Issues Raised by the Design of the LHC Beam Dump Entrance Window Ray Veness / CERN With thanks to B.Goddard and A.Presland.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

HiRadMat Window Design report v2.0 1Michael MONTEIL- 16 March 2010.
Finite element method Among the up-to-date methods of stress state analysis, the finite element method (abbreviated as FEM below, or often as FEA for analyses.
LS-Dyna and ANSYS Calculations of Shocks in Solids Goran Skoro University of Sheffield.
R.Valbuena NBI March 2002 CNGS Decay Pipe Entrance Window Structural and Thermal Analysis A.Benechet, P.Cupial, R.Valbuena CERN-EST-ME.
Copyright 2001, J.E. Akin. All rights reserved. CAD and Finite Element Analysis Most ME CAD applications require a FEA in one or more areas: –Stress Analysis.
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
Primary Target Systems for a Muon Collider / Neutrino Factory. What has the experimental effort taught us thus far. N. Simos, H. Kirk, S. Kahn, P. Thieberger,
Copyright © 2002J. E. Akin Rice University, MEMS Dept. CAD and Finite Element Analysis Most ME CAD applications require a FEA in one or more areas: –Stress.
LS-DYNA Simulations of Thermal Shock in Solids Goran Skoro University of Sheffield.
Unit 3: Solid mechanics An Introduction to Mechanical Engineering: Part Two Solid mechanics Learning summary By the end of this chapter you should have.
Simulations of Pressure Waves induced by Proton Pulses In search of the answer to the fundamental question: are materials indeed stronger than what we.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
A variety of load cases, ranging from nominal to degraded or abnormal operating conditions, were studied both numerically and analytically. The reviewers.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
ISIS Second Target Station
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
Poisson’s Ratio For a slender bar subjected to axial loading:
Cavity support scheme options Thomas Jones 25/06/15.
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
Stress and Strain – Axial Loading
BNL E951 BEAM WINDOW EXPERIENCE Nicholas Simos, PhD, PE Neutrino Working Group Brookhaven National Laboratory.
E951 Experiment Target Response Re-evaluation N. Simos, H. Kirk, P. Thieberger Brookhaven National Laboratory K. McDonald Princeton University.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Calculation of Beam loss on foil septa C. Pai Brookhaven National Laboratory Collider-Accelerator Department
Preliminary View on the LHeC Experimental Vacuum Chambers Jonathan Bosch - University of Manchester And Ray Veness - TE/VSC J.Bosch and R.Veness LHeC -
B.Goddard LHC Risk Review6 th March 2009 Beam dump dilution failure B.Goddard CERN TE/ABT On behalf of the LHC Beam Dump project team.
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
Engineering Department ENEN Collimator Robustness Studies with BCMS Beams Collimation Working Group F. Carra, A. Bertarelli, R. Bruce, P. Gradassi,
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cavity support scheme options Thomas Jones 25/06/15 1.
Technology Department 1 TCDS material selection and qualification W. Weterings
3 MeV H - chopper beam dump Presentation by L.Bruno 1 3 MeV H - Chopper Beam Dump Pre-design study By L.Bruno AB/ATB M.Magistris AB/OP M.Silari TIS/RP.
CAD and Finite Element Analysis Most ME CAD applications require a FEA in one or more areas: –Stress Analysis –Thermal Analysis –Structural Dynamics –Computational.
Alessandro BertarelliTS department Seminar, 3 rd May 2006 EDMS Alessandro Dallocchio 1,2 Alessandro Bertarelli 1 1 TS department – Mechanical and Material.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Beam absorbers for Machine Protection at LHC and SPS
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Task2: Liquid Metal Target Thermo hydraulic and structural analysis of the Eurisol liquid metal target Ashrafi-Nik M. * C.E.R.N, AB Department, ATB Group.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
Chiara Di Paolo EN-STI-TCD Material Choice for the Vacuum Window at the Exit of BTM.
S. Roesler (on behalf of DGS-RP)
Emergency dumping of proton and ion beams in SIS100 F
“hot spots” SIS100 internal beam dump Super-FRS production target
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
Peter Loveridge High Power Targets Group
Beam Window Studies for Superbeams
CAD and Finite Element Analysis
Federico Carra – EN-MME
Parameters of the NF Target
Damage Levels V. Kain AB/Co
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
Yielding And Fracture Under Combine Stresses
Presentation transcript:

Issues Raised by the Design of the LHC Beam Dump Entrance Window Ray Veness / CERN With thanks to B.Goddard and A.Presland

