Ground motion studies at ATF2 June 11, 2014 Orbit jitter source identification via ground motion studies at ATF2 (Results of the June run) Marcin Patecki,

Slides:



Advertisements
Similar presentations
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Advertisements

Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
Luminosity Stability and Stabilisation Hardware D. Schulte for the CLIC team Special thanks to J. Pfingstner and J. Snuverink 1CLIC-ACE, February 2nd,
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Status of the LHC optics T. Persson on behalf of the OMC-team.
Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke,
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Update of the ground motion generator of A. Seryi for ATF2 thanks to ground motion measurements in the ATF2 beam line 1 Benoît BOLZONATF2 software task.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Orbit feedback design for the CLIC ML and BDS Orbit feedback design for the CLIC ML.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner, Hector Garcia Morales 15 th of.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
J. Pfingstner, LCWS13 Jitter and ground motion studies November 13, 2013 Beam jitter at ATF2: A. Source localisation and B. Ground motion correlation Jürgen.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
J. Pfingstner Imperfections tolerances for on-line DFS Improved imperfection tolerances for an on-line dispersion free steering algorithm Jürgen Pfingstner.
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner, Hector Garcia Morales 12 th of.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Report about the ATF operations training Hector Garcia.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
FJPPL-FKPPL ATF2 Workshop Jitter studies March 18, 2014 Beam jitter localization and identification at ATF2 Marcin Patecki Jürgen Pfingstner 18 th of March.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Wakefield effect in ATF2 Kiyoshi Kubo
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
A Survey of TBT Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Tevatron Department Meeting February 18, 2005 Beams-doc-1583-v2.
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
Progress in CLIC DFS studies Juergen Pfingstner University of Oslo CLIC Workshop January.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
ATF2 Status N.Terunuma, KEK
Expected hardware status and Priority of the commissioning task
Beam jitter experiment of exchanging power supplies
Wake field limitations in a low gradient main linac of CLIC
Laboratories in Annecy working on Vibration Stabilization
ATF2 review R. Tomas ATF2 review web:
Towards a ground motion orbit feed-forward at ATF2
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Optics Measurements in the PSB
Presentation transcript:

Ground motion studies at ATF2 June 11, 2014 Orbit jitter source identification via ground motion studies at ATF2 (Results of the June run) Marcin Patecki, Jürgen Pfingstner and the ground motion team K. Artoos, St. Jannsens, A. Jeremie (LAPP), Y. Renier, D. Schulte and R. Tomas 30 th of May 2014 Many thanks for the support from the ATF team, especially T. Okugi and N. Terunuma

Ground motion studies at ATF2 June 11, 2014 Outline A.Review of the status B.Results of the first week C.Results of the second week D. Results of remote work from CERN E. Conclusions and future plan

Ground motion studies at ATF2 June 11, 2014 A. REVIEW OF THE STATUS

Ground motion studies at ATF2 June 11, 2014 A.1 Work on Synchronisation issues

Ground motion studies at ATF2 June 11, 2014 Problem: Signal used to synchronize GM and beam Signal is generated by increment of beam trigger signal. This is done in an motion controller (details have to be investigated). Large noise on signal, therefore low-pass filtering. Even whole pulses are sometimes lost.

Ground motion studies at ATF2 June 11, 2014 Jointly found solution At the workshop in Annecy in March, the issues was discussed and a solution was worked out. The KEK team will provide us with a signal that should solve all problems in the May run. Thank you! The signal is: Kicker trigger Charge signal > C_min & Bunch stretching ns NIM signal some ms signal

Ground motion studies at ATF2 June 11, 2014 A.2 Data analysis and results from corrected Data

Ground motion studies at ATF2 June 11, 2014 Evaluation of the correlation (r-value) R is the correlation coefficient. Also here the used machine model is very important. No correlation in horizontal direction. Predicted beam motion from measurements is much higher than compared to the model.

Ground motion studies at ATF2 June 11, 2014 Updated model of beam line The updated magnet strengths of the beam line were used to create an updated MADX model The MADX model was compared with the initial and updated FL models The comparison of β values in BPMs locations shows good agreement between updated MADX and FL models and disagreement with FL default model We should always use the updated magnet strengths to create a model (FL or MADX)

Ground motion studies at ATF2 June 11, 2014 Why do we see something without jitter subtraction? In the beginning of the beam line, much more high frequency ground motion than expected (sensor 1 and 2) Other sensors behave like model At this frequency, ground motion is basically uncorrelated Luckily for the experiment the ground motion seems to create much more beam jitter than expected by the model (factor 10). It seems to be beneficial to have more sensors in this region of interest.

Ground motion studies at ATF2 June 11, 2014 A.3 Plans for the experiment in May Synchronisation: Implement and test the new synchronisation hardware and software. Solve the synchronisation issue with the good sinchronization signal. The proper synchronisation should verify the correlation between GM predictions and BPMs readings. Ground motion source: Verify the high-frequent ground motion (20-30 Hz) in the beginning of the beam line by putting more sensors in this region. Check what is the possible source of this vibration. Check if this vibration is correlated with the beam motion.

Ground motion studies at ATF2 June 11, 2014 B. RESULTS OF THE FIRST WEEK

Ground motion studies at ATF2 June 11, 2014 B.1 Synchronisation improvements

Ground motion studies at ATF2 June 11, 2014 Synchronisation signal In the last run, we found a problem with the synchronisation Therefore, Terunuma-san kindly installed Wednesday a new synchronisation signal. The signal is: Trigger gate signal Charge signal (ICT) > & Bunch stretching ns NIM signal some ms signal Treshold Suppresses influence of kicker noise

Ground motion studies at ATF2 June 11, 2014 B.2 Correlation Results

Ground motion studies at ATF2 June 11, 2014 Correlation in from 22 nd of June (r -value) Highest values with the saved model: r x = 0.56 r y = 0.34 Model is not yet up to date. Next week the OTRs will be available to update the model.

