W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.

Slides:



Advertisements
Similar presentations
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
P. Chumney, U. Wisconsin, CHEP, March 2003 CMS Regional Calorimeter Trigger - 1 Level-1 Regional Calorimeter System for CMS P. Chumney, S. Dasu, M. Jaworski,
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
W. Smith, August 2002 U. Wisconsin Task T - 1 Task T - CMS at LHC Personnel: Professors. D. Carlsmith, S. Dasu*, D. Reeder, W. Smith* Senior Scientist.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
Firmware - 1 CMS Upgrade Workshop October SLHC CMS Firmware SLHC CMS Firmware Organization, Validation, and Commissioning M. Schulte, University.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
W. Smith, US CMS Meeting, April 8, 2006 CMS Trigger - 1 Click to edit Master title style US CMS TriDAS 2006 US CMS Meeting Wesley H. Smith, U. Wisconsin.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
CMS November Upgrade Week
CMS EMU TRIGGER ELECTRONICS
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Darin Acosta University of Florida
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Sector Processor Status Report
Plans for the 2004 CSC Beam Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager January 28, 2005 Outline: Calorimeter Trigger Status Endcap Muon Trigger Status M&O Plans Upgrade R&D This talk is available on:

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 2 L1 Trigger Hardware Overview US CMS Trigger (this talk) US CMS fully responsible US CMS partially responsible Groups: U. Florida Rice UCLA Wisconsin

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 3 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Back Bar Code Front Regional Cal. Trigger Milestone: Major Production Complete Receiver Card: Electron Isolation & Clock: Jet/Summary: Receiver Mezz. Card BSCAN ASICs Sort ASICs BSCAN ASICs Phase ASIC 55/153 tested (126) 153/154 Tested (126) 5/25 tested (18) 3/25 tested (18) (19/25 Custom Backpl Tested) (18) fraction tested (needed) EISO Clock Front Back

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 4 RCT Full Crate Operating at CERN - U. Wisconsin M&O Support used to keep operational, use in integration tests Rear: Receiver CardsFront: Electron, Jet, Clock Cards x 18

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 5 CSC Trigger Major Milestone: Structured Beam Tests ME 1/1 ME 1/2 ME 2/2 ME 3/2 RE1/2 Peripheral Crate #1 ME1/1+ME1/2 Peripheral Crate #2 ME2/2+ME3/2 RPC Link board Crate Each has 2 TMB, 1 MPC First time used full Track-Finding logic to identify tracks in data Full DAQ logging of inputs and outputs for offline comparisons L1A generation a major synchronization accomplishment for trigger Provided trigger for other subsystems Marks beginning of CSC Trigger operations at CERN Track-Finder Crate (next slide)

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 6 Track-Finder Crate Operation -- Florida, Rice, UCLA SP1SP2 (x 12) MS (x1) L1A signal distributed out of crate from CCB System of multiple peripheral crates (multiple Muon Port Cards) to TF crate Synchronization studies Multiple Sector processors to one Muon Sorter Fully functional in Beam Tests Provides trigger for the experiment Operating now for Integration tests x 1

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 7 Operate fully functional trigger electronics at CERN Employed in myriad tests & preparation activities Tests in Electronics Integration Center Labs & row of racks for all electronics subsystems Test interfaces & integration as much as possible before move to USC55 Surface & “Magnet” tests in SX5 With both HCAL and EMU More during magnet test Verify trigger functions & interfaces w/detectors on surface. Installation in Underground Counting Room (USC55) Expect start by Nov 30 ‘05 --”ready for crates” Racks & Infrastructure installed Trigger Upgrade R&D Start initial design work & technology investigations Underground Counting Room Trigger M&O Plans

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 8 Assemble one each of critical racks in central trigger core in underground counting room Trigger Install/Commission: Path to USC55 thru Prevessin 904 Contingency in case of further delays in USC 55 occupancy Starts in March Electronics Labs trigger & electronics integration racks

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 9 Install/Commission: Next Steps Magnet (a.k.a. cosmic)Test: Drift Tubes are main trigger Also trigger on CSC & RPC Trigger Distribution: test beam  emulator  final Start with demonstrated working systems and evolve to new systems in order of readiness, complexity Use final Trigger, Timing & Control (TTC) infrastructure US share of support for TTC infrastructure M&O: Partial support of engineer Tony Rohlev ($38k/yr) Trigger provided to all participating subsystems USC55: Planned start at end of 2005 All trigger systems first tested in Prevessin 904 Nothing is installed in a rack in USC55 for the first time