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Introduction o Window vs. Absorber o This talk is about a window, not a collimator, so the objective is to pass the beam rather than intercept it o However, o Design requires a good knowledge of the interaction between the beam and materials o Requirements for materials are very similar (low CTE, low Z, good high temperature strength) o Test and analysis requirements may yield some ‘symbiosis’ o Aim of talk o Explain the LHC dump entrance window design, stressing similarities and differences to collimators and absorbers o Discuss some open issues, which may (hopefully) have already been addressed in collimator or absorber design

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Contents o Beam dump entrance window design o Overview o Concept o Analysis o Issues o Energy in the system o Properties of carbon-carbon composite o Final remarks

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Overview of beam dump system Courtesy of B.Goddard

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Window functionality o Separate graphite dump core (TDE) from the dump line (TD) and LHC vacuum o TDE kept at 1.2 – 1.4 bar N 2 pressure o TD line kept at mbar pressure o Must withstand 1.4 bar static pressure load o Must withstand repeated (2-4 per day) normal dump beam load for LHC lifetime o 600 mm clear beam aperture o Must not fail catastrophically for worst case beam dump dilution failure (ie, can leak, but not collapse)

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Entrance Window Concept o Separate Vacuum and Mechanical requirements o 15mm thick C-C sheet for structure o Thin metal foil for leak tightness o Foil supported by, but free to move over the C-C CC foil N2N2 vacuum

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Window Design - FLUKA Nominal sweepVertical Kicker FailureTotal Kicker Failure Temperature maps on the C-C window for nominal beam sweep and kicker failure scenario cases Data courtesy of A.Presland

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Window Design - Mechanics o Main design issues (as with collimators) o Very rapid temperature rise, with high peak value o Localised temperature step o Axisymmetric thin window allows some simplifications o Thin plate – can plane stress analysis for initial analysis o Relatively small variation of through-thickness temperature – can neglect in some analyses o Static mechanical loads o Pressure loads can be calculated analytically and superposed Detail of transverse temperature profile for total kicker failure case in C-C plate

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Design – Thermo-elastic analysis o Analysis o Used bulk properties of C-C o Combination of low transverse CTE and low E give moderate stresses o Static FE analysis, with temperature profiles from FLUKA o Compares well with ‘ideal temperature step’ stress, E  T o Estimated the effect of dynamic stress based on semi-analytical solution for a thin disc from Sievers [1] o Compares heating time with time taken for stress wave to pass the heated zone o Only a small (few %) dynamic stress contribution predicted by this method o Therefore decided not to proceed to full finite element dynamic analysis o Did not consider out-of-plane modes [1] P.Sievers, “Elastic stress waves in matter due to rapid heating by an intense high-energy particle beam” CERN LAB II/BT/74-2 (1974) Summary of FLUKA (temperature) and ANSYS (von Mises stress) results for the different load cases Is this justified??

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Window installed in dump line 600mm

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Issues – Energy Deposition o Some numbers o 362 MJ passes through window per nominal beam dumped o 662 J absorbed in window (from FLUKA) – % o 662 J is equivalent to a 10g bullet travelling at 360 ms -1 o The effect of this absorbed energy o Steady-state temperature rise in the window of 0.12  C o The C-C sees 37 times less thermo-elastic stress than stainless steel for the same temperature profile o Concerns o A vast amount of energy passes through the window o Concequences of calculation errors are great o Only a minute fraction is absorbed by the window, due to the very low Z of the C-C material o Reliant on FLUKA output o This energy causes very little stress, due to the very low CTE of the C-C material o Reliant on material properties

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Issue – C-C properties o Window design uses a composite material that is relatively poorly qualified in an extreme environment (for the total failure case) o Transverse ΔT of up to 500ºC/mm in C-C during total kicker failure case o Considering a fibre diameter of 15  m and a volume fraction 0.5, this gives a worst-case ΔT of 15  C between individual fibres o Are bulk material properties valid? o What is the shear stress due to differential thermal expansion between fibre and matrix o Is significant damage at the fibre-matrix level possible? Detail of temperature profile for total kicker failure case in C-C plate

WS on Materials for Collimators and Absorbers Dump Window Issues- R.Veness Final Remarks o Entrance window design o There are many similarities to collimator designs, but the analysis is made simpler by the axi-symmetric, thin plate geometry o The energy passing through the window is very high – it is important that the assumptions are correct o The design is robust for nominal conditions, but the failure scenarios raise questions about the use of bulk material properties for the composite o Future work o The dynamic stress analysis should be re-visited o Out of plane vibrations o What is the best code to use? o Diagnostic methods for monitoring the state of the window, eg the acoustic method presented yesterday? o A window is potentially a good method for testing materials and qualifying codes o The 2-D geometry is simpler to model – verification of FE results? o It may be possible to insert windows ‘parasitically’ in fixed target lines or dump lines