Parc des Chutes- de-la-Chaudière Mini Hydro Project: Enhancement Through Development Lessons from a success story by Jean–Pierre Fau and Guy Dufort.

Slides:



Advertisements
Similar presentations
Rouge Park Governance Review. Rouge Park is… A major regional park in York and Durham Regions and Toronto, accessible by public transit throughout the.
Advertisements

The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Glen Canyon Dam Adaptive Management Program WY 2000 Low Steady Summer Flow Randy Peterson, BOR Barry D. Gold, GCMRC A Test of Concept.
KEEPING WATER ON THE LAND Brandon Workshop March 20, 2013.
| 1 The Municipal Farm Sustainable Reuse Plan Project funded through a Brownfields Area-Wide Planning Pilot Grant from the United States Environmental.
Exploring Trading to Reduce Impacts of Acid Mine Drainage: Cheat River, West Virginia Evan Hansen: Downstream Strategies, LLC Paul Ziemkiewicz, Jerry Fletcher,
Charlie Lake Sewer Collection System & Lagoon Upgrades Thursday June 20 th, 2013.
CITY OF SAN MARCOS/TEXAS STATE UNIVERSITY 2015 WORK PLAN BUDGETED CONSERVATION MEASURES.
Norwegian Water Resources and Energy Directorate
DRAFT SUSTAINABLE COMMUNITIES CLIMATE ADAPTATION GUIDEBOOK Kate Marshall, SRA International, Inc. (703) ,
Conowingo Hydroelectric Power Station and Muddy Run Pump Storage Facility Welcomes the Citizens Advisory Committee.
Consultant en énergie éolienne au service du monde Wind energy consultant for the world Wartenbe Wind Energy Project by Dokie Wind Energy Environmental.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
Hydropower Development: Experience of Nepal
OVERVIEW – SUNDANCE WIND PROJECT PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND Ron Percival Avro Wind Energy Inc. October, 2014.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
June 26, PCWA - Middle Fork Project Project Operations
Central Lutheran Church & Mississippi Watershed Management Organization Central Cares for Creation (C3) Ministry Team Fiscal and Property Committee Ron.
46 mini/micro hydro plants KP Pakistan
One Land – Many Stories: Prospectus of Investment Department of Sustainability, Environment, Water, Population and Communities December
THE OFFSHORE SITUATION IN GREECE Municipality of Corfu.
City of Brisbane Open Space & Ecology Committee April 27, 2006 Baylands EIR Scoping.
11-4 How Should We Protect and Sustain Wetlands?
Integrating Water Management Statewide Integrated Water Management (IWM) Gary Bardini, Deputy Director IWM Rijkswaterstaat & California Coordination Kickoff.
Blackstone Hydropower Status Report 3 rd Annual River Users Conference Blackstone Valley Tourism Council Tricia Jedele, Conservation Law Foundation Bruce.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
CONSERVATION COMMISSION TRAILS come in all shapes and sizes based on community need and vision.
City of Puyallup Planning Commission Presentation February 8, 2012.
Generate 2010: ‘Getting it Done’ Small Hydro Development – Technical Basics 7 November, 2010.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Growth Management Legislative Discussion March 20, 2012.
Masayuki Okumura. Faculdade de Medicina Universidade de S. Paulo (Brazil) INTRODUCTION: INTRODUCTION: The traditional Hydroelectric plants supplying the.
Water issue in Lithuania Ramučiai Gymnasium Naujoji Akmenė Lithuania.
SUSTAINABLE LIVELIHOODS – EPWP AND TOURIST GUIDES 23 AUGUST 2011.
BECC Certification Criteria. Our Role in the US/Mexico Border  The Border Environment Cooperation Commission and the North American Development Bank.
Middle Fork Project Project Description April 25, 2006.
Power Plant Construction and QA/QC Section General Features of Hydro Electric Project Engineering Technology Division.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
ELLEN BRENNA AND ANDREW ORTHOBER 9/30/11 The Effects of Hydropower on Rural Communities.
THE ROLE OF ECONOMICS IN THE IMPLEMENTATION PROCESS WFD "eco procedure" in practice.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
Habitat Restoration Area PLEASE DO NOT DISTURB THE VEGETATION BEYOND THIS FENCE CAUTION: STRONG CURRENTS, UNEVEN RUGGED AND SLIPPERY WALKING SURFACES THANK.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Biggest hydroelectric power plants in world
Rapid Bioassessment Protocols for low gradient streams) for species richness, composition and pollution tolerance, as well as a composite benthic macroinvertebrate.
Taunton River Wild & Scenic Study A Partnership Effort on Behalf of The Taunton River.
WELCOME 1.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
Hydropeaking and minimum flow : the French approach. P. Baran CIS ECOSTAT - HYDROMORPHOLGY WORKSHOP 12th and 13th June Brussels Pôle Ecohydraulique.
A training package for local biodiversity planning Biodiversity planning Concepts and approaches.
IDEM FIELD HEARING Renewal of ASU Operating Permit December 15 th, 2015 Protect Our Ground Water and the Indian Creek Watershed STOP!
Erdeneburen HPP Project Implementation Unit
British Columbia’s Water Sustainability Act and regulations Southern Interior Local Government Association April 22, 2016 Tina Neale Ministry of Environment.
MACQUARIE RIVER CATCHMENT WATER MANAGEMENT PLAN PUBLIC MEETING ( Information Session) ROSS TOWN HALL 10:30 AM WEDNESDAY, 12 DECEMBER, 2012 Department of.
Christopher Melson Department of Civil and Architectural Engineering University of Wyoming.
Warren A. Witt Director of Hydro Operations Ameren Missouri
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Small Hydropower Market Price, Packaging Trends, Industry Outlook & Forecast.
Nunavut Water Board Public Hearing
Savannah River Projects
Micro-hydro Understand the fundamental principles and
Using Models to Explore Options for Middle Oconee River Management
DG Environment, Nature Protection Unit (D3)
Hydropower and the WFD: constraint or opportunity?
Review of Parks Canada’s Planning Permit Process
Review of Parks Canada’s Planning Permit Process
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

