LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (September 2014) 1 CERN TE-ABT-EC.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
PLC DEVELOPMENTS FOR NEW VACUUM DEVICES IN THE LHC AND NA62
N. Voumard, AB-BT-EC LBDS Audit, CERN LBDS Trigger Signal Distribution Trigger Synchronization Unit (TSU) Trigger Fan Out (TFO) Power Trigger Unit.
Failure mode impact studies and LV system commissioning tests
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
PXI-Kicker Generator Control Jan Schipper TE-ABT-EC.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
The TIMING System … …as used in the PS accelerators.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
Fast high-voltage, high-current switching using stacked IGBTs
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
FAIR Accelerator Controls Strategy
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
ABT Consolidation Review Electronics & Controls Etienne Carlier
Kicker generator and controls installation in ECA5? Etienne CARLIER
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
MKI’s TCM Tests status Electronics and Controls 17/11/2014 by R.A.Barlow.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
Tobias Stadlbauer Special Magnets MedAustron 7-8 October 2010 Special Magnets Controls Status and Plans IntroductionPower SupplySlow ControlsAOB.
Technology Department BI.DIS general controls status R.A.Barlow EC section
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Danish Ali Nawaz 1CLIC workshop 2016 Danish Ali NAWAZ, BE-ABP LEETCHI: Drive Beam Electron Source Automation Control.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Wim Weterings Remy Noulibos
Electrical Configuration and System Protection
RF acceleration and transverse damper systems
Outcome of BI.DIS Fast Interlocks Peer Review
Data providers Volume & Type of Analysis Kickers
Injectors BLM system: PS Ring installation at EYETS
prepared by R.A.Barlow 30/056/2016
TE-ABT PLC and SCADA usage
TE4862 Thyratron Power Triggering System for the CERN Kicker Systems
the CERN Electrical network protection system
PSB Injection scheme in the Linac 4 era
Interlocking of CNGS (and other high intensity beams) at the SPS
RF Local Protection System
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
AC-Dipole Limitations and Options for its Upgrade
Presentation transcript:

LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (September 2014) 1 CERN TE-ABT-EC

OUTLINE 2 Controls Project status Missing elements Issues Spending - FTE

BI.DIS Background info 3 In order to distribute the 160 MeV beam from Linac4 to the four rings of the PSB, new distributor magnets (BI.DIS) and magnetic septa (BI.SMV) need to be built. The proposed distribution scheme also requires the construction of new pulse generators (PFN) to double the magnitude of the BI.DIS field pulse and increase the duration of the pulse from 136 µs to a maximum of 620 µs.

BI.DIS Current development for a new pulse generator 4 Five magnets powered separately, each are terminated into a S/C. Five power converters needed + one spare. PFN discharge based power converter using IGBTs as a main switch. Partial energy recuperation after pulsing. The PFN stays charged all the time (this allows the system to contribute towards economy of energy).

BI.DIS Power supply 5 Output Voltage Charging Current Average Power Peak Power Converter Type Quantity 10 kV1 A1 A5 kJ/s10 kWAC/DC8

6 Controls functional requirements – SLOW control SLOW controlDescriptionDeliverablesIssues Power supplyControl of primary power supplies 1 PLC chassis unit (x6)n.a Electrical distributionControl of electrical distribution network, independent generator operation 1 unit with low voltage devices and PLC control Design in-house or outsourced to exterior AUE, FlashersSafety aspect for HVSafety componentsn.a Earthing switchPFN HV safety1 PLC chassis unit to control all earth switches n.a General purposeThis can be positional micro switches, temperature measurement, voltage references, contacts commands, etc… 1 PLC chassisNo clear definition of all peripherals. BIS system Provide the Linac4 BIS with BI.DIS system status 1 PLC chassisn.a SCADA State Machine Control1 Operator panel + Remote viewing Integration of PLC systems and Pxi. BI.DIS

Controls functional requirements – FAST control 7 FAST controlDescriptionDeliverablesIssues IGBT triggeropto coupled IGBT triggering system + synchronisation 1 crate unit with trigger chain (x6) + 1 N.I Pxi system for drift and synchronisation Complex system for IGBT switching characteristics control Timing distributionTiming distribution hardware, fault protection 1 H/W crate + FEC to manage timing distribution via Generic KiT’s system Complex timing issues, to be refined and discussed further with experts. Voltage pickupsFast analogue acquisition of voltage across PFN, Switches N.I Pxi systemn.a Current monitorsMagnet current and PFN current, fast analogue acquisition N.I Pxi system n.a Signal analysisAnalogue acquisition system and others … 1 H/W for signal acquisition, 1 for virtual scope, + 1 Scope Still to be defined, budget burden Faulty shots detectionFast faulty shot detection and missing shots in IGBT triggering N.I Pxi systemNot clear if integrated with drift and synchronisation system or separate project

