Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.

Slides:



Advertisements
Similar presentations
Time Management By Zahira Gonzalez.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
TSI Nephelometer Zero Filter Assembly Zero filter valve Zero filter Zero filter motor Metal flange.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
Study What’s that? Why? How?. School does not “do stuff” to you You do stuff to school – it is active You do stuff to school – it is active This is about.
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Contents Page Versions Paige Hetherington. Version 1 Here is my version 1 of my contents page. I like the plain layout of the page because I believe it.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
T2.4 Performance Test Running in R78. Timeline T2.4 installed in R First inspection on after 200k pulses Little or no wear/dust.
How to Find Your Way Around 1. You can play the PowerPoint, and find the Test here.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Another 3U unit to be attached to top of here yet! (3U unit provides a few more LED’s and the IO to the FPGA board. It will also provide space for an additional.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
TARGET WORKSHOP – SHEFFIELD HALLAM UNIVERSITY Monday 2 March 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Target alignment with ISIS beam centre.
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
Problem solving in project management
♫ Turn on your speakers! Shared by :- imali diluka Subject: Seven Tips To Happiness.....
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
Electric Components. Basics 1 Current: electrons moving together in same direction (electrons are always moving in materials like metals but in a random.
Setting up the Ricoh C305 Press F5 to start the Presentation
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
MICE CMPB Alain Blondel 1 August spokesperson remarks CMPB MICE NEWS.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team.
PRE s ENT TO TRANSFER CASE WORK…….. ALL TO THE GEAR BOX……. -MAINTAINANCE….. -CHANGING OIL GEAR BOX…. -CHECKING OIL GEAR BOX……
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Process Success Criteria for Girls. Assessment for Learning Assessment for learning: Using the teacher’s assessment of pupils’ performance to inform planning.
MICE Target - Risk Lara Howlett University of Sheffield.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE Target l Jason Tarrant – STFC l Investigative work on T2 with plastic bearings »Stopped after >2 million cycles »Disassembly with photographic investigation.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
GWASANAETHAU IECHYD A DIOGELWCH / HEALTH AND SAFETY SERVICES HOW TO COMPLETE AN ACCIDENT & INCIDENT FORM Essential elements of an Accident & Incident Form.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Sight Words.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Chess Strategies Component Skills Strategies Prototype Josh Waters, Ty Fenn, Tianyu Chen.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
Objectives. Objective The purpose of this tutorial is to teach the viewer how to solve for the acceleration of each mass in a standard two- body pulley.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Target Installation Plan
P. J. Smith on behalf of the MICE target team.
MICE Target Report Video Conference 29/11/07
SAFETY MEETING THE SAFETY OF YOUR DOOR STARTS WITH YOU. ABESDOOR.CA
Goal Setting Life skills continued.
Presentation transcript:

Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation

Actuator Actuator continued running on leaded bronze bearings for several weeks. ~3 million pulses achieved. This bearing material appeared to solve our ‘mechanical’ problem with a ‘small’ amount of dust production ~ less than 0.01g. Unfortunately: Leaded Bronze is not ‘liked’ by ISIS from a radiological point of view. More importantly we have had a statement from David Findley who feels that we really need to eliminate the dust problem as metallic dust could damage components in ISIS.

Chris, > > Following receipt of your on Friday we have had further > discussions here about the MICE target and the dust it generates. The > bottom line is that we are really very unwilling to put into the ISIS > synchrotron a piece of apparatus that poses a risk to ISIS when the > apparatus could be redesigned to remove the risk. > > So that you can perhaps better appreciate our concerns, I've attached a > photo of Straight 7 of the ISIS synchrotron showing the MICE target in > the foreground. Two things you can also see in the photo are the left > hand side of the top of an ion pump (below the MICE target) and one of > the RF cavities (towards the top of the picture, between the lighter > green quadrupole doublet and the darker quadrupole singlet). Both of > these may be badly affected by metallic dust finding its way into them. > No doubt we could change the ion pump when it failed, but it would cost > us several days to pump the synchrotron down again, and the problem > would recur. The RF cavity contains two accelerating ~14 kV gaps, and > metallic coatings from dust on the insulators could cause severe > problems, both in the cavity itself and in the high power RF drive > system which could damage itself trying to compensate for the degrading > insulators, and repairing the damage could take at least a week. > > Perhaps these downtimes don't sound too bad to you, but several days or > a week off to change an ion pump or repair an RF cavity in the middle of > a user run is a huge black mark against us in the eyes of our users - an > extra week off would bring our availability down from our typically > acceptable 90% to an unacceptable 72%. And then of course there would > be the financial cost of the repairs as well. > > I really think you have to eliminate the dust. > > David Details…..

Actuator Clearly this has put us in a predicament! We are presently having a new material, Diamond Like Carbon or DLC, coated onto both a shaft and a bearing. The testing of this material was going to be part of our ongoing development but it now looks as though we are becoming ‘reliant’ upon this material working to give us a solution that will allow us to install within the next few months. This is not a situation we feel very comfortable about. With the current shaft design we can only coat the top bearing. We will need to redesign and manufacture both the shaft and the bottom bearing to enable DLC to be coated onto both bearings. A test shaft and bearing has been sent off and upon receipt of the DLC coated shaft (next couple of weeks) we will start to test this new material.

Actuator A couple of points: Because this is a material is a very thin coating (5um) we will need to test the actuator to at least the number of actuations that we intend to use in ISIS. If it wears through after ‘n’ million pulses then we will be producing metallic dust again! We need to ascertain what ‘n’ can be achieved. If the DLC material works this is going to take a long time. (~ 2 weeks for every 1 million actuations.) We do not believe that we will totally eliminate dust production. Two dry surfaces rubbing together will clearly produce a certain amount of dust. Whether small amounts of dust will continue be an issue if it is non-metallic is unknown. This issue clearly needs to be discussed with ISIS personnel.

Installation As Chris mentioned in the last MICO talk we were having difficulty in finding the right people to talk to at ISIS to proceed with the installation. We now have a list of the right people and we have had some short discussions with some of them. Steve Warner is really our ‘King Pin’ in terms of getting things done but we are waiting for his return off of A/L! Next week Daresbury are setting up a meeting with Steve Warner at RAL at which I (P.S.) will be present. It is intended to use this opportunity to discuss the work that needs doing and hopefully to get some realistic schedule in place. (Cable wiring and routes, motor controls etc.)

Target Removal In order to install the new target we will need the old target removing! To remove it we need to have a health physics assessment and have an RPA (Radiological Protection Assessment?) in place. We have drafted an RPA but we need to discuss this further with Paul Wright? Hopefully we will be introduced to Paul Wright next week when we come down to meet with S.W. and the engineers from Daresbury.

Conclusions Realistically, as we can no longer use the leaded bronze bearings and because we need to test the DLC thoroughly (which will involve a target shaft redesign if we are to use) then it is looking unlikely that we will be able to install the target during the short November shutdown. All cabling and other target infrastructure still needs installing at RAL– hopefully we will make some headway with the installation schedule over the next couple of weeks. The old target needs removing. We need to establish contact with the right people and get a good RPA in place. A good RPA procedure will be become even more important for future target removal as SP7 is likely to become a very ‘hot’ area.