SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Update on the Laser Beam Line
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Overview of the LHC Year End Technical Stop
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS YETS 2015/2016 Planning meeting (No.3) 07/10/15 David Mcfarlane EN-MEF D.Mcfarlane1.
IEFC Workshop 9 th March 2012 – Magnet activities in IEF during LS1 – J. Bauche 1 Magnet activities during LS1 J.Bauche, on behalf of the TE/MSC/MNC section.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Status of the machines over X-mas standby period, services required and plans for rapid start-up OP Group Meeting KH.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
SPS LS2 Planning meeting (No.6) 19/07/17
SPS Personnel Protection System Renovation Project
SPS YETS 2017/2018 Planning meeting (No.1) 13/09/17
SPS EYETS 2016/2017 Planning meeting (No.4) 12/10/16
SPS LS1 Planning meeting (N019) 04/09/13
SPS Winter stop Planning meeting (N06) 05/01/2011
TE-MSC activities in SPS during LS2
SPS YETS 2017/2018 Planning meeting (No.2) 27/09/17
Injector De-cabling Project
Planning and Installation
Julie Coupard Schedule and Coordination
SPS YETS 2015/2016 Planning meeting (No.14) 03/02/16
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Update on the Ethernet Network Installation Campaign
SPS LS1 Planning meeting (No.34) 16/04/14
SPS activities during LS2 TE-EPC (Power Converter Group)
TE-MSC activities in SPS during YETS
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Experimental Areas – LS2 planning
Presentation transcript:

SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1

Key dates Beam off at 06:00 on Monday the 14 th December Access into BA7,TT61, TI2 & TI8 allowed from Monday the 14 th December. Access into BA3,4,5 & 6: – Thursday the 17 th December until Friday the 19 th February (7.4 weeks of access) NO works are planned in the tunnel during the 2 week Xmas vacation.****(some works in the surface buildings) Access into BA1 & 2: – Monday the 4 th January until Friday the 19 th February (7 weeks of access) 4 weeks foreseen to start-up the SPS to be ready with beam on Monday the 21st March! Do not plan ANY works that could affect vacuum unless pre- approved by vacuum!!!!!! EN-MEF D.Mcfarlane2

YETS Reference time : 13 weeks beam to beam stop for the LHC Ions run Lead-Lead 3 weeks for commissioning (cold check-out + beam commissioning) in the injectors before beam ready for the LHC RP survey measurement RP cool-down (Linac2, PSB, PS, TT2, SPS, LHC) Not including the xmas break 8 Weeks of access into the SPS7 Magnet testsGeneral access to SPS

Test AUG/ Access Tests (Access will be blocked) LocationAUG testAccess tests SPS 17 th December (06:00 to 07:00) 18 th December (15:00 to 17:00) BA1 11 th February1 st February (AM) BA2 19 th January1 st February (PM) BA3 12 th February2 nd February (AM) BA4 ECX4 TAG42 13 th January 2 nd February (PM) 3 rd February (AM) 3 rd February (PM) BA5 ECX5/ECA5 10 th February 4 th February (AM) 4 th February (PM) BA6 20 th January5 th February (AM) BA7 TT61 4 th February 8 th February (AM) 8 th February (PM) BA80 23 rd February9 th February (AM) 4EN-MEF D.Mcfarlane

Vacuum works Starting date Ending dateIMPACT W1 BA4MKE - reconfiguration14/12/201518/12/2015 BA4Bypass Coldex removal - He pumps17/12/201518/12/ TI2-TI8Visit to the TEDs18/12/2015 Lab 113UA9 Acceptance Test15/12/201517/12/2015 W2 All machineMagnet exchange04/01/201608/01/2016 BA5 UA9, Slac collimator, Pickup,VG exchange, endoscopy04/01/201508/01/ (endoscopy) W2-W3 BA5Sectorization06/01/201611/01/ W3 All machineMagnet exchange11/01/201615/01/2016 Lab 113Acceptance test UA9- monitor11/01/201613/01/ (RF cavity4) BA3 pickup installation, RF cavity detection, endoscopy11/01/201615/01/2016 W4 All machineMagnet exchange18/01/201622/01/2016 BA2UA9 TT2018/01/201621/01/2016 W5 All machine (no LSS5)SIP grounding inspection25/01/201629/01/ Lab113E-O pickup acceptance test26/01/201628/01/2016 W6 BA4TT40 leak intervention + EO pickup installation01/02/201604/02/ BA4Coldex Bypass reinstallation02/02/201604/02/ (TT40 leak) W7 BA2ZS intervention08/02/201612/02/2016 W8 BA7 - P2TED intervention15/02/201622/02/ W9 TDC2TDC2 Intervention29/02/201604/03/ EN-MEF D.Mcfarlane5

