Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS +1-443-430-8089.

Slides:



Advertisements
Similar presentations
1 CCSDS Security Working Group Fall 2008 Meeting October 2008 Berlin Germany.
Advertisements

7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.
Security WG: Report of the Fall 2005 Meeting Atlanta GA September 16, 2004 Howard Weiss NASA/JPL/SPARTA.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
1 CCSDS Security Working Group Fall 2010 Meeting October 2010 British Standards Institute London, UK Howard Weiss NASA/JPL.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
1 CCSDS Threat Document Discussion CCSDS Security Working Group Fall 2004 Meeting CNES, Toulouse FR Howard Weiss NASA/JPL/SPARTA
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Security WG: Report of the Spring 2008 Meeting Marriott Courtyard Crystal City, VA March 14, 2008 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
1 CCSDS Security Working Group Spring 2014 Meeting 31 March – 1 April 2014 Noordwijkerhout, The Netherlands Howard Weiss NASA/JPL/PARSONS* Identity crisis:
1 Document Status CCSDS Security Working Group March 2008.
1 CCSDS Security Working Group January 25 Telecon.
SM&C WG Plenary CCSDS Spacecraft Monitoring & Control WG (SM&C) Workshop #17, Darmstadt (D), Apr 2012 Mario Merri, ESA/ESOC, Chairman.
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
Security WG: Report of the Spring 2006 Meeting Rome, Italy June 16, 2006 Howard Weiss NASA/JPL/SPARTA
Security WG: Status Briefing Cleveland, Ohio USA 15 October, 2012 Howard Weiss NASA/JPL/SPARTA skype: hsweiss.
KM SDLS Extended Procedures YB
The CCSDS Security WG is chartered to:
Security WG: Status Briefing
Security WG: Report of the Fall 2005 Meeting
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
CCSDS Systems Engineering Area: Security Working Group
Security WG: Report of the Spring 2016 Meeting
SPACE INTERNETWORKING SERVICES (SIS) AREA
Security WG: Report of the Fall 2013 Meeting
Delta-DOR WG: Report of the Fall 2010 Meeting
Presentation transcript:

Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS

Meeting Agenda 9 November 2015 – 08:45 – 09:45: CCSDS Plenary – 09:45 – 10:45: Systems Engineering Area (SEA) Plenary – 10:45 – 12:30: Joint meeting with DTN WG – 13:30 – 17:30: Security WG – Welcome, introductions, logistics, agenda review – Review results of Spring 2015 (Pasadena) meeting – Status of documents, action items – Future work areas for CWE Framework – Reconfirmation/review of published SecWG documents – Charter review (if required) – D/Chair discussion (all) – Review the new programs list (all) – CCSDS Credentials Program (Weiss) – Federation – Cloud Testing Update (Bailey) – Cloud Security (Aguilar-Sanchez) – ESA Secure Software Development Update(Fischer) – ESA/ESOC visit – Working Group Dinner

Meeting Agenda (cont) 10 November 2015 (08:45 – 17:30) – Network Layer Security » IPsec Testing + Yellow Book Status (Sheehe/Airaud) » Network layer security for non-IP environments (Fischer/Aguilar- Sanchez) – Key Management Blue Book (Fischer/Aguilar-Sanchez) » KM for SDLS extended procedures (Fischer) Extended procedures implementation (Koisser) » KM Green Book – Link Layer Security Update Discussion (Biggerstaff/Weiss/Aguilar- Sanchez/Fischer) – Physical Layer Security (Aguilar-Sanchez) – Proposed new areas of work – continuation of discussions – Other areas of discussion – EUMETSAT visit 11 November 2015 – 08:45-17:30: Space Data Link Security WG 12 November 2015 – 08:45-13:00: Space Data Link Security WG – 16:00-17:30: SEA Wrap-up Plenary

Attendance NameOrganization Address Howard Weiss Gordon BlackUK Space Daniel Ignacio Chuck Dorothea Julian Guillaume Brandon Craig David Jia Tony JamesGEO

Executive Summary  Attendees from UK Space Agency, ESA/ESTEC, ESA/ESOC, DLR, CNES, CNSA, EUMETSAT, GEO Space, NASA/GRC, NASA/GSFC, NASA/JSC, and NASA/JPL.  We held a joint meeting with DTN to continue our work on DTN security and the inclusion of CMS into the bundle security specification.  We revisited our previous discussions on SecWG future programs and edited and adjusted the previous list.  Reviewed action items from Pasadena. Nearly all the assigned action items from Pasadena were completed. Several that have been carried forward from several meetings were once gain carried forward.  We discussed the five SecWG books up for reconfirmation. We will revise (CCSDS Protocols to Secure Systems), move both G (Encryption Survey) and G (Authentication Survey) to historical, and revise G (Interconnection Guide) G (Threat Green Book) has already been revised.  We discussed the appointment of a Deputy WG chair. The WG will take a “silent” ( ) vote to decide between the two candidates.  Reviewed Network Layer Security adaption profile testing. Testing is near completion.  Discussed the “white paper” on cloud-based testing environment architectures and its conclusions & recommendations.  Discussed the “credentials” new program and what constitutes the program. A “white paper” will be created to document our current thoughts for further review.  Reviewed ESA Secure Software Initiative which will soon be published as an ESA standard. Also reviewed the analogous NASA work.  Discussed the changes to the Key Management Magenta Book and ESA provided a demonstration of the OTAR key management mechanisms using the ESA simulator.  Discussed the future potential for a program on physical layer security.

