11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Status Update on Mechanical Prototype in Rome November 6,
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
GEM detectors activity
Introduction to GEM detectors assembly Leszek Ropelewski CERN CompassTotem 33 cm NA61 30 cm 20 cm 66 cm Totem Upgrade 10 cm.
G.Bencivenni LNF-INFN, GEM Training Session – CERN, 16, Feb THE LHCb EXPERIENCE WITH THE ASSEMBLY OF THE GEM (*) G. Bencivenni LNF - INFN Italy.
BANDGEM Demonstrator: conceptual design and state of the art.
-Stephan AUNE- RD51 Bari 2010 CEA DSM Irfu 08/10/20101 Saclay MPGD workshop.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
1 Cross section of a double-stack MRPC. 2 Clean room for MRPC strip production.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
T.Schneider/LHCb Muon EDR
HV connection for a Common GEM foil design Aiwu Zhang
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Construction and first commissioning of the self-stretched gas electron multiplier (GEM) detector J. Twigger, V. Bhopatkar, J. Wortman, M. Hohlmann 77th.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
M23 Inner Regions Upgrade with Triple-GEM detectors The XVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
Laboratori Nazionali di Frascati
Quality Control Chamber Production
On behalf of the GEMs for CMS Collaboration
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Some proposals on HV circuits realization for segmented straw detector
Mechanical analysis of Foam and plastic honeycomb panels
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF

11/02/2005M. Alfonsi - LNF2 CLEAN ROOM 2. GEM HV TEST 1. FRAME CLEANING 4. GEM CUTTING 3. GEM STRETCHING 5. ASSEMBLY 6. SOLDERING All construction operations are performed in a class 1000 clean room. Operators must be specifically dressed (gloves, over-shoes..). CLEAN ROOM

11/02/2005M. Alfonsi - LNF3 A remind of chamber structure The detector is composed by: - 3 GEM foils glued on FR4 frames, defining the gaps … and then sandwiched between - a cathode and anode PCBs, glued on honeycomb structure panels. A M1R1 detector is realized coupling two of such chambers. Construction steps are:  GEM framing  Chamber assembly  Coupling of the two chambers

11/02/2005M. Alfonsi - LNF4 GEM FRAMING: frame preparation In the clean room further cleaning is performed by means of an ultrasonic bath. Then frames are dried in a oven at 80°C for about 24 h. The internal edge of frame is preliminary sanded. The frame is cleaned before entering in the clean room, and finally checked for broken fibers A clean cabinet is used for storage of frames.

11/02/2005M. Alfonsi - LNF5 GEM FRAMING: stretching GEMs that pass the HV test (see quality control) are stretched with a specific tool. The foil is clamped with jaws equipped with plastic O-ring. Mechanical tension (18kg/jaw  20 MPa) applied to the edge of the foil is monitored with gauge meters. Kapton creep is negligible for this mechanical tension (see 18 cm

11/02/2005M. Alfonsi - LNF6 GEM FRAMING: glueing Before glueing the frame is checked again for broken fibers, cleaned with isopropyl-alchool and dried with nitrogen flow. Araldite 2012 epoxy resin (good electrical behavior, suitable handling properties & aging tested(*)) is applied with a rolling wheel tool on the frame. Epoxy work life: 4 minutes; curing time: 2 hours. (*) see P. De Simone et al., “Studies of etching effects on triple-GEM detectors operated with CF 4 -based gas mixtures”, presented at IEEE 2004 and submitted to TNS Then the frame is coupled with the stretched GEM foil, with a load of 40 kg. Stretching and glueing require for two operators and last about 15 minutes to be accomplished.

11/02/2005M. Alfonsi - LNF7 GEM FRAMING: refining Exceeding kapton is cut to size. During this operation the HV connections of the GEM foil are suitable masked. HV connection to sectors of the segmented side of the GEM foil is provided through SMD limiting resistors (1M  ). These are soldered in slots, machined in the frame. During this operation the active area of the GEM is protected. HV test (see quality control) is performed again at this stage.

11/02/2005M. Alfonsi - LNF8 CHAMBER ASSEMBLY (I) The chamber assembly procedure is divided in 2 steps. Epoxy araldite AY103 + HD991 (good electrical behavior, convenient handling properties & well-known aging properties (*)) is applied with the usual rolling wheel tool on framed GEMs. 1) 1) One after the other the 3mm, 1mm, 2mm framed GEMs, plus an additional bare 1mm-frame (induction gap), are positioned on the cathode PCB panel. The assembly operation is performed on a machined ALCOA reference plane, equipped with 4 reference pins. Over the whole structure a load of 40 kg is uniformly applied for 24h, as required for epoxy polymerization. (*) C. Altunbas et al., CERN-EP/ ; CERN PH-TA1-GS, systems.web.cern.ch

11/02/2005M. Alfonsi - LNF9 CHAMBER ASSEMBLY (II) 2) Before glueing the pad panel, HV connections of GEM foils are soldered on cathode PCB Finally PAD panel is glued. Globally the assembly procedure requires for two operators and last about 2 working hours (+ 24h x 2 for epoxy polimerization) The 7 HV cables will be successively soldered on the internal side of the PCB

11/02/2005M. Alfonsi - LNF10 CHAMBER SEALING Inside the four reference holes, used for the positioning of the various components during the assembly, Stesalite bushings are inserted and glued with the CIBA 2012 epoxy. Bushings prevent gas leaks from the corners of the chamber and are used to hang-up the chamber on the muon wall. Small leaks (see quality control) can be fixed with additional glue (AY103 + HD991). Dow Corning conformal coating (very good dielectric rigidity), is used for the passivation of the HV connections on the cathode. Glue cure time: 24h Chamber is then ready for X-ray Test (see quality control)

11/02/2005M. Alfonsi - LNF11 CHAMBER COUPLING Two detectors that pass the X- ray test, are coupled through the 4 pin holes with cathodes faced one to each other. FEE boards are installed along the detector perimeter and closed with the Faraday cage (this is not the final one). The gas flows through the two chambers in serial mode. OUT IN PAD PANEL CATHODE PAD PANEL CATHODE Faraday cage is not the final one!