POCC activities AMS02 meeting at KSC October 11 th 2010.

Slides:



Advertisements
Similar presentations
AMS operations on March 5-10 Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai,
Advertisements

DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
AMS TIM, CERN Apr 12, 2005 AMS Computing and Ground Centers Status Report Alexei Klimentov —
OO Software and Data Handling in AMS Computing in High Energy and Nuclear Physics Beijing, September 3-7, 2001 Vitali Choutko, Alexei Klimentov MIT, ETHZ.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
G. Maron, Agata Week, Orsay, January Agata DAQ Layout Gaetano Maron INFN – Laboratori Nazionali di Legnaro.
Status of AMS Regional Data Center The Second International Workshop on HEP Data Grid CHEP, KNU G. N. Kim, J. W. Shin, N. Tasneem, M. W.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
1 AMS-02 POCC & SOC MSFC, 9-Apr-2009 Mike Capell Avionics & Operations Lead Senior Research Scientist ISS: 108x80m 420T 86KW 400km AMS: 5x4x3m 7T 2.3+KW.
AMS-02 JMDC On-Board Application Software Review Xudong CAI / M.I.T. Mar. 1, KSC.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
Evolution of Monitoring System for AMS Science Operation Center
AMS Summary 16:00 on Mon 26 Mar 2018 (GMT 085) To
16:00 on Tue 3 Apr 2018 (GMT 093) To 16:00 on Wed 4 Apr 2018 (GMT 094)
AMS Summary 16:00 on Thu 29 Mar 2018 (GMT 088) To
16:00 on Mon 2 Apr 2018 (GMT 092) To 16:00 on Thu 3 Apr 2018 (GMT 093)
AMS Summary 16:00 on Wed 24 Oct 2018 (GMT 297) To
AMS Summary 16:00 on Mon 29 Oct 2018 (GMT 302) To
AMS Summary 16:00 on Wed 31 Oct 2018 (GMT 304) To
AMS Summary 16:00 on Mon 22 Oct 2018 (GMT 295) To
AMS Summary 16:00 on Mon 19 Nov 2018 (GMT 323) To
AMS Summary 16:00 on Thu 15 Nov 2018 (GMT 319) To
AMS Summary 16:00 on Fri 16 Nov 2018 (GMT 320) To
AMS Summary 16:00 on Wed 21 Nov 2018 (GMT 325) To
AMS Summary 16:00 on Wed 14 Nov 2018 (GMT 318) To
AMS Summary 16:00 on Tue 20 Nov 2018 (GMT 324) To
AMS Summary 16:00 on Fri 05 Oct 2018 (GMT 278) To
16:00 on Thu 8 Nov 2018 (GMT 312) To 16:00 on Fri 9 Nov 2018 (GMT 313)
AMS Summary 16:00 on Fri 9 Nov 2018 (GMT 313) To
16:00 on Fri 2 Nov 2018 (GMT 306) To 16:00 on Mon 5 Nov 2018 (GMT 309)
16:00 on Tue 6 Nov 2018 (GMT 310) To 16:00 on Wed 7 Nov 2018 (GMT 311)
AMS Summary 16:00 on Fri 23 Nov 2018 (GMT 327) To
AMS Summary 16:00 on Thu 22 Nov 2018 (GMT 326) To
16:00 on Wed 5 Dec 2018 (GMT 339) To 16:00 on Thu 6 Dec 2018 (GMT 340)
AMS Summary 16:00 on Mon 12 Nov 2018 (GMT 316) To
AMS Summary 16:00 on Fri 30 Nov 2018 (GMT 334) To
AMS Summary 16:00 on Wed 23 Jan 2019 (GMT 023) To
AMS Summary 16:00 on Mon 28 Jan 2019 (GMT 028) To
AMS Summary 16:00 on Wed 9 Jan 2019 (GMT 009) To
AMS Summary 16:00 on Fri 11 Jan 2019 (GMT 011) To
AMS Summary 16:00 on Mon 14 Jan 2019 (GMT 014) To
AMS Summary 16:00 on Thu 24 Jan 2019 (GMT 024) To
AMS Summary 16:00 on Wed 13 Feb 2019 (GMT 044) To
AMS Summary 16:00 on Mon 18 Feb 2019 (GMT 049) To
AMS Summary 16:00 on Fri 15 Feb 2019 (GMT 046) To
AMS Summary 16:00 on Tue 19 Feb 2019 (GMT 050) To
AMS Summary 16:00 on Thu 14 Feb 2019 (GMT 045) To
AMS Summary 16:00 on Thu 10 Jan 2019 (GMT 010) To
AMS Summary 16:00 on Tue 26 Feb 2019 (GMT 057) To
AMS Summary 16:00 on Mon 25 Feb 2019 (GMT 056) To
AMS Summary 16:00 on Fri 22 Feb 2019 (GMT 053) To
AMS Summary 16:00 on Fri 12 Apr 2019 (GMT 102) To
AMS Summary 16:00 on Mon 15 Apr 2019 (GMT 105) To
AMS Summary 16:00 on Thu 11 Apr 2019 (GMT 101) To
AMS Summary 16:00 on Thu 18 Apr 2019 (GMT 108) To
AMS Summary 16:00 on Tue 30 Apr 2019 (GMT 120) To
16:00 on Fri 3 May 2019 (GMT 123) To 16:00 on Mon 6 May 2019 (GMT 126)
Bad Runs Alberto Oliva, July 2012.
AMS Summary 16:00 on Fri 10 May 2019 (GMT 130) To
AMS Summary 16:00 on Mon 13 May 2019 (GMT 133) To
AMS Summary 16:00 on Tue 14 May 2019 (GMT 134) To
AMS Summary 16:00 on Wed 22 May 2019 (GMT 142) To
16:00 on Tue 2 Jul 2019 (GMT 183) To 16:00 on Mon 8 Jul 2019 (GMT 189)
AMS Summary 16:00 on Wed 10 Jul 2019 (GMT 191) To
AMS Summary 16:00 on Tue 9 Jul 2019 (GMT 190) To
AMS Summary 16:00 on Thu 11 Jul 2019 (GMT 192) To
16:00 on Mon 8 Jul 2019 (GMT 189) To 16:00 on Tue 9 Jul 2019 (GMT 190)
AMS Summary 16:00 on Thu 04 Oct 2018 (GMT 277) To
Presentation transcript:

POCC activities AMS02 meeting at KSC October 11 th 2010

main goals finalize sub-system operations finalize DAQ operations finalize system operations

main goals finalize sub-system operations finalize DAQ operations finalize system operations finalize monitoring tools data taking for subdetector studies data taking for system studies

finalize sub-system operations data taking for subdetector studies TOF: scan of thresholds TRD: trigger delay scan Tracker: thresholds optimization (event size) RICH: PMT gain calibration ECAL: verify behavior with both power on (A & B) … Flight hardware needed

finalize DAQ operations JBUX Modification of startup and power steps for using command files. New DAQ and TAS run procedures by using command files Automatic restart DAQ when event mismatch Level-3 trigger and data compression … FS and Flight hardware needed

finalize system operations Modification of UG task GPS task TTCS tasks Star Tracker task On-board temperature monitor task … FS and Flight hardware needed

finalize monitoring tools work is in progress on subsystems new monitoring ready in 6-7 weeks general test before the end of November Critical Health Data …

data taking for system studies long term performance of the system MDR verification muon flux measurement

collected statistics at KSC

the measurement  30 h data CERN  Considering the acceptance ratios SCM/PM ~ 10, we roughtly need 300 h

the use of the data  30 h data CERN

Statistics Needed = 3  level 2 TeV < 3  > 3  A. Oliva

AMS POCC for ISS SOC AMS GSC-N Voice Loop Commands Nominal: All Data Cmds to GSC-N All Data All Data: Science Data, Monitoring Data A+B, ISS Ancillary Data and Critical Health Data 1. Shift Leader (alt. Commander) 2. Commander 3. DAQ+Trigger +RunControl 4. Data Handling 10. Thermal 5. Tracker+Laser Align.+Cooling 6.TRD+TRD Gas 7. TOF+ACC 9. ECAL 8. RICH 0. Management Functional Data Flow in the POCC (in reality, everything is done over Ethernet with the Switch in the center of a star configuration). Voice Loop Open source voice loop server handles internal communications and mixes in voice channel to/from NASA. Commands One specific station can actually send commands, others can prepare them. Video Live NASA video feeds are just another network service. “All Data” Stored, processed and redistributed from the Storage Server. Extra processing power provided by Processing Node. POIC, MSFC, AL The Wall POCC Station: PC + 2 Screens + headset + laptop location Consultants 12. On call 13. Liason