OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

Open Access Pune Power Development Pvt. Ltd.. Contents:  Terminology  Open Access  Requirements for Open Access  Provisions made in Electricity Act.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
O POWER TRADING o OPEN ACCESS o CAPTIVE GENERATION BHANU BHUSHAN Director (Operations ) Power Grid Corporation of India Ltd.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
Settlement system of Bilateral transactions under Open Access
1 A Staff Presentation Developing a Common Platform for Electricity Trading RAVINDER Chief (Engineering) Central Electricity Regulatory Commission 7 th.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Open Access and Trading. Trading “Trading" means purchase of electricity for resale thereof” Any person is allowed to undertake trading in electricity.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “Open access” means the non-discriminatory provision.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
CERC Paper on Open Access Presentation by the MPERC Bhopal At New Delhi 25 September 2003.
Open Access In Interstate Transmission system
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
OPEN ACCESS EXPERIENCES and WAY AHEAD N.R.C BABU CHIEF MANAGER (MO), SRLDC, POWERGRID
1 APPROPRIATE PRICING OF TRANSMISSION A PRESENTATION BY SRLDC, BANGALORE.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
OPEN ACCESS EXPERIANCES AND WAY AHEAD ON V K Agrawal, General Manager IN WORKSHOP ON GRID SECURITY AND MANAGEMENT.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
11/27/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
Sharing of Inter-State Transmission Losses 11/29/
12/7/2015 NRLDC: POSOCO 1 Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009)
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Power Trading Corporation Of India Ltd. Mahendra Kumar Director, Power Trading Corporation of India Ltd. Power Trade Perspective.
Renewable Regulatory Fund (RRF):- Implementation Mechanism
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
OPEN ACCESS EXPERIANCES AND WAY AHEAD ON V K Agrawal, General Manager IN WORKSHOP ON GRID SECURITY AND MANAGEMENT.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Settlement system for Collective Transactions (Power Exchange)
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Transmission Tariff Regulations. 1. ‘Applicant’ means a generating company or transmission licensee who has made an application for determination of tariff.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Open Access Power Purchase
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
“ Open access / Power Exchange Regulations/experiences of SR ”
Sharing of Inter-State Transmission Losses
IN INTER-STATE TRANSMISSION
E-bidding for Short Term Open Access by – S
Settlement system under Open Access
OPEN ACCES IN INTER-STATE TRANSMISSION.
Presentation transcript:

OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008

OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “Open access” means the non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission;” “Open access” means the non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission;”

CERC Open Access Regulations, Subject to any other regulations specified by the Commission, the long-term customer shall have first priority for using the inter-State transmission system for the designated use. These Regulations shall apply for utilization of surplus capacity available thereafter on the inter-State transmission system by virtue of- (a) Inherent design margins; (a) Inherent design margins; (b) Margins available due to variations in power flows; (c ) Margins available due to in-built spare transmission capacity created to cater to future load growth or generation addition:

CERC Open Access Regulations, 2008 Effective Effective Regulations cover only Short-term Open Access Regulations cover only Short-term Open Access Transactions categorized as Bilateral and Collective (through PX) Transactions categorized as Bilateral and Collective (through PX) Earlier Products of Short-Term retained under Bilateral Transactions Earlier Products of Short-Term retained under Bilateral Transactions Nodal Agency Nodal Agency Bilateral : RLDCs Bilateral : RLDCs Collective : NLDC Collective : NLDC

CERC Open Access Regulations, 2008 Transmission Charges moved from “Contract Path” to “Point of Connection” Transmission Charges moved from “Contract Path” to “Point of Connection” Both Buyers and Sellers of Collective transactions to bear transmission charges and absorb transmission losses Both Buyers and Sellers of Collective transactions to bear transmission charges and absorb transmission losses Inter-Regional links -No Separate treatment. Inter-Regional links -No Separate treatment. Emphasis on “Scheduling” rather than “Reservation” Emphasis on “Scheduling” rather than “Reservation” SLDC consent mandated along with application SLDC consent mandated along with application In case of Congestion – e-Bidding without Price Cap In case of Congestion – e-Bidding without Price Cap Exit Option provided with payment of up to 5 days open access charges. Exit Option provided with payment of up to 5 days open access charges. Moving towards empowerment of SLDCs Moving towards empowerment of SLDCs

