1 PRR #409 Voltage Support Service from Generating Resources Timeline Date Received 4/25/2003 Date Posted 4/28/2003 Comments Due 5/19/2003 PRS Review Date.

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

Loads Acting as a Resource Relationships with QSEs and LSEs
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
System Planning & Operations Spring 2010
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Houston Area Dynamic Reactive Project March 11,
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
April 15, TAC Report to the ERCOT Board April 15, 2003.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Generator Test Data, Generator Capability Curve, and NPRR 366 Terms March 14, 2012 Mike Noth & Bracy Nesbit 1.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
WINDPOWER 2003 Austin, TX May 18-21, 2003 Session 4A: Regulatory Issues Monday May 19, :40-5:00 pm Wind Generation Interconnection to Transmission.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
PRR835 – Reactive Power Capability Requirement
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
December 15, 2003ERCOT Market Operations Group1 PRR 371 LSL clarification Chris Ngai Market Project Group.
Is Reactive Power Worth Anything? The sun sets on a lightless New York City – August 14th Reactive & Voltage Maintenance Joint Proposal by TexGenCo/Calpine.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
ERCOT PROGRESS REPORT Board of Directors Austin, Texas October 15, 2002.
Profiling Working Group December 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
1 Impact Assessment of Parking Deck NPRRs/SCRs/NOGRRs Phase 1 March 2011.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
1 Review of Aging Projects July 16, Project Prioritization – Agenda –Discussion Approach –Revision Request Project Funding History –2015 Funding.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
PRR 503 Coordination of Resources Due to TSP Section Management of Transmission Forced Outage or Maintenance Outages.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Is Reactive Power Worth Anything?
TAC Report to the ERCOT Board
Reactive Power Task Force
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Presentation transcript:

1 PRR #409 Voltage Support Service from Generating Resources Timeline Date Received 4/25/2003 Date Posted 4/28/2003 Comments Due 5/19/2003 PRS Review Date 5/22/2003 May 22 nd PRS Action: Remanded to WMS for further clarification of settlement treatment Status of PRR

2 What the PRR Seeks to do with VSS-f-GR Establish a realistic payment methodology for VSS based on an easily captured telemetry point/calculated value in ERCOT EMS (MVarh) “as delivered” Maintain the existing proposed RCVC Standard requirement for unit testing and reactive capability (URL of.95) Set trigger point for settlement for reactive delivery at a point that recognizes values of losses in generator and GSU (.98)

3 Existing Protocols Treatment Generator must maintain voltage profile [limited to MVars delivered at Max. Pf measured at MPT HV terminals] (6.5.7) Generators must maintain voltage regulation schedule without compensation to.95 Pf (6.8.4) Dispatch instructions that cause a reduction in MWs to produce more MVars paid at OOM-E Down price (6.8.4.(2)) PIP-102 boxed language: “Compensated Reactive Support” pays for reactive delivery that exceeds URL at avoided cost of reactive resources on transmission network. [PIP-102 is to be implemented on ERCOT systems this year; 2.1 Priority]

4 What are the costs to producing Mvars? Installed Capability Costs what is the appropriate value for those components of the generator equipment that make MVar production possible? Lost Opportunity Costs what is the value of the next MVar vs. the next MW? Heating Losses what is the cost in fuel to produce MVars?

5 Basis for these assertions Installed Capability Costs American Electric Power Service Corporation 88 FERC ¶ 61,141 (“AEP”) [basis for numerous FERC-approved rate filings on OATT Schedule 2] ERCOT Protocols (2) [“avoided cost of reactive support Resources on the transmission network.”]

6 Lost Opportunity Costs ERCOT Protocols (2) Numerous FERC rulings re: OATT Schedule 2 Heating Losses Stray Loss Factor (per EPRI TR V3SI) accepted in numerous FERC rulings on OATT Schedule 2 filings Incremental heating loss = Stray LF * [3*Ra*[(I a pf.85 ) 2 -(I a pf=1 ) 2 ] + [R f *[(I f pf=.85 ) 2 -(I f pf=1 ) 2 ]] Basis for these assertions (cont’d)

7 WMS task from PRS Determine a suitable settlement method for reactive delivered MVarh delivered beyond trigger (+-.98 Pf) can be calculated/integrated over an interval. Can Synchronous Condenser treatment in Protocols be used as a proxy pricing mechanism? Can some portion of the MCPE/Zone of delivery be used as a suitable price proxy if Heating Losses principle is used? Can a “(MW losses from heating) X HSC Price for Gas X 10.5 HR (customary losses treatment in ERCOT)” approach be acceptable?