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 10 Trigger Install Schedule - I Install/Commission Trig. Crates: Dec ‘05 - Apr ‘06 Tested Trigger Crates installed, re-tested, interconnected, inter-synchronized Regional and Global Detector trigger systems integrated with each other and Global Trigger Integrate w/Detector Elect.: May ‘06 - Oct ‘06 Cal Trig connected to E/HCAL USC55 electronics Muon Triggers connected to optical fibers carrying trigger data from detector Global Trigger connected to TTC distribution system Operation with Local DAQ

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 11 Trigger Install Schedule - II Integrate w/Central Trig. & DAQ Nov ‘06 - Apr ‘07 Subset of triggers available to detectors in UXC55 Dedicated testing with individual detectors Detailed synchronization testing of all systems Testing with Central DAQ System CommissioningMay ‘07 - Aug ‘07 Full capability of trigger system available Tests with all detectors and trigger operating simultaneously together and partitioned Trigger and DAQ can operate in 8 separate partitions Ready for Data Taking August, 2007

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 12 CMS Electronics Installation Plans Consistent with Trigger Plans 4 month slip wrt. schedule shown at MEG Feb ‘04 Start Installation was June ‘05 in Feb ‘04 (access/cooling:USC55)

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 13 SW Development Plan Consolidate sub-systems software teams & present work: Document what exists Promote use of common technologies XDAQ, HAL, SOAP, I2O, DSTORE Consolidate hardware related layer: Hardware management in Equipment Database Board description, identification & history Agree on scheme for storage and verification of Firmware and LUT contents Configuration data Use CMS Configuration DB Infrastructure (under development) Sub-systems define their Configuration Data Schema Trigger supervision Define requirements and architecture  Documentation Integrate with RCS and trigger sub-systems Trigger testing and monitoring Translate Integration Test Plans into Software  Bldg 904 setup Trigger Online Monitoring  Use DAQ Monitoring Infrastructure Test & run trigger emulation

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 14 Physicist M&O Tasks Change trigger as beam conditions change Study new trigger configurations Test runs, Monte Carlo studies, data studies Trigger Physics Analysis Understand detailed impact of trigger on physics Preparation for luminosity increases Monte Carlo studies of new conditions, validate with present data Respond to changing apparatus Changes in material, configuration, etc.  changes in simulation Operations - 24x7 support during running Write, test & maintain electronics test programs Maintain & update bad channel list & run daily checking programs Run Control maintenance Trigger data validation and calibration Online & Offline analysis of rates & efficiencies Monte Carlo & data trigger simulation maintenance Continuous validation of trigger using simulation & readout data

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 15 Summary: M&O Personnel (does not include upgrade R&D) From Project Support: 1 / 2 / 2.25 / 2 FTE Engineers in FY04 / 5 / 6 / FTE ea. for cal. & mu trigger (designers) + PNPI 0.25 for mu 0 / 50% / 100% of this in FY04 / 5 / 6, PNPI in FY05,6 only 1 FTE (cost shared w/CERN) on TTC M&O FY04 - FY07 0 / 0.6 / 1.25 FTE Technicians in FY04 / 5 / FTE ea. resident for cal & mu visiting for cal 0 / 0.3 FTE ea. resident for cal & mu in FY04/ 5 From Base Program Support: 2.6 / 4 Ph.D. Physicists in FY05 / 6+ (ramp up in FY05) 2 physicists each for calorimeter & muon trigger Spend 50% of time on M&O and 50% on physics research. 12 Graduate Students by FY07 (ramp up starting in FY05) 6 students each for calorimeter & muon trigger 25% (e.g. training, physics, thesis) of total tenure on trigger Fewer students  more postdocs

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 16 Trigger M&O M&S Diagnostic equipment Scopes & probes, logic analyzers, computers, interfaces, etc. Construction of additional specialized test boards Repair equipment & supplies Soldering stations (BGA repair), Tools, Voltmeters, misc. supplies Module repair/replacement costs Power supplies, regulators, breakers, thermal sensors, crate CPUs, etc. Replacement of broken cables, fiber optics, etc. Vehicle lease for hauling back & forth Shipping and/or contract repair Costs Sending items back to US for major work Either to FNAL, University, or manufacturer Est. Yearly Cost of 80K$, Total for FY05-FY09: 360K$ 40K$ each for US CMS Cal. & Muon Trigger Efforts Half that for FY05 as ramp up

