PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis
Basis of Assessment Building Inspection Report ODM’s TSO Risks Assessment TSO Report Visit Analysis
Criteria used during visit Structure – Roof, Façade, Walls, Floors, Windows, Doors, Corridors, Stairs Infrastructure – Electricity, Plumbing Safety – Detection, Evacuation, Emergency Lighting, Signage, Fire Doors, Fire Fighting Equipment
Buildings 25,70, 155, 166 and of 3 Structure – Roof (wood/ethernite). Large crack (bldg 25). Some leaks from skylights. – Facade. Paintwork. – Windows. Rotting frames with single glazing. Some blinds to be replaced. – Bldg 70 is all wood construction. Infrastructure – Electricity to be checked (circuit breakers)
Buildings 25, 70, 155, 166 and of 3 – Flooring, mezzanine 155 – maximum load assessment – Access, paving (exterior) to be consolidated – Heating inefficient (Bldg 16, full renovation required)
Buildings 25, 70, 155, 166 and of 3 Conclusion – Large amounts of wood are employed in the construction of parts of this building complex (roofing, corridors, offices). – The long term viability of the complex should be assessed and if kept investment should be considered for fire detection, protection and evacuation.