1 With the increase in solar and wind generation we would like to stream line the process Currently TDSPS are required to send ERCOT ESI ID Generation.

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

PV Market Trends and Technical Details. All of US has Suitable Solar Resource for Large Scale PV Deployment.
A Solar Generation Forecasting System for ERCOT Where Would the Data Come From? Jay Zarnikau | President Steve Wiese | Senior Consultant, Energy Efficiency.
1.  An inadvertent issue begins upon the discovery of an Inadvertent Gain or Move-In transaction submission. Upon identification of an Inadvertent Gain.
Room Selection Process Main Menu View Select Residence Life and Housing.
In an internet browser type: If you have never used this software before, click on create an account. If you have used ilrn, click on Sign.
Lesson 25: Solar Panels and Economics of Solar Power
Renewable Energy as Priority
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
2009 Bidders Workshop Attachment D August 3, 2009.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
1 Transaction or Issue Clean Up. 2 Linked-Address Issue Multiple ESI IDs Linked to a Single Service Address Record Background Counts Matrix Completed.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
1 RMS Task Force on Retail Market Customer/ESI Transition October 16, 2003.
1 RMS Update - ERCOT June 10, Supporting Reports Section.
ERCOT MARKET EDUCATION
MARS Taskforce COPS Update May 12, Execution MilestonesBaseline DateStatus Technical Architecture Complete 05/15/2009On Schedule Development Complete07/24/2009On.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Step by Step Instruction: How to Conduct Direct Certification using File Upload: Standard Format Released January 2014 “How to Conduct Direct Certification.
Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant
August 30, 2012 Modeling Solar, Storage and Inverter based resources John Adams Resource Integration Planning Working Group.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
02/13/2009 RPG Wind Interconnection Survey Dan Woodfin Director, System Planning.
LRS Progress Report and Action Plan Update to the Profiling Working Group July 24, 2006.
Design, Construction and Application of Cookstove Cages, Solar Driers and Solar Water Heaters.
October 15, 2012 PV & Storage Workshop PV and Storage Integration strawman proposals & discussion John Adams Principal Engineer.
MARS 867_03F ROR vs. Settlement vs. 810 Scenarios ERCOT September 2008.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
DRG Slides for PWG Update to COPS. 2 Highlights from the DGTF Recommendation - 3 Small DRG applies to generation less than 50 kW –Profiling is applicable.
Distributed Renewable Generation Profile Implementation Plan.
Profiling Working Group June 15, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting June 15, 2005.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
February 10, 2010 RMS ERCOT 1/24/10 Production Issue Overview and Lessons Learned Karen Farley Manager, Retail Customer Choice.
1 TX SET Mass Transition Project RMS Update March 15, 2006.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
1DRAFT for DISCUSSION Transition From Non-IDR to IDR Load Profile and LSE 15-minute Data for AMS Market Advanced Readings and Settlements Taskforce 10/9/09.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
AEP ONCOR TNMP TDSP AMS Data Practices Summary TDSP_AMS Data Practices Summary.ppt CenterPoint.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
2006 CDR Status Report Technical Advisory Committee May 4, 2006 Bill Bojorquez.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
Oil and Gas Profile Implementation Plan. 2 BUSOGFLT Background ERCOT received Oil and Gas Profile Segment request ERCOT completed.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 2/26/15 Asish Gautam Demand Analysis Office Energy Assessments Division.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
MarkeTrak Issue Resolution Tool Retail Market Participant Workshop.
Selling your renewable electricity Stuart Stephens, Commercial Director e-POWER the best price for your power.
Hypothetical Examples of How Residential Photovoltaic (PV) ESI IDs Could be Settled ERCOT Load Profiling.
Market Metrics RMS March 13 th, 2002 ERCOT MetCenter.
LRS Progress Report to the Profiling Working Group March 27, 2007.
Distributed Generation Chau Nguyen, Pricing & Sales Support
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
Multiple ESI IDs Linked to a Single Service Address Record Linked-Address Action Items.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
November 17, 2014 ERCOT AMS Data Loading Result Code Descriptions & Distribution AMS Workshop IV.
MARS Taskforce RMS Update December 9, 2009.
Instructions How to upload a draft document for ballot
Presentation transcript:

1 With the increase in solar and wind generation we would like to stream line the process Currently TDSPS are required to send ERCOT ESI ID Generation type, e.g., PV, wind, other (specify) Interconnection Agreement effective date Total inverter capacity (if applicable and available) The inverter's published peak efficiency rating (if applicable and available) If PV generation is present: Total PV generation capacity in kW (DC) If wind generation is present: Total wind generation capacity in kW (DC) If generation other than PV or wind is present: Type(s) of units Total generation capacity in kW (DC) Most TDSPs are send ERCOT the required information once or twice a month, however, each TDSP sends it in a different form. Reminder, we are requesting information on all DG’s regardless of capacity value.

1 It would be most helpful in streamlining the process of these requests and the information contained within, if all the TDSPS could use a generic form so that all the information is coming in the same formats The worksheet can be created in a meeting or created by ERCOT Things that would be helpful One column for the full ESI ID PV-for solar Wind-for Wind IA Date in MM/DD/YYYY format All columns filled in If unknown, or not applicable, please leave blank (no N/A)

1 Lastly… Additional generation As of right now, I do not think premises are required to report additional generation Should it stay that way? How large of an impact will additional generation have on load forecasting? How should the additional generation be reported?