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 17 Foreign Contributions & Shared Resources Trigger Guidelines: Each institute maintains the hardware it built Includes Labor & M&S No exceptions Spare Parts are purchased before commissioning Shared Resources: Test facilities in Prevessin 904 CERN Electronics Pool CERN Contributions: Rack, Cable & Power/Cooling infrastructure Local engineering assistance (CMS Electronics group)

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 18 Trigger Upgrade R&D Luminosity upgrade x10 – SLHC : L = cm -2 s -1 Extends LHC mass reach by ~ 20-30% with modest changes to machine Detector upgrades needed -- especially the trigger Time scale ~ 2014 Trigger: rebuild for 12.5 ns Double operational frequency from 40 MHz to 80 MHz Processing & data transfer Design for much higher rejection power for pileup to retain output rate of 100 kHz -- more sophistication Exploit newer generation programmable devices Attempt to restrict upgrade to post-TPG electronics as much as possible where detectors are retained Only change where required -- evolutionary -- some possible pre-SLHC? Started in FY04 Workshops: US CMS in Madison Feb ‘04, CMS at CERN Feb ‘04 & Imperial College Jul ‘04. CMS SLHC Level-1 Trigger & Tracker project started. W. Smith & G. Hall (Imperial) chosen to lead effort.

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 19 CMS Trigger Upgrade Plan Current for LHC: TPG  RCT  GCT  GT Proposed for SLHC: TPG  Clustering  Correlator  Selector Trigger Primitives Regional Correlation, Selection, Sorting Jet ClusteringSeeded Track ReadoutMissing E T Global Trigger, Event Selection Manager e /  clustering 2x2,  -strip ‘TPG’ µ track finder DT, CSC / RPC

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 20 CMS SLHC L-1 Trigger R&D New Features: 80 MHz I/O Operation Level-1 Tracking Trigger Inner pixel track & outer tracker stub Reports “crude” P T & multiplicity in ~ 0.1x 0.1    Regional Muon & Cal Triggers report in ~ 0.1 x 0.1    Regional Level-1 Tracking correlator Separate systems for Muon & Cal Triggers Separate crates covering    regions Sits between regional triggers & global trigger Latency of 6.4  sec R&D program & technologies motivated by needs: Complicated Algorithms & Low Latency: FPGA’s: faster, more logic -- less custom logic -- programmable Faster and larger memories Moving more data at higher speed: Link technology: speed & integration Backplane technology: connectors & newer interconnect technology Higher Crossing Frequency: High speed clocking: low jitter - design for links Overall Complexity: Design for test, diagnostics, algorithm validation

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 21 Trigger Upgrade R&D Program Based on CMS Level-1 trigger R&D & Prototypes. Personnel requirements 0.4 / 1 FTE Engineer from Project in FY05 / 6+ Engineering Design: 0.5 FTE ea. cal. & mu (ramp up in FY05) Could be other "half" of engineer on M&O These are designers of the trigger system (institutional memory) 0.4 / 1 FTE Ph.D. Physicist from base program in FY05 / 6+ Simulation & Design Studies 0.5 FTE ea. cal & mu trigger (ramp up in FY05) M&S Requirements $40K/year for Prototypes $20K ea. for cal. & mu trigger ~ 2 prototype boards ($10K ea.) per year for cal. & muon Trigger Upgrade Estimate Total for FY05-9: 710K$ Estimated Yearly Cost of 165K$ FY06-9 (50K$ EDIA only in FY05) M&S of 40K$ for prototyping & EDIA of 125K$ for engineering Engineering cost would be in Maintenance if not upgrade R&D

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 22 Trigger M&O, R&D Plans Labor costs include minimum level of existing personnel who designed/built the system Maintain the “long- term memory” Not supported by base program Plus one shared tech.

W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 23 Trigger M&O Summary Good Progress on all fronts: CAL & EMU Triggers finishing production Operations at CERN commenced Integration tests complete or underway Software is in use and development continues M&O Activity in ‘05: Prepare for installation: Time is tight to accomplish the necessary tasks Steps taken, planning established to meet schedule Tests: Surface Tests in SX5, Magnet Test in Fall ‘05 Use of Electronics Integration Center starting March ‘05 Careful layout and plan for USC55 starting Dec. ‘05 Upgrade R&D: Design work: build on design framework established in ‘04 Investigate enabling technologies to understand implementation