols and all available design input, however design documentation is incomplete and there are frequent instances of changes in source systems. –The integration team tracks these changes and responded appropriately to this event within a couple of days by amending the specification.