CEAA 2012 EA PROCESS OPTIONS OCTOBER 15, 2012

Slides:



Advertisements
Similar presentations
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Advertisements

Canadian Environmental Assessment Act, 2012 Presentation To Geology Matters, November 2012.
Environmental Assessment in Nova Scotia
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Federal EA and the Canadian Environmental Assessment Act, 2012 Presentation to the Bras d’Or Lakes Collaborative Environmental Planning Initiative (CEPI)
Responsible Resource Development April 17, Context Government focussed on responsible development of Canada’s natural resources to create jobs and.
The Canadian Environmental Assessment Act 2012 and Aboriginal Consultation November 2012.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Environmental Project Commitments The Alberta Experience
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Andersonlloyd.co.nz Auckland, Christchurch, Dunedin, Queenstown 18 May 2015 Reform of Resource Consent Application Process Presenter Rachel Brooking.
Office of the Auditor General of Canada The State of Program Evaluation in the Canadian Federal Government Glenn Wheeler Director, Results Measurement.
ENVIRONMENTAL ASSESSMENT OF CANADIAN MINING PROJECTS ABROAD CML 1105I MARCH 12, 2013.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
CAMPUT 2015 Energy Regulation Course Donald Gordon Conference Centre Queen's University, Kingston, Ontario Role of Tribunal Staff, Interveners and Independent.
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
International Auditing and Assurance Standards Board The Clarified ISAs, Audit Documentation, and SME Audit Considerations ISA Implementation Support Module.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
CEAA REGULATIONS AND PROCESS OPTIONS SEPTEMBER 24, 2012.
LEGISLATING CEAA 2012 OCTOBER 1, Overview CEAA Seven-year Review ENGO Engagement in Seven-year Review Industry Engagement in Seven-year Review Environment.
ENVIRONMENTAL ASSESSMENT UNDER ABORIGINAL LAND CLAIM AGREEMENTS FEBRUARY 23, 2012.
DECISION-MAKING, FOLLOW-UP AND ENFORCEMENT OCTOBER 15, 2012.
What is Necessary to Ensure Natural Justice in EIA Decision-making? Angus Morrison-Saunders Senior Lecturer in Environmental Assessment School of Environmental.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Positive Train Control Infrastructure: Section 106 Review Process under the Advisory Council on Historic Preservation’s May 2014 Program Comment For More.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
ODOE Presentations and EFSC Standards Presented by Max Woods and Sarah Esterson September 18, 2015.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
PUBLIC PARTICIPATION IN RESOURCE DEVELOPMENT - LEGAL FRAMEWORK APRIL 2, 2013.
PUBLIC PARTICIPATION IN ENVIRONMENTAL ASSESSMENT MARCH 15, 2012.
THE BIOSAFETY BILL, 2007 JACARANDA HOTEL, 26 TH JULY 2007.
PUBLIC PARTICIPATION IN ENVIRONMENTAL ASSESSMENT NOVEMBER 12, 2012.
ENVIRONMENTAL ASSESSMENT AND ABORIGINAL LANDS AND PEOPLES NOVEMBER 5, 2012.
Canada’s Federal Environmental Assessment Regime Presentation to the Forum of Federations Environmental Assessment Conference Ottawa, Canada September.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Nwtboardforum.com For reference only. Not a legal document Inuvialuit Settlement Region.
THE SPECIES AT RISK ACT (SARA) CBA/Justice National Section Meeting National Environmental Energy Resources Law Group Ottawa – October 24, 2004.
INTRODUCTION CANADIAN ENVIRONMENTAL ASSESSMENT ACT (CEAA) FEBRUARY 16, 2012.
INTRODUCTION TO CANADIAN ENVIRONMENTAL ASSESSMENT ACT (2012) MARCH 19, 2013.
Environmental Assessment Act – Overview Environmental Media Group.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Mackenzie Gas Pipeline The Policy Landscape and the Road Forward Tind Shepper Ryen The Policy Landscape and the Road Forward Tind Shepper Ryen.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
INTERNATIONAL AND TRANSBOUNDARY ENVIRONMENTAL ASSESSMENT LAW OCTOBER 29, 2012.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
1 First Nations Economic Development Readiness Questionnaire Presented By: Ontario First Nations Economic Developers Association and Ministry Of Economic.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
Phillipa Silcock Using and discharging conditions.
EIA approval process, Management plan and Monitoring
The Rulemaking Process
What is Necessary to Ensure Natural Justice in EIA Decision-making?
WARD 5 ETOBICOKE- LAKESHORE TOWN HALL MEETING
Tribal Authority Rule (TAR) Overview
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Overview of the Children and Families Act 2014
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Complaints Investigation Presenter: Ms H Phetoane Senior Investigator :HealthCare Cases Prepared for OHSC Consultative Workshops.
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
Presentation transcript:

CEAA 2012 EA PROCESS OPTIONS OCTOBER 15, 2012

Overview EA Process under CEAA 2012 Screening Environmental Assessment (Standard) Panel Review S. 67, 68 Reviews

CEAA 2012 Pr PROCESS

Screening (Sections 8 – 12) True screening of projects, not to be confused with CEAA screenings Doesn’t apply to NEB, CNSC projects or Minister-designated projects s. 8.(1) Project description to be provided s. 8.(1) Agency may require amended description within 10 days (s.8.(2) if “decision cannot be made” because description “incomplete” or lacks “sufficient details”

Screening (Sections 8 – 12) Internet posting of description summary s.9 Public comments within 20 days s. 9.(c) Within 45 days after posting, Agency must: conduct screening s. 10.(a) decide if environmental assessment required s. 10.(b)

Screening (Sections 8 – 12) Agency must consider following s. 10.(a) factors: “Description of the designated project” “Possibility that the carrying out of the project may cause adverse environmental effects” “Comments received from the public” “Results of any relevant study by a committee established under section 73 or 74”

Environmental Assessment (Standard) Similar to CEAA comprehensive study Undertaken by Responsible Authority (Agency, NEB, CNSC) S. 15 Notice and Consultation requirements ss. 17, 18 EA must assess factors set out in s. 19.(1) RA must ensure EA is conducted, report prepared s. 22

Environmental Assessment (Standard) RA must ensure public “provided with an opportunity to participate” s.24 RA must post draft report, provide opportunity for public comments s. 25

Environmental Assessment (Standard) RA/Minister required to make project decision within 365 days s. 27.(1), (2) Time spent by proponent with respect to EA not included in 365 days Minister may grant an extension of up to three months s. 27.(3) Process requirements for EAs carried out by NEB tailored to specific NEB regulatory processes.

Panel Reviews Independent ad hoc panel s. 42.(1) Mandatory public participation and funding s. 57, 58 Mandatory hearings with opportunities to present evidence and question witnesses

Panel Reviews Minister has 60 days from notice of commencement to refer an environmental assessment to a panel review s.38.(1) No panel reviews are permitted for NEB, CNSC projects (already have regulatory hearings) s.38.(6) One-person panels are now permitted, (previously a minimum of three) s.42.(1)

Panel Reviews Minister specifically authorized to seek further information from the proponent after reviewing the panel report and before making a final project decision. Overall timeline of 2 years for panel reviews imposed s. 38.(3) Minister may authorize 3 month extension Time spent by Proponent to provide information requested by Panel not included. S.48.(a)

Panel Reviews Minister may terminate panel review if failure to report within specified period s. 49.(1) Agency required to complete terminated review s. 50

Federal Lands Process (S. 67) Applies to projects to be carried out on federal lands (National Parks, National Wildlife Areas, Indian Reserves) No CEAA 2012 EA is required Authority required to decide whether project “likely to cause significant adverse environmental effects and if so, whether effects “justified in the circumstances” Doesn’t apply to projects with interprovincial effects

Projects Outside Canada (S. 68) Applies to projects to be carried out outside Canada by federal authority or to projects outside Canada receiving financial assistance by federal authority No CEAA 2012 EA is required Authority required to decide whether project “likely to cause significant adverse environmental effects and if so, whether effects “justified in the circumstances”