Norway Benchmarking Trip June 2015 Mail Centre showing letters in trays to be sequenced or already sequenced.

Slides:



Advertisements
Similar presentations
PROPER USE OF FLOOR JACK AND SAFETY STANDS
Advertisements

OUR TRIP TO THE POST OFFICE November 3 rd, 2011 Pine Road Life Skills Class.
Module 2 Worksite Inspection Checklist Days to a Safe and Healthy Workplace - Days 6-10.
Prepared by Denese Ballew and Brian Taylor from Land-of-Sky Regional Council Solid Waste Management Study for the Town of Waynesville.
Developing the Program.  Different aspects of the ITCP will be identified and developed during the various construction phases of a project.  Depending.
Container Stuffing and Stripping
Copyright  Progressive Business Publications 1 Forklift Safety.
Waste Collection. Lesson Objectives  Understand problems and concerns associated with MSW collection.  Compare and contrast privately and publicly operated.
Chinese International School Laboratory Refurbishment A case Study of laboratory design.
Delivery Programme Indoor Work Method Improvement Principles Overview.
Module 9 Leaving the Office. Objectives  Recognize forms and equipment carried on the route  Properly process hot case mail  Apply automated mail procedures.
Module 8 Pulling Down the Carrier Case. Objectives  Apply appropriate pull down procedures according to route type  Utilize safe lifting techniques.
Working Safely This presentation is designed to assist team leaders, supervisors and trainers explain and reinforce to supported employees within the.
Guide Craft Badge Ideas
Independent mobility through the use of scooters Transport options for disabled people.
| India Post0 Improving operational efficiency for Speed Post SOURCE: Mail Network Optimisation Project Processes at Booking POs/ MBCs/BNPL Centers Network.
Peter pipper pick a pack of picked pepper. A pack of pickled pepper peter pipper pick. If Peter pipper pick a pack of pickled pepper, where the peck of.
AMARI AIR BASE AT/FP EVAL 9 JUNE (No photos taken due to tight security)
The Supply Chain Management Guide
Mobile Dust Suppression Sprinkling Trolley by Oasis Irrigation Equipment Co Ltd P-6,Scheme-VI, M(S), C.I.T, Kolkata –
3rd Quarter Safety Meeting 2012 DOT Roadside Inspections.
SOS Health Check Objective To Measure Workflow, Capacities, Equipment, Behaviors & KPI’s that enable stores to deliver on the U25 delivery Promise.
Better Health. No Hassles. Working Safety. Better Health. No Hassles. Why is working safely important?
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Developing the Program Module 5.  Different aspects of the ITCP will be identified and developed during the various construction phases of a project.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
4/1/20101 Contractor Management of Change: Implementation of Vehicle and Equipment Spotting Pre-Task Analysis Card Start Date: May 2010 Texas Operations.
Warehouse Procedure. Receiving Cargo EASTRONGWarehouse Notice SuppliersSend cargo to warehouse.
How would a truck get through? Any suggestions?. No parking allows access.
Depreciation 1. © Hodder Education 2008 Depreciation Depreciation is the apportioning of the cost of a fixed asset over the life of the asset.
UNIT-IV Shop Floor Control and Flexible Manufacturing Systems
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
June 3 rd – 5 th.  71,630 trucks were inspected  47,771 of those was level 1 inspections.  24.1% (11,513) of level 1 inspections resulted in OOS (Out-of-Service)
Partial lesson 15 of 32 slides Trip Planning and Map Reading.
Tesco Grocery online – our journey September 2010.
Mailing Industry Changes ® PCC Workshop-in-a-Box Module 4 PCC Workshop-in-a-Box Module 4.
SILOSACK The Collapsible Seed Bin. SILOSACK Why the SILOSACK? Lower Cost to Purchase and Operate – 46% Savings on the purchase price compared to our.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Renub Research Table of Contents 1. Executive Summary 2. Global Electric Vehicles Market (2012 – 2020) 3. Global Electric Vehicles Share.
June 30, Agenda Review new postal rates for May 11, Update on SMDS Energy Savings Plan. Post Office Boxes on zip code Interoffice delivery.
GSA Engineering How to Spec a Medium Van Truck Peter Mielke GSA Engineering – Medium and Heavy Vehicles
Warehousing and Storage Principles Session 7 – Fully Loaded Day 4 / AM.
PRESORT OPTIMIZATION WORK GROUP November 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
Moving from one home to the other can become really stressful and complicated, especially when you do not have the right moving supplies to work with.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
CONSTRUCTION TRAFFIC MANAGEMENT BY COLDROP. WHAT IS TRAFFIC MANAGEMENT ? Traffic management is the control of pedestrians, vehicles and plant that are.
CNG Competitor Analysis April Quad Axle Trailer +PPE +Remember +Permitting Requirements +Pre-Trip / Post Trip +Operation +Scaling.
An idea for the future of logistics...
Outbound Process Using Wave, Pick-HU, Packing, Staging, and Loading
Malheur Lumber Company
Table of Contents I Target II Possible Solutions
Setting-up MSU & Equipment handling
Delivery the TPG Way The TPG is the Dutch Post Office who are in a joint venture with TNT.
WHAT TO DO IF PULLED OVER BY AUTHORITIES IN THE UNITED STATES
Waste Collection.
Dismissal Staff Quick Start Guide
Pitch for music video By Ewan Phillips
Manufacturing Planning
Delivery the TPG Way The TPG is the Dutch Post Office who are in a joint venture with TNT.
HSE Tips for Site / Field Visit
WHAT TO DO IF PULLED OVER BY AUTHORITIES IN THE UNITED STATES
Evaluating and Improving a Manufacturing System Mock Preparation
JIR-The mail comes to main street(JYBOOKS.COM)
PROPER USE OF FLOOR JACK AND SAFETY STANDS
CONSTRUCTION TRAFFIC MANAGEMENT
9 PODs 1 CHACON MRV. 9 PODs 1 CHACON MRV transportation Specifications.
PG&E EV Fleet Program.
Year 6: Marwell Activity Centre RESIDENTIAL
PG&E EV Fleet Program.
Visual Guide for Set-Up
Presentation transcript:

Norway Benchmarking Trip June 2015 Mail Centre showing letters in trays to be sequenced or already sequenced.

Norway Benchmarking Trip June 2015 Mail Centre showing Delivery Preparation Frames. These are used throughout the night to prep 5 walks.

Norway Benchmarking Trip June 2015 Close up of Delivery Preparation Frame. All frames are made up of 4 same size wings.

Norway Benchmarking Trip June 2015 This shows the Delivery Prep Frame with mail already being prepared.

Norway Benchmarking Trip June 2015 This shows the Delivery Prep Frame with the buttons used to raise and lower the whole frame.

Norway Benchmarking Trip June 2015 This shows the mobile cage used for packets and large flats etc.

Norway Benchmarking Trip June 2015 All ties and wraps etc are placed in the recycle bags.

Norway Benchmarking Trip June 2015 These are the vans used for delivery. They are singleton vans. All empty trays are placed in the storage area shown behind the people following completion of the delivery. Time is built into duties for this task.

Norway Benchmarking Trip June 2015 Inside of vehicle showing layout next to driver for the storage of mail.

Norway Benchmarking Trip June 2015 Vehicle is parked under sheet showing delivery route number (above) ready for mail to be loaded for delivery.

Norway Benchmarking Trip June 2015 Vehicle is parked under sheet showing delivery route number (above) ready for mail to be loaded for delivery.

Norway Benchmarking Trip June 2015 Card in vehicle shows delivery route number.

Norway Benchmarking Trip June 2015 Alternative delivery vehicles.

Norway Benchmarking Trip June 2015 Alternative delivery vehicles. This time at the actual delivery unit in Oslo.

Norway Benchmarking Trip June 2015 Alternative delivery equipment. Electric Trolleys plugged into the wall behind overnight for charging at the delivery unit in Oslo.

Norway Benchmarking Trip June 2015 Alternative delivery equipment. Another version of Electric Trolleys also plugged into the wall behind overnight for charging at the delivery unit in Oslo.

Norway Benchmarking Trip June 2015 The operation is very slick. Mail is offloaded into the delivery unit and then segregated into the respective walks, all in trays and on pallets.

Norway Benchmarking Trip June 2015 The Mail is then loaded into the delivery vehicles in the yard using pallet trucks.

Norway Benchmarking Trip June 2015 The Mail is then loaded into the delivery vehicles in the yard using pallet trucks.

Norway Benchmarking Trip June 2015 The Mail is then loaded into the delivery vehicles in the yard using pallet trucks.

Norway Benchmarking Trip June 2015 There are high volumes of unaddressed mail (D2D)

Norway Benchmarking Trip June 2015 This shows the OMP vest and how not to do it. Only saw 2 people wearing the vest.