Regulation 2004 of CERC Regulations on Short-Term Open Access Open Access Duration - Up to One year maximum -single application possible ST Rate - in Rs/MW/Day - Min. Charges for one day Transmission Charges a. Intra Regional – 25% of Long Term Charges b. Inter Regional – 25% of Long Term Charges Operating Charges a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 3000/day for each RLDC involved – Rs. 3000/day for each SLDC involved c. Handling &Service Charges - 2% of total charges ( to )

Regulation 2004 (Amendment 2005)of CERC Regulations on Short Term Open Access Open Access Duration - Up to three months -single application possible ST Rate - in Rs/MW/Day - Charges as per continuous block of up to 6 hours, 12 hours, and more than 12 hours Transmission Charges a. Intra Regional – 25% of Long Term Charges b. Inter Regional – 50% of Long Term Charges Operating Charges a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 3000/day for each RLDC involved – Rs. 1000/day for each RLDC involved c. Handling &Service Charges - Nil ( to )

Regulation 2008 of CERC Regulations on Short Term Open Access Open Access Duration - Bilateral -Up to 3 months separate application for each month - Bilateral -Up to 3 months separate application for each month - Collective: -Only Day ahead ST Rate - in Rs/MWh - Based on Scheduled Energy - in Rs/MWh - Based on Scheduled Energy Transmission Charges Bilateral: Bilateral: Rs.30/MWh – intra- regional Rs.60/MWh – Between adjacent regions Rs90/MWh – Wheeling through one or more region Collective Transactions (Px): -Rs. 30/MWh for each point of injection and drawal (From )

Regulation 2008 of CERC Regulations on Short Term Open Access Operating Charges Bilateral: Bilateral: a. Application fee – Rs. 5000/- a. Application fee – Rs. 5000/- b. Scheduling Charges b. Scheduling Charges – Rs. 2000/day for each RLDC involved – Rs. 2000/day for each RLDC involved – Rs. 2000/day for each SLDC involved – Rs. 2000/day for each SLDC involved c. Handling & Service Charges –Nil c. Handling & Service Charges –Nil Collective Transactions: a. Application fee – Rs. 5000/- b. Scheduling Charges b. Scheduling Charges – Rs. 5000/day to NLDC for each State involved ; – Rs. 5000/day to NLDC for each State involved ; -NLDC to Share with RLDCs -NLDC to Share with RLDCs Contd …

Comparison of CERC Regulations on Short-Term Open Access (Regulation 2004, Amendment 2005 and Regulations 2008) S.No. Old Regulations Old Regulations ( to ) Amended Regulations Amended Regulations (w.e.f to (w.e.f to ) ) Regulations, 2008 (w.e.f ) Open Access Duration - Up to One year maximum - single application possible Open Access Duration - Up to Three Months max. - single application possible Open Access Duration Bilateral -Up to 3 months - separate application for each month - Collective: - Only Day ahead ST Rate - in Rs/MW/Day - Min. Charges for one day ST Rate - in Rs./MW/Day -Charges as per continuous block of up to 6 hours, 12 hours, and more than 12 hours Rate -in Rs/MWh - Based on Scheduled Energy