Parc des Chutes- de-la-Chaudière Mini Hydro Project: Enhancement Through Development Lessons from a success story by Jean–Pierre Fau and Guy Dufort

Parc des Chutes-de-la-Chaudière Mini Hydro Project 2 Development –2000 Transfer of public water rights to Innergex Impact study –1995 Public hearings –1997 Project approvals and licensing Project construction –1999 Commissioning

3 Location

4 The urban setting in 1929

5 The first powerhouse in 1901

6 The powerhouse in 1920

7 Turbine Layout Two of the three turbines generating a total of 3.5 MW

8 Spring breakup in 1969

9 Breach in the dam 40 meter breach in the dam The old power station was decommissioned in 1970

10 The urban setting in 1994

11 Chaudière Falls before the project Before the mini hydro development, Parc des Chutes-de-la-Chaudière was almost totally abandoned. Public access to the park was poorly indicated. Trails were badly maintained and sometimes dangerous. Two old and unattractive structures remained, the old dam and the intake. There was no government or municipal funding.

12 Parc des Chutes-de-la-Chaudière Mini Hydro Project Project on the Chaudière River Located at the 35-meter-high falls in Parc des Chutes-de-la-Chaudière Located in a public park in a fast-growing city (Lévis) on the south shore of the St. Lawrence River near Quebec City and bordered by two highways 254-meter-long,7-meter-high concrete dam on the falls Installed capacity of 24 MW with two horizontal Kaplans

13 Strong focus on environmental integration from the start Innergex, the promoter of the Chaudière project, paid special attention to environmental integration from the beginning of the project. The company’s bid proposal included integration principles that were maintained and improved throughout the implantation process. These included— Enhancement of the falls and maintenance of an esthetic discharge during the summer season Maintenance of an ecological discharge to preserve downstream fish habitats all year round Architecturally pleasing powerhouse design No switchyard Establishment of a special fund dedicated to restoring and maintaining public park infrastructures Maintaining public access to the powerhouse

14 Consultation - Information The search for community consensus A methodical, broad-reaching approach Transparency An ongoing presence Continuous information before and during construction

15 Integrating the works into the park Preserving the aquatic ecosystem between the falls and the tailrace outlet Maintaining the visual appeal of the falls Three key issues

16 First issue: controlled esthetic flow Protect the visual appeal of the falls by maintaining a flow rate of between 25 and 37 m 3 /s during the day, natural water supplies permitting.

17 Before - 39 m 3 /s After - 25 m 3 /s After 25 m 3 /s Before 39 m 3 /s

18 Before - 16 m 3 /s After - 15 m 3 /s Before 16 m 3 /s After 15 m 3 /s

19 Second issue: aquatic ecosystem Maintain a minimum ecological controlled flow rate of 4 m 3 /s, natural water supplies permitting

20 General design

21 Third issue: integration of works Real view from the footbridge Anticipated view from the footbridge

22 Architecture Real view from the tailrace Anticipated view from the tailrace

23 Interpretation Typical interpretation panel Powerhouse roof and skylights

24 A few figures $350,000 for park redevelopment $346,000 lump sum payment $100,000 annually

24 Coffer dam on the west bank Dry construction of project works

25 The two penstocks

26 Lessons learned The Chaudière mini hydro project was a challenging project in a public park just south of Quebec City. The keys to success were— A comprehensive approach integrating financial, social, and environmental values shared by the developer, project designers, and the community An open-minded attitude and a willingness to listen The patience to give the community the opportunity to express its concerns The community got involved when ecologists were using their standard arguments against the project.

27 In short Vision Flexibility Shared values