February 21, 2001TR41.9-01-02-0191 CFR PART 68 – pre R&O Refers to the document published by the FCC Contains the following sub-parts –Subpart A –Subpart.

Slides:



Advertisements
Similar presentations
Balloting/Handling Negative Votes. General Overview of Different Levels of Balloting Subcommittee New Standards Major Revisions Provisional Standards.
Advertisements

Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
ACTA and Part 68 Review and Update Responsible Party Code (RPC) Data Validation Program April 7, 2011 Jim Haynes, ACTA Chair.
IEEE P1850 IEEE-SA Sponsor Ballot Primer 5 April 2005 Presented by Andy Ickowicz & Noelle Humenick IEEE Standards Activities.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Secretarial Duties. The secretary records the minutes of the meetings, maintains a register of members and directors, is responsible for sending out the.
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
TIA Engineering Manual 6 th Edition Preview and Overview.
Recently Issued OHRP Documents: Guidance on Subject Withdrawal and Draft Revised FWA Secretary’s Advisory Committee on Human Research Protections October.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Status Report and Initial Recommendations August 23, 2000 Ed Eckert, Chair, Focus Group 3 Phil Kyees, Chair, Spectrum Management Subcommittee Massimo.
MODULE B - PROCESS SUBMODULES B1.Organizational Structure B2.Standards Development: Roles and Responsibilities B3.Conformity Assessment: Roles and Responsibilities.
ASME C&S Training Module B5 MODULE B - PROCESS SUBMODULES B1. Organizational Structure B2. Standards Development: Roles and Responsibilities B3. Conformity.
Annex J Single-designation of Documents. Action Item (TSSC, Apr. 24) Single Designation Numbering and Annex J – Herb reported that the original Annex.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
Smart Meter Texas (Draft) Help Desk SMT Help Desk The Help Desk receives, fulfills and closes end user requests for service, incidents, resolution of problems,
1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion.
1 TIA Engineering Committees - Policies and Procedures TIA Staff.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
TIA TECHNICAL COMMITTEE (Contribution Number) Title: UPED Update of Activities within TR-42, User-Premises Telecommunications Infrastructure NameBob Jensen.
The Standards Development Process IEEE Gary Hoffman April 13, 2015.
Introduction to the ISO series ISO – principles and vocabulary (in development) ISO – ISMS requirements (BS7799 – Part 2) ISO –
New Implementing Regulation DG Enterprise on the Administrative Requirements for the approval and market surveillance of 2- or 3-wheel vehicles and quadricycles.
OVERVIEW OF ENGINEERING MANUAL, Part 1 Susan Hoyler TIA, Director Standards Development and Promotion.
UPED Title: Update of Activities within TR-42, User-Premises Telecommunications Infrastructure NameBob Jensen CompanyFluke Networks Address9015 Mountain.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Doc.: IEEE Submission January 2015 Rick Roberts [Intel]Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
An Overview of the Administrative Council for Terminal Attachments (ACTA) The Federal Communications Commission’s Privatization of Certain 47 CFR Part.
Update the “Procedures for Accredited Standards Committee C63®, ElectroMagnetic Compatibility (EMC), Revision 10 January 2013.” Input Received 01-MAY-2014.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
BIWQ Standards Development for Comprehensive International Border Water Quality Management Agreement Conrad G. Keyes, Jr., ScD EWRI/ASCE, Chair, BIWQ SC.
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
DOCUMENT SUBMITTED TO: TIA TSSC, UPED and TC The document to which this cover statement is attached is submitted to a Formulating Group or sub-element.
An Overview of the Administrative Council for Terminal Attachments (ACTA) The Federal Communications Commission’s Privatization of 47 CFR Part 68 Presented.
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
WRC–12 Industry Debrief 23 April 2012 Agenda Items 1.1 Deletion of country footnotes 2 Incorporation by Reference 4 Review of ITU-R Resolutions and Recommendations.
Doc.: IEEE r1 Submission May 12, 2002 Dr. John R. Barr, Motorola Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /224r3 Submission May 2001 Tom Siep, TMS ConsultantsSlide 1 TG3 Review Procedure Proposal NOTE: All of these recommendations do not.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Doc.: IEEE Submission March, 2014 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
James W. Moore Liaison Representative IEEE Computer Society June 2004
PC Training: Responding to Negative Voters (with Reason)
DOCUMENT SUBMITTED TO: TSSC and TC
Revisions to Codes and Standards
Joint Co-Existence Update ATIS/TIA Orlett W. Pearson February 2012
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Updates to Expedited Review Procedures
Standards Development: An Overview
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Specification on float equipment
July 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, July 2002 Date Submitted:
doc.: IEEE <doc#>
PC Training: Responding to Negative Voters (with Reason)
Stephen R Whitesell TR-41 Chair VTech Communications
TGad July 2010 Editor Report
Sponsor Ballot Comment Resolution
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Specification on float equipment
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
Adolfo Perujo (IWG chairman)
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
Presentation transcript:

February 21, 2001TR CFR PART 68 – pre R&O Refers to the document published by the FCC Contains the following sub-parts –Subpart A –Subpart B –Subpart C –Subpart D –Subpart E –Subpart F

February 21, 2001TR ANSI PART 68 Refers to the document to be created by TR41.9 and eventually submitted to ACTA Has received PN No from TIA

February 21, 2001TR Subpart A - General Sections to be in ANSI Part 68: –A new scope section- add sentence capturing the grandfathering concept to the scope of the ANSI PART 68; also capturing the essence of the issues of changes to equipment – SEE SCOPE STATEMENT –All of 68.3 definitions except those found in the new CFR Part 68 Definitions found in new CFR Part 68 to be included in an informative annex within ANSI Part 68 –A new Reference section for a list of documents such as TSB 31, etc.