Ground motion studies at ATF2 June 11, 2014 Correlation plots of measured and predicted BPM motion for the most favorable BPMs

Ground motion studies at ATF2 June 11, 2014 B.3 Ground motion Measurement

Ground motion studies at ATF2 June 11, 2014 Region with strong ground motion source Two noticable things: 1.Water pipes under girder (probably touching at one point) 2.Heavy objects one the girder (lead bricks, Dipole magnet). This could lower resonance frequency. Q1X Q2X Cooling water pipes

Ground motion studies at ATF2 June 11, 2014 Ground motion around Q1X (sorry for half finishes slides) Sensors beside each other show nearly the same result (no sensor problem) Sensor on ground shows not increased motion

Ground motion studies at ATF2 June 11, 2014 Ground motion further upstream Two Sensor 1.At kicker location on floor (no increase of ground motion) 1.On Q7RX slightly increase (especially at higher frequencies)

Ground motion studies at ATF2 June 11, 2014 Ground motion on the girder and table of Q1X and Q2X Sensor on girder shows different motion than sensor on table with Q1X

Ground motion studies at ATF2 June 11, 2014 C. RESULTS OF THE SECOND WEEK

Ground motion studies at ATF2 June 11, 2014 Sensors on top of quadrupoles Correlation Beam jitter Correlation much higher vertically than before: r y = Correlation horizontally is gone: sensor 3 and 4 have been moved! Beam jitter is about 20% vertically and 5% horizontally.

Ground motion studies at ATF2 June 11, 2014 Predicted vs. measured ground motion BPM in MQF19X In vertical direction A bit of propaganda, since this is the most favorable BPM.

Ground motion studies at ATF2 June 11, 2014 Remove hanging cooling water tube from girder Correlation Beam jitter Vertical correlation is reduced to maximal: r y = Horizontal correlation is gone: sensor 3 and 4 have been moved! Beam jitter is reduced vertically from 20% to 16%.

Ground motion studies at ATF2 June 11, 2014 Turn off the cooling water pipe for the vacuum system Correlation Beam jitter Vertical and horizontal correlation only slightly reduced. Vertical beam jitter is further reduced from 16% to 14%.

Ground motion studies at ATF2 June 11, 2014 D. RESULTS OF REMOTE WORK FROM CERN

Ground motion studies at ATF2 June 11, 2014 Work from the ATF team at the week-end Even though the water has been turned of in the touching pipe, there were mechanical connections to the other pipes. Also the ATF team found a similar situation (touching pipe) for one girder slightly further upstream. Both girders have been moved so that they do not touch the cooling water pipe anymore. Measurements were performed to observe the results on the beam jitter and the quadrupole motion.

Ground motion studies at ATF2 June 11, 2014 Vertical motion (PSD) Motion of Q1X and Q2X is significantly reduced. Only at Q2X there is still a spike at 24.5Hz

Ground motion studies at ATF2 June 11, 2014 Horizontal motion (PSD) Motion of Q1X and Q2X is reduced, but still very large. Could be interesting to measure the transfer function from ground to quadrupole. Sensor 4 is not working (cable is not the problem).

Ground motion studies at ATF2 June 11, 2014 Result after removing of all found cooling water excitations (Wednesday last week) Correlation Beam jitter Vertical and horizontal correlation significantly reduced (nearly gone). Vertical beam jitter is again at a level of about 20%???

Ground motion studies at ATF2 June 11, 2014 Dispersion measurement Sorry for the plots! Horizontal dispersion is normal. Vertical dispersion is far too big 0.6m at highest point. Likely to be an explanation for the increased beam jitter. Horizontal Vertical

Ground motion studies at ATF2 June 11, 2014 Result after removing of all found cooling water excitations and dispersion correction (Tuesday this week) Correlation Beam jitter Vertical and horizontal correlation significantly reduced (nearly gone). Vertical beam jitter is again at a level of about 19%???

Ground motion studies at ATF2 June 11, 2014 E. CONCLUSIONS AND FUTURE WORK

Ground motion studies at ATF2 June 11, 2014 Conclusions With the new synchronisation strategy, there is a significant correlation between the motion sensor data and the BPM measurements. This correlation is even increased, if the sensors are put on top of the quadrupoles: r y =0.75. There is a significant difference of the motion of the girder and the quadrupole, which was not expected (calculate transfer function). Also the girder moves much more then the quadrupole. Two excitations of the girder have been found: hanging cooling water tube and a touching cooling water pipe. After removing them, the beam jitter was reduced from 19% to about %. This factor sqrt(2) corresponds to half the power and therefore half the sources have been removed!

Ground motion studies at ATF2 June 11, 2014 Conclusions cont. The cooling water pipes have been removed from the girders. A second position further upstream was also found where the pipes touch the girder (has been removed as well). Surprisingly the jitter has been again about 20%! Possible guess to explain the observations: –By moving the pipes, a new source has been introduced (pipes touching somewhere else)? Possible future work Equip the two quadrupoles further upstream temporary with sensors (high radiation area) to observe is there is motion correlated with the beam jitter. We have now a way to create sufficient beam jitter to measure correlation (hanging tube). We could start correcting this correlation (Marcin’s PhD?).

Ground motion studies at ATF2 June 11, 2014 Thank you for your attention!