Summary of Goals and Deliverables 1. Revised future SecWG programs list. 2. KM Magenta Book is progressing. 3. Met with DTN on security. 4. NASA/GRC and CNES Network Layer Security testing is completing. 5. Reviewed cloud computing testing environment white paper. 6. Discussed the constitution of the credentials program – what it should include and how it should be accomplished. 7. Reviewed the five Security WG documents which were up for review: one was already revised, two additional will be revised, and two will be retired to historical status.

SEA Area MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.Security WG Goal: Working Status: Active _X_ Idle ____ Summary progress: documents actively being produced: Key Management MB, Network Layer BB, Cloud Testing. All docs green. Progress since last meeting: threat GB rev complete, network layer security testing, KM MB progress, DTN Security. Problems and Issues: None status:OKCAUTIONPROBLEM Comment: Working Group is advancing and producing good products. Docs OK.

Near-Term Schedule DeliverableMilestoneDate Key Management Magenta Book Continue drafting next revision01/16 Network Layer Profile Completed per testing results feedback 02/16 Network Layer Yellow Book Final01/16 Cloud Testing White paper12/15

Future Work Areas  (1) Credentials (2016) (NASA, ESA, DLR, CNES)  Certificate management (separate doc?)  (2) Secure Software GB ( ) (to be reviewed) (ESA, NASA)  (3) Link layer security for future unified space link protocol (migration of SDLS). (2018)  (4) Network layer over space packets (2017) (ESA)  (5) Application layer security (protecting the app layer):  TLS; (2018)  providing security services via the application layer (KM, etc) eg., SM&C MOS (mission operation services). (2020)  SDLS Extended Procedures Green Book (2017)  SDLS Extended Procedures Yellow Book (2016)  Network Layer (IP) Security Green Book  DTN Security (underway in DTN WG)

Open Issues  See next slide:

Resolutions to be Sent to the CESG and Then to CMC: To reiterate from Pasadena  Resolution: The SecWG will be actively engaged in the review of all Red Books:  Levels of involvement range from cursory examination of the Red Books under development, to active involvement in the development of the books. Response: AD will provide docs to the WG for review in parallel with AD review.  Resolution: All CCSDS document editors will reach out, early in the development of the book to the SecWG to reduce downstream security issues. Response: AD will provide “pointers” to WGs for SecWG  Resolution: Security shall be addressed in all new project initiations. All new projects should consider the extent to which security is relevant. Considerations will be documented in the project initiation request. Response: AD forwards new projects definitions to SecWG to analyze security implications & to work with the initiating WG.

Action Items Item NumberAction Item:Assigned to:Date Due: SecWG1115:1Review all other CCSDS WGs to determine if they should be working on security. Gordon Black02/01/16 SecWG1115:2Discuss SM&C security related activitiesDaniel Fischer12/15/15 SecWG1115:3Revise and update CCSDS G (security protocols) – 1 st draft Howard Weiss, Craig Biggerstaff, Daniel Fischer, Ignacio Aguilar- Sanchez 03/01/16 SecWG1115:4Move G and G to historical status Howard Weiss11/30/15 SecWG1115:5Revise and update CCSDS G (interconnection guide) – 1 st draft Craig Biggerstaff + EUMETSAT, ESA, CNES, UKSA, NASA, DLR 03/01/16 SecWG1115:6Vote for the candidate of your choice for Deputy Security WG chair All11/30/15 SecWG1115:7Review the Strategic Plan materialsAll11/30/15

Action Items Item NumberAction Item:Assigned to:Date Due: SecWG1115:8Revise Cloud Testing white paper and circulate to the WG for review. Brandon Bailey12/1/15 SecWG1115:9Draft a white paper to document the direction that should be considered for the credentials program Chuck Sheehe01/15/16 SecWG1115:10Update the KM “magenta” bookDaniel Fisher01/15/16

Resource Problems  Resources had been adequate to perform the current tasks although personnel have only limited time percentage to apply to CCSDS tasks.

Risk Management Update  Must ensure that the current trend of additional resources remains and that resources don’t shrink.

Cross Area WG/BOF Issues  Joint meeting with Space Data Link Security (SDLS) WG  SDLS joint meeting with CSTS and USLP  Joint meeting with Disruption Tolerant Networking (DTN) WG

New Working Items, New BOFs, etc.  Credentials.