ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Status and Prospects for the AD and ELENA
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
AD start-up 2014 A rough and brief summary MSWG 16/01/2015T.Eriksson BE/OP1.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
ATC/ABOC 2007T. Eriksson CERN AB/OP AD Machine and Experimental Areas – Operation and major problems in 2006, outlook for 2007.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Run 10 Start-up Status
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
ELENA installation progress F. Butin / ELENA collaboration.
Parameters of ejected beam
Status of HESR 18th March Gießen Dieter Prasuhn.
Overview of Extra Low ENergy Antiproton ring (ELENA) and TE-EPC contribution to the project TE-EPC Group Meeting Michal Dudek 25th June 2015.
ELENA installation and commissioning status
A.Lachaize CNRS/IN2P3 IPN Orsay
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
Installations up to Start of Commissioning
Alternative/complementary Possibilities
Auxiliary Positron Source
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
ELENA Extra Low ENergy Antiproton Ring
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
I-LHC NOMINAL ions beam in 2007
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
PSB magnetic cycle 900 ms MeV to 2 GeV
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Achieving Nominal Ion Beam PS Ion Progress
ELENA beam commissioning
Electron Cooling in ELENA - observations and plans
Some Thoughts on the JLEIC Ion Injector
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1

General planning 12/11/2015T.Eriksson CERN BE/OP/AD2

General installation planning 12/11/2015T.Eriksson CERN BE/OP/AD3

Commissioning key dates (baseline) So far and imminent: AD ejection line modification & validation: completed / in operation Kicker pulse generators tested Ion source installation & initial tests: completed Ion source & Ion switch commissioning: early 2016 (Feb/Mars.) 1:st part of AD to ELENA transfer line: could this be done during 2016 AD start-up ?(April.) EPC/Vacuum ? 12/11/2015T.Eriksson CERN BE/OP/AD4

Beam commissioning key dates (baseline) ELENA ring HW installation & tests completed by 5/7/2016 – All equipment tested incl. controls/SW Ring commissioning with Ions & Pbars (ppm) 5/7 – 14/ ; ~ 4 months. Pbar shift plan with AD users Ion operation could continue >14/11 if compatible with shutdown work 2016 physics run ends 14/11, by this date we will know more about: – Deceleration efficiency – Beam cooling performance – Emittances – Lifetime => decision point for new ejection line installation 12/11/2015T.Eriksson CERN BE/OP/AD5

ELENA setting-up keV 1 Hz, ring in normal polarity & reverse direction: – Finalise set up of xfer line from source: need BTV:s, BPM – First injections & circulating beam: need ring BPM:s, tune msmnt, Schottky system – Orbit/tune/coupling/chromaticity: validation of systems, corrections: need RF – Acceptance check/studies: need scraper system – Lifetime/blow-up rates – Lattice validation with orbit response msmnts – Study effects of e-cooler solenoids – Acceleration tests & ramp corrections: further RF setup needed incl. B-train – Repeat at intermediate & top plateau 12/11/2015T.Eriksson CERN BE/OP/AD6

ELENA setting-up keV 1 Hz, ring in normal polarity & normal direction: – Set-up e-cooler – If H- lifetime is too short: use protons, ring in reverse polarity & normal direction, additional corrections might be necessary later for pbar operation due to remanence effects – Recombination detection (protons), additional tool for alignment/tuning – Extensive use of scraper system for profile and emittance msmnts – Schottky analysis for long. Emittances – Cooling time studies – Lifetime/blow-up rates 12/11/2015T.Eriksson CERN BE/OP/AD7

ELENA setting-up keV protons or 1 Hz, ring in reverse or normal polarity & normal direction: – Initial setting-up of the extraction and ejection lines (only short sections installed at this stage for main and GBAR lines) – Need u-wire monitors + high sensitivity intensity msmnt pickup in lines 12/11/2015T.Eriksson CERN BE/OP/AD8

ELENA setting-up MeV Hz, ring in normal polarity & normal direction: – Set-up transfer line from AD : need BTV, GEM, TFA7049, BPM. (optics validation) – RF synchro s-u for bunch to bucket transfer – Ramp studies: orbits, tunes, slope – Further e-cooler set-up – Set-up of nominal cycle; obtain nominal emittances – Bunched beam extraction 12/11/2015T.Eriksson CERN BE/OP/AD9

ELENA setting-up 5 Further studies with pbars: Space charge studies on higher intensity bunches (extraction on lower harmonics); compatibility with ejection lines Deceleration efficiency > 60% ? Synthetic B-train, validation for use in regular operation => ELENA ring commission complete – ~4 months total time available – Overly optimistic ? 12/11/2015T.Eriksson CERN BE/OP/AD10

ELENA setting-up 6 New transfer lines: 18/8 – 10/ keV pbars or H- – Setting-up of ~ 100m electrostatic xfer lines – u-wire “semi-non-destructive” profile monitors – Set-up of deflectors used for fast switching between experiments – Set-up of beam request/distribution SW/HW 2 months available 12/11/2015T.Eriksson CERN BE/OP/AD11

Operation Sequencing 1/3  Based on ADE sequencing concepts  ELENA will have a virtual super cycle  ELENA cycle can be: Coupled to the Production Chain (beam from ADE) Standalone mode (beam from source)  Goals  Optimize the beam request in the beam production chain  Maximize the beam availability for experiments  Maximize the MD beams  Bunches destination «On Demand» and prioritized ELENA Project Review - S.Pasinelli CERN BE/OP12/11/2015

Sequencing 2/3 12/11/2015ELENA Project Review - S.Pasinelli CERN BE/OP

Sequencing 3/3 12/11/2015ELENA Project Review - S.Pasinelli CERN BE/OP

Bunches Extraction Timings 12/11/2015ELENA Project Review - S.Pasinelli CERN BE/OP

Constrains No more action on the ADE from experiments Enable/disable extraction kicker Static settings in the Common Transfer Lines 12/11/2015ELENA Project Review - S.Pasinelli CERN BE/OP

Operation Manpower Commissioning (immediately after AD start-up): – Op-team will work from ACR – AD start-up/operation + ELENA commissioning in 2016 – 2 shifts per day can be covered, (weekends) by team of 7/8 – Eq. specialists will also participate (EN, TE, BE/ABP etc.) – External help is welcome, discussions underway. Once AD/ELENA operational stability obtained: – Machine supervisor from BE/AD/OP team will look after the machines during day-time and be on-call on weekly basis 24h/24, 7d/7 – BE/OP/PS section will do routine operation + initial troubleshooting from the ccc during nights and weekends – Equipment groups ensure “piquet” or best-effort coverage – Note: yearly AD start-ups are very time-consuming, with ELENA even more so 12/11/2015T.Eriksson CERN BE/OP/AD17