J.-P. Riunaud AB/ABP ABP Group Meeting 10-12-2003 ABP Group Meeting 1 1. The ABP Group in 2003 2. What will happen 2004.

Slides:



Advertisements
Similar presentations
Management’s preliminary comments to the ERC Report.
Advertisements

SCIENTIFIC ACTIVITIES AND BUDGET ESTIMATES FOR 2007 AND PROVISIONAL PROJECTIONS FOR THE YEARS AND LONG-TERM PERSPECTIVES White Paper Robert Aymar.
BE-ABP-Group Meeting ABP Group 1 ABP group structure Main goals for this meeting: Excuse for getting together in mid-term + LHC and project update + administrative.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
FAIR GmbH and FAIR Project History, Status and Outlook
28/09/2006MG – ABP General meeting1 HIGHLIGHTS OF LOC ACTIVITIES IN 2006 M. Giovannozzi on behalf of LOC members Ralph Assmann Chiara Bracco Helmut Burkhardt.
Learning and Development at CERN Sudeshna Datta-Cockerill.
Role of Management and Technical Coordination
The new MEF Group S. Baird 12 th December The new MEF Group Mandate for the MEF Group MEF structure Support for LHC experiments Formal meetings/committees.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
CERN HR Department Personnel Management and Development Training and Development at CERN Sudeshna Datta Cockerill Davide Vite.
CERN Enrico CHIAVERI Head, Human Resources Department 22 June 2009.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Career Opportunities at CERN for students and recent graduates HBO lectoren visit SIA/CERN/NIKHEF Ingrid Haug Section Leader Students and Associates,
J.-P. Riunaud PS/AE PSMB 16/09/2002 Report from 59 th SPSC meeting 03/09/2002 OPEN SESSION on Tuesday, 3 September 2002 at 09:00, Main Auditorium 1. Proposal.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
PS Days, January 2001 The “Plan” B.W.Allardyce The Medium Term Plan is presented at the June FC meeting by the Management and covers 4 years (I.e. in June.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
R.Schmidt TE-MPE-PE: members of the section Michael Jonker Mike Koratzinos Rüdiger Schmidt Daniel Wollmann – from 1 st November 2011 Arjan Verweij Carlos.
Davide Tommasini Status and prospects of the PS magnet consolidation program ATOP Days March 4 th – 6 th 2009 Status and prospects of PS magnets programs.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Medium Term Plan, with a Long Term Projection to 2010 L. Maiani. CERN Finance Committee June 19, 2002.
Technology Department WP2 Progress Report Th. Otto
General Information New members in ABP (RTL): –M. Samson Restructuring should be finalized by the end of the year to be effective for beginning of the.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
GMS (General Management & Secretariat) Group Meeting 10-jan-12.
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18 th November 2013.
Lucie Linssen, CLICdp, bi-monthly meeting, 3 Aug General news CLICdp monthly meeting August 3 rd 2015.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
10 December 2015 – Plenary Session COFUND & CERN: furthering career development opportunities in Big Science Seamus Hegarty, CERN Synergies to fuel Researchers’
HL-LHC Organization: Now and post HiLumi
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
PS Division - Manpower situation Present situation Estimation of the needs The Staff Plan Staffing forecast Conclusions PS days - 26/01/01 - jb J. Boillot.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
JINR-CERN 5-years Partnership Program N.Russakovich 103-rd session of theJINR Scientific Council meeting JINR, Dubna, 21 February 2008.
14/01/2005M. Giovannozzi - PS-SPS Days1 When can we have a clean Multiturn Extraction from the PS? M. Giovannozzi M. GiovannozziContentIntroduction Summary.
HELWAN UNIVERSITY Faculty of engineering Biomedical department Hospitals Organization and administrative structure :Presented by : Sara Mousa Ismail Dr\Mohammed.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
O. Kester, NuSTAR annual meeting, 27/02/2013
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
FREIA Division for Accelerator and Instrumentation Development
I. Bergevoet - Training preparation
ICE SECTION The coolest place to be! Elias Métral
Career Opportunities at CERN
Learning and Development at CERN
AB-ABP Group Meeting Introduction and motivation
Looking back on 2014 and Perspectives for the MPE Group in 2015
Ways to industry participation in CLIC 24th October, 2017
Installations, modifications, consolidation in 2005:
Veksler and Baldin Laboratory
BE/ABP Group Meeting 2017 G. Arduini.
Module 3 Organization Overview
Technical Support Activities in PH-ADO-PO
New Group Structure (from 1/2/2007)
ABP/RTL Main RTL Activities for 2007/8:-
Presentation transcript:

J.-P. Riunaud AB/ABP ABP Group Meeting ABP Group Meeting 1 1. The ABP Group in What will happen 2004

J.-P. Riunaud AB/ABP ABP Group Meeting ABP Group Organigramme L. Rinolfi R. Brown M. Gevrey 2 C. Lacroix J. Monteiro S. De Man B. Pires A. Spinks R. Scrivens G. Bourgeois B. Hadorn C. Hill D. Kuchler H. Kugler (01/04) C. Mastrostefano M. O’Neil F. Wenander K. Schindl B. Autin (50%) H. Braun C. Carli M. Chanel H. Haseroth J. Jowett A. Lombardi (50%) M. Martini G. Arduini O. Berrig 3 H. Burkhardt R. Corsini M. Giovannozzi (50%) J.- Y. Hémery E. Métral O. Bruning B. Autin (50%) R. Assmann S. Fartoukh M. Giovannozzi (50%) J.- B. Jeanneret A. Lombardi (50%) T. Risselada F. Schmidt A. Verdier F. Ruggiero E. d’Amico W. Herr D. Schulte F. Zimmermann F. Ruggiero J.- P. Riunaud J. Thomashausen (AB/ADM) Rings & Transfer Lines Hadrons Sources & Linacs LHC Low Energy Injectors LHC Optics & Commissioning LHC Collective Effects LHC High Energy Injectors Several staff members contribute to several sections. Only those at 50% are indicated M. Vitasse 1 M. Cayla 1 2 (1) : 100% detached to EST/IC (2) : 80% detached to EST/IC (3) : 100% detached from AT/IC (01/11/03-31/03/04)

J.-P. Riunaud AB/ABP ABP Group Meeting ABP “External” Staff 3 AB/ADM/sln Situation 30 November 2003 FELLOWS Arrival End of Contract Supervisor FORSTNER O. 01/01/ /12/2003 Braun H.H. FRITIOFF K. 01/10/ /09/2004 Hill C.E. PASTERNAK J. 01/11/ /10/2004 Carli C. REDAELLI S. 01/01/ /12/2004 Assmann R. SAKUMI A. 01/04/ /03/2004 Giovannozzi M. VOGEL E. 1/07/ /06/2005Ruggiero F. PAID SCIENTIFIC ASSOCIATES Arrival End of Contract Supervisor BAICHEV I. 01/10/ /09/2004 Jeanneret B. SARGSYAN E. 1/01/ /06/2004Lombardi A. DOCTORAL STUDENTS Arrival End of Contract Supervisor BENEDETTO E. 01/02/ /05/2004 Zimmermann F. ELIASSON P.01/01/2004D. Schulte KOSCHIK A. 1/09/ /02/2004 Ruggiero F. LEMUET F. 1/01/ /12/2005 Haseroth H. LIFSHITZ R. 01/01/ /06/2004Schulte D. PIELONI T.01/03/2004Herr W. REDAELLI S. 01/01/2001 1/12/2003 Ruggiero F. RESTA LOPEZ J.01/01/2004D. Schulte ROBERT-DEMOLAIZE G. 01/11/ /10/2004Assmann R. STEINER T. 01/10/ /10/2004 Kuchler D. WITTMER W. 01/11/ /04/2004 Ruggiero F.