8 8 Slow Control Ethernet Industrial bus Power supply Electrical Distribution General purpose Applications Equipment Server Timing Logging/ Signal acq AlarmSCADA Local Control Windows LabRT Trigger, Fast interlocks BIS BI.DIS Controls structure

BI.DIS Project status 9

BI.DIS ISSUES 10 Fast switching elements – Current prototype Due to their series configuration in BI.DIS, IGBT switch-off process leading to voltage imbalance. In order to obtain a good switch-off window for re-conduction the switch-off trigger pulse of each switch must be delayed with respect to each other in the ‘ns’ range. Hence specialised controls will be necessary for switch re- conduction Studies of IGBT switches have involved so far: ABB (improved T r ) Hitachi (improved T r ) Mitsubishi Infineon

BI.DIS ISSUES Fast switching controls 11 IGBT driver Concept 1SD210F2 (2of) Isolation transformer Concept ISO (2of) Timing Card Opto converter, DG535 PS-KM-E/S-Y/2A Timing Card fine delay (Stanford pulse generator presently used on test bench in hall 867) NI5152 digitizer

BI.DIS ISSUES Interlock logic 12 MAGNET Missing current detection Poor vacuum detection Pulse length not correct Short circuit between IGBT and magnet input IGBT Voltage balance on each switch Status not ok read back from each Concept driver card Faulty shot No output current from assembly Primary 15 V supply failure for each Over-temperature of the assembly FREEWHEEL DIODE/DUMP DIODE No current detection PFN Over-volt Under-volt Ross relay wrong status read back Doors micro-switches Manual grounding switch wrong position Wrong voltage versus CCV Fire detection PFN POWER SUPPLY faults (from Power Supply status) Overload No end of charge TIMING Delay charge – discharge too small Delay discharge – charge too small Double pulse PFN PPM SWITCH Not operating Short-circuit Erratics/Missings ?

BI.DIS ISSUES Timing distribution 13 Figure 3: Possible linac4 pulse structures and BI.DIS timing showing: (A) standard operation with injected turns per ring, (B) operation with 0 injected turns for ring 3 and (C) pilot beam with 3-5 injected turns per ring. KiTS Kicker CCC EXPERT Timing Slow control EXPERT Slow control The KiTS based on a modular hardware and software architecture has been developed with the objective to increase the homogeneity of fast and slow timing control for fast pulsed magnet systems. The KiTS uses a hardware abstraction layer and a configurable software model implemented within the Front-End Software Architecture (FESA) framework. It has been successfully deployed in the control systems of the LHC and SPS injection kickers, the SPS extraction kickers and the SPS tune measurement kickers.

BI.DIS Controls Hardware Rack Layout proposal 14 HARDWARE BREAKDOWN 1 x PDC 1 X OP 1 or more oscilloscopes 10 x PLC based Chassis 10 x PPU (at least) 1 x KIT’s system 1 x IPOC system ? 6 x Status/Command crate ? 1 x Pxi (however more likely 6 of) 6 x Power supply 6 x trigger card systems 1 x EDS controller

BI.DIS Manpower 15 Project Coordinator PLC HW + Software + Power supplies PDC design and integration Cabling Signal acquisitions / analysis systems Pxi system, drift stabilization, switch synchro, faulty shots IGBT drivers and triggering systems Timing system, KiT’s MANPOWER BREAKDOWN A possible team of 6 specialists

BI.DIS Specifications 16

BI.DIS Cost projection 17 SubjectTechnologyCostComment IGBT drivers carte concept10000 IGBT drift stabilizationPxi, National instrument90000 Power suppliesunknown Earthing switchSiemens PLC + in-house design20000 PPM switchBehlke technology10000 BIS systemSiemens PLC2000 SCADAOP370 Siemens5000 System timingKITS20000 Sig loggingOASIS, IPOC, MUX systems, SCOPE, etc Power distribution ControllerSiemens PLC + Legrand and others8000 Slow control (PLC Siemens)Master controller, PSC controller, General purpose25000 AUE/Flashers 2000 EN/ELDIC15000 FsuChassis build + installation50000 TOTAL CHF

BI.DIS Spending Profile 18 Year PV EV 21 AC 10 New PV Metrics per year in kCHF DescriptionProvide controls for kickers magnets and generators APT wu92161 Wu responsible Budget code65737