Comparison of CERC Regulations on Short-Term Open Access (Regulation 2004, Amendment 2005 and Regulations 2008) S. N o. Old Regulations Old Regulations ( to ) Amended Regulations Amended Regulations (w.e.f to (w.e.f to ) ) Regulations, 2008 (w.e.f ) Transmission Charges a. Intra Regional – 25% of Long Term Charges b. Inter Regional – 25% of Long Term Charges Transmission Charges a. Intra Regional – 25% of Long Term Charges b. Inter-Regional - 50% of Long Term Charges Transmission Charges: Bilateral: - Rs.30/MWh – intra- regional - Rs.60/MWh – Between adjacent regions - Rs90/MWh – Wheeling through one or more region Collective Transactions (Px): -Rs. 30/MWh for each point of injection and drawal Operating Charges a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 3000/day for each RLDC involved – Rs. 3000/day for each SLDC involved c. Handling &Service Charges - 2% of total charges Operating Charges a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 3000/day for each RLDC involved – Rs. 1000/day for each RLDC involved c. Handling & Service Charges – Nil Operating Charges Bilateral: a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 2000/day for each RLDC and SLDC involved c. Handling & Service Charges -Nil Collective Transactions: a. Application fee – Rs. 5000/- b. Scheduling Charges – Rs. 5000/day to NLDC for each State involved ; -NLDC to Share with RLDCs

UI vs STOA market (All regions) 5% UI market 3% STOA market 100% power market 92% long term market

All India basis

STOA – EXPERIANCES Applications Processed Applications Processed (Since Beginning) > 20,000 No. (Since Beginning) > 20,000 No. Volume (Approved Energy) Volume (Approved Energy) (Since Beginning) > 90BUs (Since Beginning) > 90BUs Applications Approved > 95 % Applications Approved > 95 % Refusal/Non-consent by SLDCs Refusal/Non-consent by SLDCs > 3 - 4% Refusal due to system constraints Refusal due to system constraints < 0.5 % < 0.5 %

STOA – EXPERIANCES Transactions between extreme corners of the country Transactions between extreme corners of the country RGCCPP ( Kayamkulam) to PSEB Arunachal Pradesh(NER) to PSEB TNEB to J&K Large number of Captive Generating plants used STOA and helped in enhancing the power availability in grid. Large number of Captive Generating plants used STOA and helped in enhancing the power availability in grid. Ugar Sugars (KAR) - JAIPUR (RAJASTHAN) Godavari Sugars (KAR) - MSEDCL NCS Sugar(ANDHARA) – GUVNL Indorama ( MAH) – APPCC ( ANDHRA) Indorama ( MAH) – APPCC ( ANDHRA)

STOA – EXPERIANCES Due to High demand in the regions, the costly power has been traded through STOA Due to High demand in the regions, the costly power has been traded through STOA RGCCPP ( Kayamkulam) (NAPTHA) to PSEB BSES(KERALA) (DIESEL) to NDMC (DELHI) Diversity being gainfully utilised by Market players under STOA Diversity being gainfully utilised by Market players under STOA Generators PLF has also increased. Generators PLF has also increased.

Issues Skewed load – generation levels Skewed load – generation levels Increased line loading Increased line loading Consents by STU/SLDC for injection of power by embedded customers Consents by STU/SLDC for injection of power by embedded customers Telemetry Telemetry Metering Metering Scheduling Scheduling PPAs PPAs

Empowering SLDCs UI Settlement of Intra state entities UI Settlement of Intra state entities Before the Implementation of Open Access Regulations 2008, for deviations Various STU/SLDCs are charging differently for embedded customers. In the New Open Access Regulations the issue is addressed Before the Implementation of Open Access Regulations 2008, for deviations Various STU/SLDCs are charging differently for embedded customers. In the New Open Access Regulations the issue is addressed Functional Autonomy of SLDC Functional Autonomy of SLDC

Typical Approvals- Captive Power Plants Typical Approvals- Captive Power Plants Captive Power Plant Quantum( MW) Eastern Region NBVL(OPTCL)27 SAIL-DSP(DVC)20 TISCO(DVC)60 Bhushan Steel 25 J.P Cement (Rewa) 5 Western Region Indo Rama synthetics 22 PSKL10-30 Southern Region Renuka Sugar 25 Vishwanath Sugar 7.5 Godavari Sugar 25 Ugar Sugar 25 Jindal Steel 200 Nav Bharat 50 NCS Sugar 13

TYPICAL STOA CASE - 1 TYPICAL STOA CASE - 1 APTRANSCO to MPSEB 100 MW for One day from 0000 to 0600 hrs.

APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0600 HRS ) 100 MW AT INJECTION POINT for 1 day INJECTING UTILITY APTRANSCO CUSTOMER: NVVNL DRAWEE UTILITY MPSEB CAPACITY APPROVED 100 MW DAILY PERIOD HRS AP WR GRID MP HVDC BACK TO BACK AT BHADRWATHI IN WR INTERVENING REGIONAL LINK 1.SR-WR TRADER: NVVNL

APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0600 HRS ) 100 MW AT INJECTION POINT for 1 day EXPORT AT AP 100 MW AT SR PERIPHERY 96.9 MW MP RECIEVES 93.0 MW LOSSES IN SR 3.12% LOSSES IN WR 4% TOTAL LOSSES FOR TRANSACTION 7.0 MW AP WR GRID MP HVDC BACK TO BACK AT BHADRWATHI IN WR CTU

APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0600 HRS ) 100 MW AT INJECTION POINT for 1 day APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION TRANSMISSION CHARGES PER MW PER DAY 1.Rs FOR CTU-SR 2.Rs FOR SR-WR LINK 3.Rs FOR CTU-WR TOTAL TRANSMISSION CHARGE PER UNIT 34.53Ps/. SCHEDULING CHARGES PER DAY 1.Rs 3000FOR SRLDC 2.Rs 3000FOR WRLDC AP WR GRID MP HVDC BACK TO BACK AT BHADRWATHI IN WR Payments as per Regulation 2004 of CERC

APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0600 HRS ) 100 MW AT INJECTION POINT for 1 day APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION TRANSMISSION CHARGES PER MW PER DAY 1.Rs FOR CTU-SR 2.Rs FOR SR-WR LINK 3.Rs FOR CTU-WR TOTAL TRANSMISSION CHARGE PER UNIT 13.52Ps/. SCHEDULING CHARGES PER DAY 1.Rs 3000FOR SRLDC 2.Rs 3000FOR WRLDC AP WR GRID MP HVDC BACK TO BACK AT BHADRWATHI IN WR Payments as per Regulation 2004 Amendment 2005) of CERC

APTRANSCO - MPSEB THROUGH NVVNL (0000 HRS – 0600 HRS ) 100 MW AT INJECTION POINT for 1 day APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION TRANSMISSION CHARGES 1.Rs 90 /MWH FOR WHEELING TOTAL TRANSMISSION CHARGE PER UNIT 7.83Ps/. SCHEDULING CHARGES PER DAY 1.Rs 2000FOR SRLDC 2.Rs 2000FOR WRLDC AP WR GRID MP HVDC BACK TO BACK AT BHADRWATHI IN WR Payments as per Regulation 2008 of CERC

Comparison of CERC Regulations on Short-Term Open Access (Regulation 2004, Amendment 2005 and Regulations 2008) Old Regulations Old Regulations ( to ) Amended Regulations Amended Regulations (w.e.f to (w.e.f to ) ) Regulations, 2008 (w.e.f ) Total STOA Charges Paisa/Unit Total STOA Charges Paisa/Unit Total STOA Charges Paisa/Unit 7.83

TYPICAL STOA CASE - 2 TYPICAL STOA CASE - 2 KAYAMKULAM RGCCPP, NTPC to PSEB 150 MW for 31 days on Round the Clock basis

SR STOA OF KSEB(RGCCPP) - PSEB 0000 HRS – 2400 HRS 150MW AT RGCCPP EXBUS POINT for 31 days KERALA INJECTING UTILITY KYCPP,KSEB TRADER: NVVNL KAYAMKULAM RGCCPP NTPC) DRAWEE UTILITYPSEB CAPACITY APPROVED 150 MW DAILY PERIOD HRS CUSTOMER: NVVNL WR NR PSEB HVDC BACK TO BACK AT VINDHYACHAL IN WR HVDC BACK TO BACK AT BHADRWATHI IN WR INTERVENING REGION WR INTERVENING REGIONAL LINK SR-WR WR-NR INTERVENING STATE TRANSMISSION UTILITYKSEB