J.-P. Riunaud AB/ABP ABP Group Meeting ABP “External” Staff (ct’d) 4 AB/ADM/sln Situation 30 November 2003 TECHNICAL STUDENTS Arrival End of Contract Supervisor CHAMINGS J. 01/01/ /12/2003 Scrivens R. COCO V. 16/02/ /04/2004 Lombardi A. SCARAMUZZI P. 01/01/ /02/2004 Giovannozzi M. WAARUM I.K.01/01/200431/12/2004Jeanneret B. ANDRESEN C.A.01/02/2004Scrivens R. HOLTSCHNEIDER01/05/2004Jowett. J UNPAID SCIENTIFIC ASSOCIATES Arrival End of Contract Supervisor BISCARI C. 01/11/ /10/2004Corsini R. EDGECOCK R. 01/06/ /05/2004 Haseroth H. FERRARI A. 01/12/ /11/2004 Rinolfi L. FRANCHETTI G. 01/04/ /03/2004 Lombardi A. GHIGO A. 01/11/ /10/2004 Corsini R. GILARDONI S. 01/10/ /09/2004 Lombardi A. HOFMANN I. 01/10/ /09/2004 Martini M. JONES F. 07/10/ /10/2004 Ruggiero F. KALTCHEV D. 16/11/ /11/2004 Ruggiero F. KONDRASHEV S. 01/08/ /07/2004 Kugler H. KOROSTELEV M. 01/09/ /08/2004 Ruggiero F. MEOT F. 1/11/ /10/2004 Haseroth H. PRIOR C. 01/05/ /04/2004 Riunaud J.P. SHARKOV B. 01/04/ /03/2004 Kugler H. SPATARO B. 25/08/ /08/2004 Ruggiero F.

J.-P. Riunaud AB/ABP ABP Group Meeting ABP Activities Distribution (Staff Members) 5 LIN/PSB/PS SPS LHC Machine R&D Low Energy Facilities LHC Injectors

J.-P. Riunaud AB/ABP ABP Group Meeting ABP Staff Plan 6 Estimated Departures (Known informations + Some hypothesis - HR model) ABP Staff evolution Work Plan (from Medium Term Plan, taking 2003 as reference) ABP evolution of man-power resources requirements Mismatch Posts requests Engineers3737 2Technicians 2 posts accepted (Accel. Phys.) : 1 internal mobility 1 open vacancy

J.-P. Riunaud AB/ABP ABP Group Meeting CERN Organisational Structure 7 AT AB

J.-P. Riunaud AB/ABP ABP Group Meeting The Present CERN 15 Divisions 8 AB Accelerators and Beams AC Directorate of Accelerators AS Administrative Support AT Accelerator Technology DSU Directorate Service Unit EP Experimental Physics EST Engineering Support and Technologies ETT Education and Technology Transfer FI Finance HR Human Resources IT Information Technology SPL Supplies, Procurement and Logistics ST Technical Support TH Theory TIS Technical Inspection and Safety

J.-P. Riunaud AB/ABP ABP Group Meeting CERN New organisation 9 CERN Structure and Organisation Short links inside management lines - Confidence in exercise of responsibilities No more a priori control - Collective responsibilities No more sector isolation   Directors/Departments/Project/Secretariat General Excecutive Board (Directors, Dept Heads, LHC Proj. Leader, Secr. Gl) CERN Institution and Council Supervision CERN Laboratory No more Committee of Council ? Steering of European HEP activities

J.-P. Riunaud AB/ABP ABP Group Meeting CERN Structure in 2004 DG Chief Executive Officer Deputy DG Chief Scientific Officer Chief Finance Officer Human Resources Finances Accel. & Beams Accel. Technology Tech. Support Information Technology Department of Physics