Group presentations EN-MEF D.Mcfarlane Date of meetingPresentation 1Presentation 2Presentation 3 Wed 7 th October EN/CV (Bill Bannister) EN/EL (Henry De Maynard+Denis Ribiollet) GS/ASE (Didier Vaxelaire + Denis Raffourt) Wed 21 st October BE/BI (Christophe Vuitton) TE/VSC + Coldex (Anthony Harrison) BE/RF + Crab Cavity (Christophe Renaud + Alick Macpherson) Wed 4 th November TE/MSC (Jeremie Bauche) GS/SE (Richard Morton) EN/STI + UA9 (Simone Montesano) Wed 18 th November TE/EPC (Gilles Le Godec) EN/HE (Jean-Louis Grenard) EN/MEF (Patrick Bestmann) EN/EL (Cabling) (Guillaume Gros) (Thomas Slettestol Glaerum) Wed 2 nd December DGS/SEE (Marco Andreini) IT/CS (Maryse Da Costa) DGS/RP (Christophe Tromel / Angeleto Herve) BE/OP Fire doors and re-start It has been requested by the group leaders for each group to present their planned works to the coordinators of each machine. Therefore the table below will show which group will present and what SPS planning meeting. 6

EN-MEF D.Mcfarlane7

BA1 Access possible – 4 th January to 19 th February (7 weeks) Magnet change campaign – 4 th January to 15 th January (2 weeks) Latest date for works affecting vacuum – Friday the 12 th February High radiation area. Plan works for the end of the YETS! EN-MEF D.Mcfarlane8

BA2 Access possible – 4 th January to 19 th February (7 weeks) Magnet change campaign – 4 th January to 15 th January (2 weeks) TE-ABT will be replacing ZS4 in LSS2 – 1 st February to 12 th February (2 weeks) Latest date for works affecting vacuum – Friday the 12 th February High radiation area. Plan works for the end of the YETS! EN-MEF D.Mcfarlane9

BA3 EN-MEF D.Mcfarlane10 Access possible – 4 th January to 19 th February (7 weeks) Magnet change campaign – 4 th January to 15 th January (2 weeks) BE-RF will replace a High Bandwidth Damper Kicker – 4 th January to 22 nd January (3 weeks) Latest date for works affecting vacuum – Friday the 12 th February

BA4 EN-MEF D.Mcfarlane11 Access possible – 4 th January to 19 th February (7 weeks) Magnet change campaign – 4 th January to 15 th January (2 weeks) Latest date for works affecting vacuum – Friday the 12 th February

BA5 EN-MEF D.Mcfarlane12 Access possible – 4 th January to 15 th January(2 weeks) – 8 th February to 19 th February (2 weeks) Magnet change campaign – 4 th January to 15 th January (2 weeks) Removal of Water Cooled Cables – 18 th January to 5 th February (3 weeks) Latest date for works affecting vacuum – Friday the 12 th February

BA5 (Removal of Water Cooled Cables) No access allowed via The lift in ECA5! NO Access into LSS5 ECA5 Access possible

BA6 EN-MEF D.Mcfarlane14 Access possible – 4 th January to 19 th February (7 weeks) Magnet change campaign – 4 th January to 15 th January (2 weeks) Latest date for works affecting vacuum – Friday the 12 th February

BA7 EN-MEF D.Mcfarlane15 Access possible – 14 th December to 19 th February (8 weeks) Magnet change campaign – 4 th January to 15 th January (2 weeks) Latest date for works affecting vacuum – Friday the 12 th February

18 IMPACTS created EN-MEF D.Mcfarlane16

Access rights and safety equipment Everyone who enters the SPS MUST have the following: – Completed the correct courses. (sir.cern.ch) CERN Safety Introduction. Electrical Safety Awareness. (19 choices) Self Rescue Mask Training. (4 choices) CERN – Beam Facilities. SPS – Machine. – The correct access authorisation (via EDH). Zone Code “SPS” for access into the SPS Zone Code “NA_TARG” for access into BA80 Zone Code “TAG41 - AWAKE (ex-CNGS) (TAG41)” for access into the old CNGS areas Zone Code “SPS-KN-000” for “Autorisation conduite RTL” Zone Code “SPS-KN-001” for “SPS Shutdown Padlock” (only used during Long Shutdowns) – PLEASE CHECK THAT YOUR ACCESS RIGHTS DO NOT EXPIRE AT THE END OF THIS YEAR!!!! – A valid approved IMPACT. (with their name included on this IMPACT) – They must know the number of this IMPACT. – Safety shoes. – Biocell. – Electronic dosimetre. – Passive dosimetre. – All contractors must all have a company passive dosimetre!!! – Helmet plus Light. Please note that personnel are not allowed to work in the tunnel alone!! EN-MEF D.Mcfarlane17

Useful websites Link to SPS planning meetings on INDICO Link to the SPS planning in EDMS Roadmap: Schedule beyond LS1 Next SPS planning meeting 09/12/ EN-MEF D.Mcfarlane18