SR STOA OF KSEB(RGCCPP) - PSEB 0000 HRS – 2400 HRS 150MW AT RGCCPP EXBUS POINT for 31 days KERALA KAYAMKULAM RGCCPP(NTPC) WR NR PSEB HVDC BACK TO BACK AT VINDHYACHAL IN WR HVDC BACK TO BACK AT BHADRWATHI IN WR EXPORT AT RGCCPP BUS150 MW PSEB RECIEVES MW AT KERALA PERIPHERY MW LOSSES IN KERALA 0.75% LOSSES IN SR 3.12% AT SR-WR PERIPHERY MW LOSSES IN WR 4.0% AT WR-NR PERIPHERY MW LOSSES IN NR 3.0%

SR STOA OF KSEB(RGCCPP) - PSEB 0000 HRS – 2400 HRS 150MW AT RGCCPP EXBUS POINT for 31 days KERALA KAYAMKULAM RGCCPP(NTPC) WR NR PSEB HVDC BACK TO BACK AT VINDHYACHAL IN WR HVDC BACK TO BACK AT BHADRWATHI IN WR APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION TRANSMISSION CHARGES PER MW PER DAY 1.Rs FOR CTU-SR 2.Rs FOR SR-WR LINK 3.Rs FOR CTU-WR 4.Rs FOR WR-NR LINK 5.Rs FOR CTU-NR 6.Rs FOR KSEB SCHEDULING CHARGES PER DAY 1.Rs 3000FOR SRLDC 2.Rs 3000FOR WRLDC 3.Rs 3000FOR NRLDC 4.Rs 3000FOR KSEB TOTAL TRANSMISSION CHARGES PER UNIT 15.12Ps Payments as per Regulation 2004 of CERC

SR KERALA KAYAMKULAM RGCCPP(NTPC) WR NR HVDC BACK TO BACK AT VINDHYACHAL IN WR HVDC BACK TO BACK AT BHADRWATHI IN WR APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION TRANSMISSION CHARGES PER MW PER DAY 1.Rs 843FOR CTU-SR 2.Rs 1311FOR SR-WR LINK 3.Rs 357FOR CTU-WR 4.Rs 600FOR WR-NR LINK 5.Rs 594 FOR CTU-NR 6.Rs FOR KSEB SCHEDULING CHARGES PER DAY 1.Rs 3000FOR SRLDC 2.Rs 3000FOR WRLDC 3.Rs 3000FOR NRLDC 4.Rs 1000FOR KSEB TOTAL TRANSMISSION CHARGES PER UNIT 18.5Ps Payments as per Regulation 2004 Amendment 2005) of CERC STOA OF KSEB(RGCCPP) - PSEB 0000 HRS – 2400 HRS 150MW AT RGCCPP EXBUS POINT for 31 days PSEB

SR KERALA KAYAMKULAM RGCCPP(NTPC) WR NR PSEB HVDC BACK TO BACK AT VINDHYACHAL IN WR HVDC BACK TO BACK AT BHADRWATHI IN WR APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION TRANSMISSION CHARGES PER MWHR 1.Rs 90FOR Bilateral Wheeling through one or more region 1.Rs 30 FOR KSEB SCHEDULING CHARGES PER DAY 1.Rs 2000FOR SRLDC 2.Rs 2000FOR WRLDC 3.Rs 2000FOR NRLDC 4.Rs 2000FOR KSEB TOTAL TRANSMISSION CHARGES PER UNIT 12.2Ps STOA OF KSEB(RGCCPP) - PSEB 0000 HRS – 2400 HRS 150MW AT RGCCPP EXBUS POINT for 31 days Payments as per Regulation 2008 of CERC

Comparison of CERC Regulations on Short-Term Open Access (Regulation 2004, Amendment 2005 and Regulations 2008) Old Regulations Old Regulations ( to ) Amended Regulations Amended Regulations (w.e.f to (w.e.f to ) ) Regulations, 2008 (w.e.f ) Total STOA Charges Paisa/Unit Total STOA Charges Paisa/Unit 18.5 Total STOA Charges Paisa/Unit 12.2