J.-P. Riunaud AB/ABP ABP Group Meeting Scientific programme To be presented to Council in December Main Features 11 Keywords Savings in human/material resources Improving committees/boards efficiency Follow-up of progress Effective relations between Directors & Departments/Head of projects Direct/short connection Face to face review issues Personnel management - Financial “mobility” P+M : [Personnel + Material] budget (within +- 3%) - Reform to increase motivation/promotion to merit - Adaptation to programme change

J.-P. Riunaud AB/ABP ABP Group Meeting Heads of Department are process owners and budget holders …. 12 Directorate assigns to the Departments resources (P+M) to participate : - in the achievements of CERN objectives (projects) - in the maintenance of functional service to the whole organization Project Leaders - Supervise work progress (scheduling, spending) through standard tools (EVM) - Report to the Directorate

J.-P. Riunaud AB/ABP ABP Group Meeting List of AB Division Priorities 1. LHC Protonsincluding Proton Injectors 2. PS and SPS LHC Test Beams 3. LHC Ionsincluding Ion Injectors 4. PS and SPS PhysicsAD, ISOLDE, nTOF, etc. 5. CNGS 6. PS and SPS performance upgradeHIP 7. R&D 7.1 CLIC CTF3 7.2 SPL 7.3 NuFact 7.4 ESGARD 8. TERA From ABMB

J.-P. Riunaud AB/ABP ABP Group Meeting Basic Programme Fixed Target Physics (future) Neutrino Physics Low Energy Facilities No preventive maintenance (minimum consolidation) Medium Term Plan (MTP) LHC Project LHC Machine & Test Beams LHC Injectors Ions for LHC Features Present Work Programme 90% 10% Coord. Accel. R&D in Europe (ESGARD/CARE) First priority : “Focus on LHC” 3. R&D CLI/CTF3 Other R&D Performance upgrade studies (new multi-turn extraction)

J.-P. Riunaud AB/ABP ABP Group Meeting Basic Programme Fixed Target Physics (future) Neutrino Physics Low Energy Facilities Medium Term Plan (MTP) LHC Project LHC Machine & Test Beams LHC Injectors Ions for LHC No preventive maintenance ? Consolidation programme Special allocation for 2004/05 Features Future (?) Work Programme First priority : “Focus on LHC”

J.-P. Riunaud AB/ABP ABP Group Meeting Problems PS Main Magnets at 2003 start-up Broken threaded bolt of pole clamp on MU 31 © T. Zickler AT/MEL PS Main Magnet Unit Damaged insulation of MU20 bus bar Insulation of MU 06 bus bar which has been replaced preventively.

J.-P. Riunaud AB/ABP ABP Group Meeting Insulation Breakdowns on PS Magnet Units Insulation breakdown on MU06Insulation breakdown on MU19 Both Units have been replaced © T. Zickler AT/MEL

J.-P. Riunaud AB/ABP ABP Group Meeting Drain Problems in TT20 18

J.-P. Riunaud AB/ABP ABP Group Meeting Basic Programme Fixed Target Physics (future) Neutrino Physics Low Energy Facilities Medium Term Plan (MTP) LHC Project LHC Machine & Test Beams LHC Injectors Ions for LHC No preventive maintenance ? Consolidation programme Special allocation for 2004/05 Features Future (?) Work Programme First priority : “Focus on LHC” Performance upgrade studies New multi-turn extraction project ?

J.-P. Riunaud AB/ABP ABP Group Meeting Medium Term Plan (MTP) R&D CLI/CTF3 Other R&D Features Future (?) Work Programme 90% ? + 10% ? Coord. Accel. R&D in Europe (ESGARD/CARE) Speed up CTF3 completion (2009) with “ à la carte” resources More collaborations with other laboratories Should include LHC upgrade (Luminosity/Energy) and p+ injectors complex upgrade (Linac4, SPL)

J.-P. Riunaud AB/ABP ABP Group Meeting & after 21 Globe of innovation + Common Control Center + New Council room CERN’s 50 th anniversary in 2004