February 21, 2001TR Subpart B – Conditions on use of TE Not technical in nature Not retained in ANSI Part 68 Issues of concerns: –Add a sentence to address plug & jack means of connection in subpart F (including alternative means, hard-wired, etc.) (refer to ) – place this sentence in the Subpart F introduction paragraph

February 21, 2001TR Subpart C – TE Approval Procedures Not technical in nature – not to be included in ANSI Part 68 –Issues of concerns: Capture the intent of Sec (P68 Pre-R&O)“Changes in Registered Equipment and circuitry” – to be covered in SCOPE section of ANSI P68 Concerns about Sec (P68 Pre-R&O)“Repair of Registered Equipment and Registered Protective Circuitry” are already covered in the definition of Responsible Party- not retained in ANSI Part 68.

February 21, 2001TR Subpart D – Conditions for TE Approval [Sections retained in new 47CFR Part 68 – and through ] Sections to be in ANSI Part 68: – through –Retain the title of , & … add sentence to direct the user to the sections in the 47CFR Part 68

February 21, 2001TR Subpart D (cont.) : –Will be retained in its entirety in ANSI Part 68 –Will be identical to the Part 68 pre-R&O –Issue of concerns: “Approved Terminal Equipment” to be used in the place of “Registered TE” – global search to be performed

February 21, 2001TR Subpart D (cont.) : –Will be retained in its entirety in ANSI Part 68 –Will be identical to the Part 68 pre-R&O –Issue of concerns: “Approved Terminal Equipment” to be used in the place of “Registered TE” – global search to be performed

February 21, 2001TR Subpart D (cont.) : –Will be retained in its entirety in ANSI Part 68 –Will be identical to the Part 68 pre-R&O –Issue of concerns: “Approved Terminal Equipment” to be used in the place of “Registered TE” – global search to be performed

February 21, 2001TR Subpart D (cont.) : –Will be retained in its entirety in ANSI Part 68 –Will be identical to the Part 68 pre-R&O –Issue of concerns: “Approved Terminal Equipment” to be used in the place of “Registered TE” – global search to be performed

February 21, 2001TR Subpart D (cont.) : –Will be retained in its entirety in ANSI Part 68 –Will be identical to the Part 68 pre-R&O –Issue of concerns: “Approved Terminal Equipment” to be used in the place of “Registered TE” – global search to be performed

February 21, 2001TR Subpart D (cont.) : –Will be retained in its entirety in ANSI Part 68 –Will be identical to the Part 68 pre-R&O –Issue of concerns: “Approved Terminal Equipment” to be used in the place of “Registered TE” – global search to be performed

February 21, 2001TR Subpart D (cont.) : –Will be retained in its entirety in ANSI Part 68 –Will be identical to the Part 68 pre-R&O –Issue of concerns: “Approved Terminal Equipment” to be used in the place of “Registered TE” – global search to be performed

February 21, 2001TR Subpart D (cont.) – old labeling info: –Not retained in ANSI Part 68 Rationale: administrative in nature and labeling recommendations are formulated by TR41.11 to be sent to ACTA under the labeling umbrella of requirements Note: In fact, FCC retained but the paragraph was revised.

February 21, 2001TR Subpart E Not retained in ANSI Part 68 –Rationale: Complaint procedures are being retained (and augmented) by the FCC in the CFR Part 68

February 21, 2001TR Subpart F Proposed to be retained in its entirety in ANSI Part 68 –Add a sentence to address plug & jack means of connection in subpart F (including alternative means, hard-wired, etc.) (refer to in Subpart B) –Rationale: connectors’ dimensions are technical requirements, ATIS Report No. 5 does not contain the dimensions of the connectors

February 21, 2001TR Timeline – as agreed in TR Editorial group to finish first draft by Mar 16 Circulation by within the subgroup Second draft to be circulated by Mar 26 Conference call Mar 28 for consensus Submission to TR41.9 TR41.9 interim meeting for approval of document April 5 TR41.9 Meeting Notice of Interim Meeting to be sent out by Mar 5 Ballot period to end by May 5, allowing resolutions of comments at the next TR41.9 meeting Goal  the sooner the better. Can timeline be shortened?

February 21, 2001TR Approval of pre-ballot version- First Alternative Follow essentially the timeline that the working group has agreed upon

February 21, 2001TR Approval of pre-ballot version- Second Alternative Approve today each Subpart separately in principle –Rationale: no substantive changes to content of document, the only need is to agree on what to retain Note: this was approved by TR41.9 on Feb 21, 2001 Editorial group to finish the final draft of the pre-ballot version Review of the pre-ballot version via by entire TR41.9 committee Resolve comments via and a conference call Send the final draft out for ballot